Download as pdf or txt
Download as pdf or txt
You are on page 1of 36

ET-482 SUPERVISED INDUSTRIAL TRAINING

LOGBOOK

BACHELOR OF ELECTRICAL ENGINEERING TECHNOLOGY

FACULTY OF ENGINEERING PRACTICES AND SCIENCE

STUDENT NAME: M AFZAAL FARIDI

REGISTRATION NO: 1104E-F19-015

NAZEER HUSSAIN UNIVERSITY


ST-2, Block 04, Federal ‘B’ Area, Karachi 75950
http://www.nhu.edu.pk
NAZEER HUSSAIN UNIVERSITY
FACULTY OF ENGINEERING PRACTICES AND SCIENCE

ET-482 SUPERVISED INDUSTRIAL TRAINING

LOGBOOK
Personal Detailed:

Student Name: M Afzaal Faridi


Student Roll Number: 1104E-F19-015
Address: House No 73 street no 07 Sector 2 naval colony haroon
bahria hub river road Karachi, Pakistan, 75790
Email: afzaalfaridi114@gmail.com
Course of Study: Supervised Industrial Training (ET-482)
Year/Semester of Study: 2022 / 7th Semester
Training Start Date: 12-September-2022
Training End Date: 30-December-2022

Training Organization Details:

Name: Pakistan Navy


Address: Dockyard Road, West Wharf, Karachi, Pakistan, 72500
Training person: Mr. Abdul Israr Danish
Contact Number: 03402011837
Daily Training Log
1ST WEEK

Date Time Training Log

08:00 Orientation of Power House & Introduction to Power House Staff (Deputy
12-SEP-2022 To
Manager, Assistant Manager, Foreman & Supervisor etc.)
17:00

08:00 Familiarization of Working flow, Standard Operating Procedure &


13-SEP-2022 To
Documentation.
17:00

08:00 Lecture for Safety Precautions, Hazard Identification & Personal Protective
14-SEP-2022 To
Equipment.
17:00

08:00
15-SEP-2022 To One Day Training of Fire Fighting
17:00

08:00
16-SEP-2022 To One Day Training of First Aid
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

______________________ _________________________
Trainee signature with date Supervisor signature with date
Daily Training Log
2ND WEEK

Date Time Training Log

08:00
19-SEP-2022 To Operation of Diesel Generator
17:00

08:00
20-SEP-2022 To Diesel Generator Parts & Systemic Maintenance Routines
17:00

08:00
21-SEP-2022 To Load Management & Distribution of Electricity
17:00

08:00
22-SEP-2022 To Learn about Change of Filters (Diesel, Air & Lube Filter) of DG
17:00
08:00
23-SEP-2022 To Learn about DG Cooling System
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
3RD WEEK

Date Time Training Log

08:00 Learn and Perform Earth & Ground Testing (Using The Megger &
26-SEP-2022 To
Earthing Tester)
17:00

08:00
27-SEP-2022 To SOP for Emergency Shut Down of DG
17:00

08:00 Learn And Perform Testing of Solenoid Valve & Temperature Sensor (PT-
28-SEP-2022 To
100)
17:00

08:00
29-SEP-2022 To Control of DG with Respect to Frequency & RPM
17:00

08:00
30-SEP-2022 To Method of DC Voltage Regulation
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
4TH WEEK

Date Time Training Log

08:00 Safety Relays (Over Load, Under load, Short Circuit, Earth Leakage,
03-OCT-2022 To
Power Factor, Phase Failure, Ground Failure)
17:00

08:00 Sync Relay (Program Based Synchronization Relay) Simulator and


04-OCT-2022 To
Parameter Testing
17:00

08:00
05-OCT-2022 To Learn and Perform Synchronization of DGs
17:00

08:00 (Connector Changed Fault Observe in Dynamo (No Voltages Generation),


06-OCT-2022 To Fault Diagnose (Issue in Excitation Voltages), Battery Bank’s Connector
17:00 damage due to lose connection. Troubleshoot)

08:00
07-OCT-2022 To General Instructions for Control & Instrumentation
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
5TH WEEK

Date Time Training Log

08:00
10-OCT-2022 To Learn & Observe Working of CT & PT
17:00

08:00
11-OCT-2022 To Operational Study of Measuring Instruments
17:00

08:00
12-OCT-2022 To CT & PT Operation with Measuring Instruments
17:00

08:00
13-OCT-2022 To CT & PT Operation with Safety Control Equipment
17:00

08:00
14-OCT-2022 To DG Excitation System Training
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
6TH WEEK

