Professional Documents
Culture Documents
Steel Weights Per Phase
Steel Weights Per Phase
613,307.573
PHASE 1 TOTAL
ORIG. 613,307.573
REQUIRED
REMARKS
UNIT WT. NET WT.
PHASE 2
ORIG. 371,181.13
REQUIRED
REMARKS
UNIT WT. NET WT.
PHASE 3
TOTAL PHASE 3
334,125.96
ORIG. 344,125.96
INSTALLED: 334,461.73
UNINSTALLED: 9,664.23
307.36
303.29
371.32
629.1
184.36
341.9
491.69
326.54
360.78
164.24
164.35
2234.93
1250.02
890.18
1644.19
9,664.23
REQUIRED
PHASE 4
PHASE 5
88,196.97
ORIG. 168,069.94
INSTALLED: 88,196.97
UNINSTALLED: 79,872.97
79,872.97
REQUIRED
PHASE 6
TOTAL 109,094.47
ORIG. 109,094.47
INSTALLED 5,509.14
UNINSTALLED 103,585.33
6926.95
665.68
45242.02
11713.78
27603.41
2780.35
8653.14
103585.33
REQUIRED
Service Elevator
5935.07
Canopy Frame
6A-MJ-6013 pcs 1 25 25 -
43,704.89