RESTORE SURFACE TO MATCH

EXISTING CONDITIONS
LEGEND: ORIGINAL GRADE
ONE (1) GROUND ROD C/W
#3AWG BARE GROUND WIRE. #12 AWG STRANDED, INSULATED, COPPER, TWH #12 AWG STRANDED
(GREEN) GROUND WIRE TO LUMINAIRES SEE INSULATED COPPER
A LIGHTING STANDARD TYPE A, 120V, 53W C/W 2-FIXTURES NOTE 1 TWH RISERS SEE NOTE 1
COOPER LUMARK RIDGEVIEW MODEL A LP-2
A #LDRV-SL3-E02-E-PER7-8030-DIM-BK-MA1186-XX C/W SMART ARED1
LIGHTING CONTROL NODE OR APPROVED EQUAL. POLE SHALL FUSE HOLDER KIT SEE NOTE 2
BE STRESS CRETE MODEL #E-210-AP0-G-E11 DIRECT BURIED G A
POLE, REFER TO DETAIL. COMPRESSION CONNECTORS, COPPER
TO COPPER WITH INSULATING COVERS RIGID PVC CONDUIT AS
900mm (MIN.) CABLE MARKING TAPE
2#8+GRD 53mm NOTED ON DRAWINGS
ENTIRE WIDTH OF TRENCH
B LIGHTING STANDARD TYPE B, 120V, 53W C/W 1-FIXTURE COOPER RPVC DUCT GROUND STUD
LUMARK RIDGEVIEW MODEL
#LDRV-SL4-E02-E-PER7-8030-DIM-BK-MA1182-XX C/W SMART LP-1 HANDHOLE
B
LIGHTING CONTROL NODE OR APPROVED EQUAL. POLE SHALL ARED1 CONDUCTOR SIZES AS
BE STRESS CRETE MODEL #E-210-AP0-G-E11 DIRECT BURIED COMPACTED
2#8+GRD 53mm RIGID PVC CONDUIT AS NOTED ON DRAWINGS SHOWN ON DRAWINGS
POLE, REFER TO DETAIL. NATIVE BACKFILL
RPVC DUCT
STRANDED LINE
6mm SCREENED SAND
OR SCREENED EARTH INSULATED
XLP EXISTING LIGHTING POLE, BRACKET & FIXTURE TO BE REMOVED RWU90 (XLPE) NEUTRAL
290mm FEEDER CONDUCTORS IN RIGID POWER SUPPLY G G G SECONDARY
SURFACE MOUNTED CONDUIT C/W WIRING AS NOTED P.V.C. CONDUIT. REFER TO PEDESTAL "A" CONDUCTORS GROUND (GREEN)
DRAWINGS FOR QUANTITIES 40A, 120V, 1∅, 2W C/W
THREE (3) GROUND RODS MIN. #8 AWG #6 AWG BARE STRANDED
DIRECT BURIED CONDUIT C/W WIRING AS NOTED 40A-2P MAIN BREAKER COPPER GROUND WIRE
COMPACTED TRENCH BOTTOM SPACED 3m APART C/W
CABLE TO GROUND ROD
NOTES: 98% PROCTOR DENSITY #3AWG BARE GROUND WIRE. 21mm DIA. RIGID PVC CONDUIT
CONNECTION CADWELD
G GROUND ROD
PROCESS OR APPROVED
1. THE CONTRACTOR SHALL SAW CUT ASPHALT AND OR CONCRETE PAVING AS REQUIRED TO 2#4+GRD
POWER SUPPLY PEDESTAL EQUAL
PROVIDE TRENCHING WHERE SHOWN ON DRAWINGS. INCLUDE COSTS FOR SAW CUTTING AND 53mm RPVC DUCT NOTES:
40A, 120V, 1Ø SEALING OF ASPHALT JOINT WITH HOT POURED RUBBERIZED ASPHALT SEALANT. COPPER CLAD (FULL
1. BROKEN LINES INDICATE ADDITIONAL CONDUCTORS FOR DOUBLE LUMINAIRE INSTALLATION AND / LENGTH) SOLID STEEL
2. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO TENDER AND INFORM THEMSELVES OF ALL
ABBREVIATIONS: AREAS THAT REQUIRE ASPHALT RESTORATION OR CONCRETE RESTORATION AND INCLUDE ALL EXISTING ALECTRA UTILITIES PAD
OR ALTERNATE CIRCUIT IN ACCORDANCE WITH PLATFORM LIGHTING AND WIRING DIAGRAM
DRAWINGS.
GROUND RODS 20mm DIA.
x 3m LONG, AS INDICATED
COSTS. DRAWINGS DO NOT INDICATE AREAS THAT ARE ASPHALT OR CONCRETE. MOUNT TRANSFORMER ON LAYOUT DRAWINGS TO
RPVC RIGID PVC CONDUIT CO-ORDINATE WITH ALECTRA 2. IN-LINE WATERPROOF FUSEHOLDER 6OOV, 3OA WITH BREAKAWAY FEATURE. GOULD GEB-11-11 C/W OBTAIN SPECIFIED
3. IN GRASSED AREAS, THE CONTRACTOR SHALL PROVIDE 150mm TOP SOIL AND SEED. MAINTAIN UTILITIES FOR POWER SERVICE WATERPROOF INSULATING BOOTS AND ONE 10 AMP FUSE TYPE KTK 600 VOLTS OR APPROVED RESISTANCE TO GROUND
RGSC RIGID GALVANIZED STEEL CONDUIT SEED UNTIL ACCEPTANCE BY CONSULTANT. (BRING DUCT AND CABLES TO EQUAL.
TRANSFORMER AND CO-ORDINATE
4. SURFACE COURSES AND REQUIREMENTS SHOWN FOR REFERENCE ONLY. PROVIDE SURFACES CONNECTIONS) 3. ALL GROUNDING WIRES TO BE FITTED WITH COMPRESSION LUGS BEFORE SECURING TO GROUND
EX EXISTING EQUIPMENT TO REMAIN COURSES AND FINISHES IN ACCORDANCE WITH SITE CONDITIONS AND TO MAKE REPAIRS TO STUD IN POLE.
RESEMBLE EXISTING SITE CONDITIONS.
HW HANDWELL
PATHWAY LIGHTING STANDARD POLE
CCT. CIRCUIT
1 TRENCH DETAILS 2 SINGLE LINE DIAGRAM 3 WIRING DIAGRAM (120V SYSTEM)
E01 SCALE: N.T.S. E01 E01 SCALE: N.T.S.