Date Time Training Log

08:00
17-OCT-2022 To Theory of Power Factor & It’s Effects on Generation System
17:00

08:00
18-OCT-2022 To Methods of Power Factor Correction
17:00

08:00
19-OCT-2022 To Learning about Capacitor Effect on Power Factor
17:00

08:00
20-OCT-2022 To Uses of Capacitor Bank for Power Factor Correction
17:00

08:00 Practice of Capacitors Connections (Star, Delta, Series & Parallel) &
21-OCT-2022 To
Differentiate Effects
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
7TH WEEK

Date Time Training Log

08:00
24-OCT-2022 To Working of Capacitor Bank with Load & Power Factor Correction
17:00

08:00 Fault Observe in Control Room VCB Tripped, Fault Diagnose:


25-OCT-2022 To Distribution line short due to tree’s branches in rainy weather, Fault
17:00 Troubleshoot: Tree’s branches trimmed
08:00
26-OCT-2022 To Power Factor Correction Capacitors Testing
17:00
08:00
27-OCT-2022 To Auxiliary Devices of PFC (Power Factor Analyzer, CB, MC, Fuses)
17:00
08:00
28-OCT-2022 To Overview & Discussion on Previously Obtained Training
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
8TH WEEK

Date Time Training Log

08:00
31-OCT-2022 To Introduction of Circuit Breaker & It’s Types
17:00

08:00
01-NOV-2022 To Uses of Circuit Breaker w.r.t Types
17:00

08:00 Working Of VCB (Vacuum Circuit Breaker), VCB Using by Training


02- NOV -2022 To
Institution
17:00
08:00
03- NOV -2022 To Methods of Spring Charging of VCB
17:00
08:00
04- NOV -2022 To Practice of VCB Working
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
9TH WEEK

Date Time Training Log

08:00
07- NOV -2022 To Learn About Distribution System of Electrical Power (11KV)
17:00

08:00
08- NOV -2022 To Types & Parts of Distribution System
17:00
08:00
09- NOV -2022 To Learn Insulator, Insulator Types & Selection (w.r.t Voltage)
17:00
08:00
10- NOV -2022 To Testing of Insulator
17:00
08:00
11- NOV -2022 To Pole
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
10TH WEEK

Date Time Training Log

08:00
14- NOV -2022 To Types of Poles
17:00

08:00
15- NOV -2022 To Pole Use for 11kv Distribution
17:00
08:00
16- NOV -2022 To Assign a Task to Install AVR Card in 50KVA Generator.
17:00
08:00
17- NOV -2022 To Learn Practically How to Install Batteries in Series and Parallel
17:00
08:00
18- NOV -2022 To Learn the Function of Self-Starter
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
11TH WEEK

Date Time Training Log

08:00
21- NOV -2022 To Learn how Dynamo Works
17:00

08:00
22- NOV -2022 To Assign Task to Remove Alternator of 602KVA DG
17:00
08:00
23- NOV -2022 To 200KVA DG Not Running Due to Mal-Functioning of Control Module
17:00
08:00 Alternator of 600KVA DG Coupled with Engine and Self-Starter Fitted
24- NOV -2022 To
But the Fuel Pump Mal-Functioning
17:00
08:00
25- NOV -2022 To SATisfactory Trial of 200KVA DG
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
12TH WEEK

Date Time Training Log

08:00
28- NOV -2022 To 60KVA DG's Alternator Removed from Engine.
17:00

08:00
29- NOV -2022 To Stopper Coil of 150KVA DG's Checked and Found Defected.
17:00
08:00 250KVA DG's Self- Starter Mal-Functioning Due to Defected
30- NOV -2022 To
Startingrelay So Replaced with New One.
17:00
08:00
01- DEC -2022 To Installation of 34KVA DG's Panel Wiring.
17:00
08:00
02- DEC -2022 To 50KVA DG Not Starting Control Module Checked and Found
17:00 Defected.

