DRILLING ENHANCEMENT | ROLLER GUNDRILL REAMER

CASE STUDY | Dual Roller GunDRILL Reamers®


U.A.E, Middle East

M AK I N G I T B ET T ER . M AK I N G I T SI M PL E . M AK I N G I T H APPEN . | 1
DRILLING ENHANCEMENT | ROLLER GUNDRILL REAMER

Roller GunDRILL Reamer® Features:


PDC Cutters on leading and
trailing blades of the RGDR
enable efficient reaming in or PDC cutting structure placed on the
back-reaming out of the leading edge of the blade. Cutting
hole. structure starts near the tool body
diameter and extends to just below the
tool gage diameter.
Note: Cutters can also be placed on the
back of the blades for added durability.

Roller cutters at full gage diameter ream


the hole and provide an excellent torque
signature. High level of TCI coverage and
sealed bearings ensure long life for the
system.
Large junk slot area allows for plenty of bypass
area for cuttings even in high ROP applications

M AK I N G I T B ET T ER . M AK I N G I T SI M PL E . M AK I N G I T H APPEN . | 2
DRILLING ENHANCEMENT | ROLLER GUNDRILL REAMER

Dual Roller GunDRILL Reamer®: Eliminates Backreaming,


reduces tripping times, casing runs to bottom every time!
WELL PROFILE APPLICATION

U.A.E, Middle East

▲ Multi oil production wells, U.A.E,


Middle East.
CUSTOMER
▲ 12-1/4” drilling & tripping using PD
CHALLENGE 900 Orbit, RSS, full LWD suite (SLB).
▲ Client defined benchmark wells were
▲ Wellbore Stability drilled using 12-1/4” NM stabilizers
▲ Stuck Pipe placed the top DC.
▲ Excessive Back-reaming ▲ Manage plastic formation
▲ Time to trip pipe ▲ High Surface RPM +170 for drilling
▲ Lost BHA ▲ 20 wells and counting have been
drilled using 12-1/4” Roller GunDRILL
▲ Plastic formation Reamers (RGDR) replacing the
stabilizers. With 2x RGDR tools per
string.

M AK I N G I T B ET T ER . M AK I N G I T SI M PL E . M AK I N G I T H APPEN . | 3
DRILLING ENHANCEMENT | ROLLER GUNDRILL REAMER

Dual Roller GunDRILL Reamer® Results:

▲ Average 80% time improvement on tripping ▲ Back-reaming eliminated


▲ Average ROP +150ft/hr ▲ No stuck pipe
▲ Drilled to TD in one run (over 4,900ft MD drilled) ▲ Margin between break-over TQ and off bottom TQ very low
▲ No cavings observed ▲ Smooth casing deployment in OH facilitated by improved
▲ Very little drag observed, lower OH FF wellbore quality