GENERAL
The specifications and requirements under this section cover the general scope of supply, install,
testing and commissioning for the electrical services for the whole project.
Specifications and compliances to be complied are as follows:
1. Jabatan Kerja Raya Malaysia (JKR): LS1, 2, 3, 5, 6, 9, 10, 12, 13-15 & LS20
2. Akta Bekalan Elektrik 1990
3. Peraturan Peraturan Elektrik 1994 UBBL 1972
4. Jabatan Bekalan Elektrik & Gas(JBEG)
5. Jabatan Kesihatan Dan Keselataman Pekerja (DOSH)
6. Jabatan BOMBA dan Penyelamat Malaysia
The scope of works for this development will include the following:
1.2.1 LV SYSTEM
E/1
ELECTRICAL
____________________________________________________________________________________________________________________
E/2
ELECTRICAL
____________________________________________________________________________________________________________________
The Electrical Contractor shall be responsible for the testing of the cable.
Test shall include continuity, phasing out and insulation resistance
between conductor and between conductor and sheath by employing a 500
volts insulation tester. The Electrical Contractor shall ensure that the
installation if safe before the cable is energized.
E/3
ELECTRICAL
____________________________________________________________________________________________________________________
disconnect the capacitor from the circuit in the event of pressure built-up
within capacitor. Each capacitor shall be provided with suitable means to
discharge the capacitor to 50 volts or less within 60 seconds from an initial
peak voltage of √2 times the rated voltage. No isolating device, fuse or
otherwise shall be placed between capacitor and the discharge device. The
capacitor shall be rated at 525volts, 50Hz. The regulator shall incorporate
minimum following automatic switching sequence modes.
1.2.1.10 SWITCHROOM
Approved type of rubber mat shall be provided in front of switchboards
and any other control boards. The rubber mat shall extend to the full length
of the switchboards, and shall be of thickness not less than 6mm and width
1000mm. Standard notices displaying the words „BAHAYA‟ and
„DILARANG MASUK‟ and Electrical Shock Treatment Chart shall be
provided and installed at a place as required in accordance with Electricity
Regulations 1994. Signage with words „BILIK SUIS UTAMA‟, „BILIK
SUIS‟, „BILIK KHIDMAT ELEKTRIK‟ and „DILARANG MEROKOK‟
shall be installed for all rooms containing electrical switchboard
equipment. All electrical switchrooms shall be be provided with one unit
9kg dry powder fire extinguisher for A,B,C class of fire complete with
pressure gauge, discharge/hose with nozzle installed on wall bracket.
1.2.1.11 LUMINAIRES
FLORESCENT LUMINAIRES - Florescent luminaries shall be of the
type approved by SIRIM and comply with MS 619 and relevant part of
IEC 60598. For 18 watts and 36 watts fluorescent tubes, the watt loss of
the ballast shall be no more than 8 watts. Florescent luminaries shall have
housing made from good quality mild steel sheet of minimum thickness
0.50mm and shall be of sound and rigid construction suitable for
suspended installation. Unless specified the colour temperature of the tube
shall be approximately 4000K. The light output, after 100 hours, shall not
be less than 1350 lumens for 18 watts tube and 3350 lumens for 36 watts
tube.
E/4
ELECTRICAL
____________________________________________________________________________________________________________________
E/5
ELECTRICAL
____________________________________________________________________________________________________________________
of 25mm x 3mm annealed copper tape. Each test point shall be installed at
2500mm above the ground level. Each earth termination connected to the
down conductor shall have a resistance to earth not exceeding the 10
Ohms. The whole of the lightning protective system shall have a combined
resistance to earth not exceeding 10 Ohms. Bonding conductor of 70mm²
PVC insulated green/yellow twin coloured cable shall be provided for
connection between the earth termination for the lightning protection
system at the testing joint and the main earthing bar for the electrical
installation
Within three calendar months after the practical completion of the project, one
CD, one set of true to scale negative (155/155 gm AO or A1 size) and four sets of
prints for each of the following drawings shall be submitted.
1. Site plan
2. Layout plan
3. Schematic plan
4. All approved shop drawing
In addition, four set of the following manual and operation for all services related
shall be supplied:-
1. Installation manual
2. Operation manual
3. Services and maintenance manual
4. Part list
5. Product data and catalogue
E/6
ELECTRICAL
____________________________________________________________________________________________________________________
1.5 END