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
13TH WEEK

Date Time Training Log

08:00 15KVA DG Trail on 50% Load and Temperature Raised Upto


05- DEC -2022 To
100°C in 1 Hour ME Fault.
17:00

08:00 4.5KVA DG AVR Card Mal-Functioning Replaced with New


06- DEC -2022 To
One.
17:00
08:00
07- DEC -2022 To 6.5 KVA DG's Diodes Solider with Pilot Rotor.
17:00
08:00 125KVA DG's Routine Carried Out and Self-Starter and
08- DEC -2022 To
Alternator FoundSAT While Dynamo Mal-Functioning.
17:00
08:00
09- DEC -2022 To 3KVA DG's Trail on 80% Load Found SAT.
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
14TH WEEK

Date Time Training Log

08:00 15KVA DG Not Starting Due to Faulty Start Delay Timer so Timer
12- DEC -2022 To
replaced with new one.
17:00

08:00
13- DEC -2022 To Received 6.5KVA Stator and Excitor from Winding Shop.
17:00
08:00 6.5KVA DG not Starting Due to Starting Switch and Spark Plug
14- DEC -2022 To
Mal-Functioning.
17:00
08:00 34KVA DG Inspected Wiring Work and Insulation Improvement
15- DEC -2022 To
Required.
17:00
08:00
16- DEC -2022 To 230KVA DG's Actuator Replaced Now Working OK.
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
15TH WEEK

Date Time Training Log

08:00
19- DEC - To 15KVA DG's Temperature Rises Quickly ME Fault.
2022 17:00

08:00 50KVA DG's Frequency Getting Down Due to Governor Card


20- DEC - To
Mal-Functioning.
2022 17:00
08:00
21- DEC - To 32KVA DG Received Incoming Inspection Carried Out.
2022 17:00
08:00
22- DEC - To 60KVA DG's Diodes Solder with Pilot Rotor.
2022 17:00
08:00
23- DEC - To 125KVA DG's Routine Carried Out Alternator & Starter Found
2022 17:00 SAT.

declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
16TH WEEK

Date Time Training Log

08:00
26- DEC -2022 To 250 KVA DG's Safeties Checked Out Working SAT.
17:00

08:00
27- DEC -2022 To 2.5KVA DG's Trials All Parameters Found SAT.
17:00
08:00 70 KVA DG Inspected and Main Stator & Pilot Insulation Found
28- DEC -2022 To
Low.
17:00
08:00
29- DEC -2022 To 3KW DG Workshop Trial Found SAT at 80% Load.
17:00
08:00
30- DEC -2022 To 4.5KVA DG AVR Card Found Defected and Replaced with New
17:00 One .

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
NAZEER HUSSAIN UNIVERSITY
FACULTY OF ENGINEERING PRACTICES AND SCIENCE

ET-482 SUPERVISED INDUSTRIAL TRAINING

LOGBOOK

Personal Detail

Student Name: M Afzaal Faridi


Student Roll Number: 1104E-F19-015
Address: House No 73 street no 07 Sector 2 naval colony Haroon
Bahria hub river road Karachi, Pakistan, 75790

Email: afzaalfaridi114@gmail.com
Course of Study: Supervised Industrial Training (ET-482)
Year/Semester of Study: 2022 / 8th Semester
Training Start Date: 13-February-2023
Training End Date: 02-June-2023

Training Organization Detail

Name: Pakistan Navy


Address: Dockyard Road, West Wharf, Karachi, Pakistan, 72500
Training person: Mr. Abdul Israr Danish
Contact Number: 03402011837
Daily Training Log
17TH WEEK

Date Time Training Log

08:00 70KVA DG's Rotor and Excitor Received from Wash Varnish Shop
13-FEB-2023 To
17:00 and Insulation Found OK.

08:00 250KVA DG Voltage Adjustment and All Safeties Checked Found


14-FEB-2023 To
17:00 SAT.

08:00
15-FEB-2023 To 300KVA DG Voltage and Frequency Adjusted for PQA.
17:00
08:00 32KVA DG Oil Pressure Sensor and AVR Card Mal-Functioning
16-FEB-2023 To
17:00 Replace Both and Found Result SAT.

08:00
17-FEB-2023 To
70KVA DG Parameters Inspection All Found SAT.
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
18TH WEEK

Date Time Training Log

08:00
20-FEB-2023 To 32KVA DG Trail on New AVR Card and Found SAT.
17:00

08:00 250KVA DG Wi ri ng Installation and Trials on 50% Load About


21-FEB-2023 To
17:00 1 Hour Found SAT.

08:00
22-FEB-2023 To 500KVA DG Incoming Inspection Carried Out.
17:00
08:00 70KVA DG Diode Soldered t o Diode Plates a nd Plates
23-FEB-2023 To
17:00 Connected t o Pilot Rotor.
08:00
24-FEB-2023 To 600KVA DG Coupling Plates Installed.
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
19TH WEEK

Date Time Training Log

08:00
27-FEB-2023 To 34KVA DG Checked on 80% Load Found SAT.
17:00

08:00
28-FEB-2023 To 100KVA DG Failed to Start, Self-Starter Found Defected.
17:00
08:00 250KVA DG Oil Pressure Sensor & Guage Installed and AVR
01-MAR-2023 To
17:00 Voltage Adjust and Run for 30 Minutes Found SAT.

08:00 32KVA DG Temperature Sensor Malfunctioning Replaced w ith


02-MAR-2023 To
17:00 New One Now Found SAT.

08:00 34KVA DG Work OK o n 55% Trails, Control Module Need


03-MAR-2023 To
17:00 t o b e Replaced

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
20TH WEEK

Date Time Training Log

08:00 150KVA DG Trails on 80% Load After The Installation of New


06-MAR-2023 To
17:00 AVR Card And Found SAT.

08:00 4.5KVA DG AVR Card Mal-Functioning, Replaced And Found


07-MAR-2023 To
17:00 SAT.

08:00
08-MAR-2023 To 600KVA DG Bearing Installed to The Rotor.
17:00
08:00
09-MAR-2023 To 6.5 KVA DG Bearing Fitted and Alternator Coupled to The Engine.
17:00
08:00 32KVA DG AVR Card Mal-Functioning and Oil Pressure
10-MAR-2023 To
17:00 Defected Need to be Replaced

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
21ST WEEK

Date Time Training Log

08:00
13-MAR-2023 To 5KVA DG Inspected and Considered BER.
17:00

08:00
14-MAR-2023 To 150KVA DG AVR Found Defected Need to be Replaced.
17:00

08:00
15-MAR-2023 To 32KVA DG AVR Oil Pressure & Water Temperature Sensors
17:00 Installed.
08:00
16-MAR-2023 To 15KVA DG Trail on 80% Load Found SAT.
17:00
08:00
17-MAR-2023 To 75KVA DG Safeties Inspection and Found SAT.
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
22ND WEEK

Date Time Training Log

08:00
20-MAR-2023 To 6.5KVA DG Stator and Rotor Received from Winding Shop.
17:00

08:00 15KVA DG During Trial o n 25% Load The Temperature Rises to


21-MAR-2023 To
17:00 90°CME WIP.

08:00 100KVA DG Failed to start, Self- Starter Pinion Slipped on Fly


22-MAR-2023 To
17:00 Wheel ME WIP.

08:00
23-MAR-2023 To 150KVA DG Performance Trail Carried Out and Found SAT.
17:00
08:00
24-MAR-2023 To 32KVA DG Inspection Panel Wiring Need to be Replaced.
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
23RD WEEK

Date Time Training Log

08:00
27-MAR-2023 To 230KVA DG Actuator and Fuel Pump Fitted and Found SAT.
17:00

08:00
28-MAR-2023 To 15KVA DG Temperature Rises on Load ME WIP.
17:00
08:00 50KVA DG Frequency Getting Down Due t o Mal-Functioning
29-MAR-2023 To
17:00 of F u e l P u m p ME WIP.

08:00
30-MAR-2023 To 32KVA DG Incoming Inspection Carried Out.
17:00
08:00
31-MAR-2023 To 65KVA DG Diodes Soldered to Pilot.
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
24TH WEEK

Date Time Training Log

08:00
03-APRIL-2023 To 5KVA DG Control Wiring Replaced.
17:00

08:00
04-APRIL-2023 To 125KVA DG Routine Carried Out Found SAT.
17:00
08:00
05-APRIL-2023 To 60KVA DG Safeties Inspection Found SAT.
17:00
08:00
06-APRIL-2023 To 2.5KVA DG Inspection All Parameters Found SAT.
17:00
08:00 70KVA DG Rotor a nd Stator's Insulation Found Low Handed
07-APRIL-2023 To
17:00 Over t o SWash Varnish Shop.

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
25TH WEEK

Date Time Training Log

08:00
10-APRIL-2023 To 45KVA DG Safeties Checked Found SAT.
17:00

08:00 6.5KVA DG Rotor Received f rom Wash Varnish Shop a nd


11-APRIL-2023 To
17:00 Insulation Found SAT.

08:00
12-APRIL-2023 To 15KVA DG Failed to Start ME WIP.
17:00
08:00
13-APRIL-2023 To 250KVA DG Oil Pressure Sensor and Guage Installed.
17:00
08:00
14-APRIL-2023 To 4.5 KVA DG Trails Found SAT.
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
26TH WEEK

Date Time Training Log

08:00 300KVA DG Starting Button o f Module Not Working Handed


17-APRIL-2023 To
17:00 Over t o PCB Shop.

08:00
18-APRIL-2023 To 160KVA DG Control Wiring Installed.
17:00
08:00 50KVA DG AVR Mal-Functioning Voltage Shoot Up to 500volts
19-APRIL-2023 To
17:00 AVR Need to be Replaced.

08:00 600KVA DG Excitor Found Sort Circuit Handed Over to Winding


20-APRIL-2023 To
17:00 Shop.

08:00
21-APRIL-2023 To Today is Public Holiday (EID-UL-FITAR)
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
27TH WEEK

Date Time Training Log

08:00
24-APRIL-2023 To Today is Public Holiday (EID-UL-FITAR)
17:00

08:00
25-APRIL-2023 To Today is Public Holiday (EID-UL-FITAR)
17:00
08:00 300KVA DG Starting Button o f Module Not Working Handed
26-APRIL-2023 To
17:00 Over t o PCB Shop.

08:00
27-APRIL-2023 To 160KVA DG Control Wiring Installed.
17:00
08:00 50KVA DG AVR Mal-Functioning Voltage Shoot Upto 500volts
28-APRIL-2023 To
17:00 AVR Need to be Replaced.

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
28TH WEEK

Date Time Training Log

08:00
01-MAY-2023 To Today is Public Holiday (LABOUR DAY)
17:00

08:00
02-MAY-2023 To 250KVA DG Incoming Inspection Carried Out.
17:00
08:00 70KVA DG Alternator Dismantle Rotor a nd Excitor Insulation
03-MAY-2023 To
17:00 Found Low.

08:00
04-MAY-2023 To 150KVA DG Safety Card Mal-Functioning, Handed Over to PCB
17:00 Shop.
08:00
05-MAY-2023 To 65KVA DG Rotor Received from Winding Shop.
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
29TH WEEK

Date Time Training Log

08:00
08-MAY-2023 To HVAC (Heat Ventilation Air Conditioning)
17:00

08:00
09-MAY-2023 To Operation of HVAC System
17:00
08:00
10-MAY-2023 To Parts of HVAC System
17:00
08:00
11-MAY-2023 To Maintenance Routines of HVAC System
17:00
08:00
12-MAY-2023 To Control System for HVAC System
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
30TH WEEK

Date Time Training Log

08:00
15-MAY-2023 To Relays and Sensors Used in HVAC System
17:00

08:00
16-MAY-2023 To HVAC System Air Condition Function
17:00
08:00
17-MAY-2023 To Thermal Expansion Valve
17:00
08:00
18-MAY-2023 To Condenser Operation
17:00
08:00
19-MAY-2023 To Compressor for HVAC System
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
31ST WEEK

Date Time Training Log

08:00
22-MAY-2023 To Chiller and Cooling Tower
17:00

08:00
23-MAY-2023 To Heating Coil in HVAC System
17:00
08:00
24-MAY-2023 To Air Circulating Fan
17:00
08:00
25-MAY-2023 To Duct System for HVAC System
17:00
08:00
26-MAY-2023 To Heat Pump Working
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
Daily Training Log
32ND WEEK

Date Time Training Log

08:00
29-MAY-2023 To Change of Air Filter of HVAC
17:00

08:00
30-MAY-2023 To Cleaning of Condenser and coils
17:00
08:00 Functional Check of Sensors and Magnetic Connectors in Control Panel of
31-MAY-2023 To
HVAC System
17:00
08:00 Checking Oil Level in Compressor & Lubrication All Moving Part of
01-JUNE-2023 To
HVAC System
17:00
08:00 This day is my last training day so my supervisor conducted to the test
02-JUNE-2023 To
about his training practically and theoretically.
17:00

Declaration:
I, M Afzaal Faridi Student identification number 1104E-F19-015 , do
hereby declare that all Information provided above is true and correct to the best of my knowledge.

_________ ____________ _________________________


Trainee signature with date Supervisor signature with date
NAZEER HUSSAIN UNIVERSITY
ST-2, Block 04, Federal ‘B’ Area, Karachi 75950
http://www.nhu.edu.pk

You might also like