LOADING TABLE - POWER SUPPLY PEDESTAL 'A'


40A, 120V, 1Ø, 2W
CIRCUIT BRKR LOAD DESCRIPTION LOAD TOTAL
NO. LOAD
ARED1 15A LP-1, LP-2 159W 159W

TOTAL 159W

2#8+GRD, 53mm∅
RPVC U/G
2#8+GRD, 53mmØ
RPVC U/G

120V, 1Ø
SUPPLY

40A-1P
MAIN

15A-1P
B A A

ONE (1) GROUND


ROD C/W #3AWG
BARE GROUND WIRE
N
2#8+GRD, 53mm
POWER SUPPLY RPVC CONDUIT
PEDESTAL "A"

4 LIGHTING WIRING DIAGRAM G


A
E01 SCALE: N.T.S.

A 3 MAR. 26, 2024 ISSUED FOR TENDER CM


LP-2 2 FEB. 12, 2024 ISSUED FOR CLIENT REVIEW CM
ARED1
GENERAL NOTES: 1 AUG. 03, 2023 ISSUED FOR CLIENT REVIEW CM
No. DATE REVISIONS BY

1. THE CONTRACTOR IS RESPONSIBLE FOR ALL UNDERGROUND


STAKE-OUT AND UTILITY LOCATES. THE CONTRACTOR SHALL
PROVIDE PUBLIC AND PRIVATE LOCATES FOR ALL OF SITE AND
INCLUDE ALL COSTS. THE CONTRACT DRAWINGS DO NOT SHOW
ALL EXISTING UNDERGROUND UTILITIES. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO BECOME INFORMED
OF THE EXACT LOCATION OF, AND ASSUME ALL LIABILITY FOR, XLP B
DAMAGE TO ALL UTILITIES, SERVICES AND STRUCTURES THREE (3) GROUND RODS
WHETHER ABOVE GROUND OR BELOW GRADE. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
SPACED 3m APART C/W INFRASTRUCTURE AND ENGINEERING SERVICES
#3AWG BARE GROUND WIRE
UTILITIES AND SERVICES IN WORKING AREA PRIOR TO LP-1 INFRASTRUCTURE DELIVERY DIVISION
CONSTRUCTION AND SHALL PROTECT THESE UTILITIES AND ARED1 POWER SUPPLY
PEDESTAL 'A' NORTH STAMP
SERVICES TO THE SATISFACTION OF THE CONCERNED UTILITY
COMPANIES AND OWNERS. INCLUDE ALL COSTS FOR EXPOSING 2#4+GRD, 53mm RPVC
EXISTING LIGHTING STANDARD TO BE
UTILITIES AND SERVICES, MAINTAINING REQUIRED CLEARANCES, CONDUIT
REMOVED AND DISPOSED. DISCONNECT
HAND DIGGING AND STRUCTURAL SUPPORT OF UTILITIES AND
BACK TO SOURCE. COORDINATE WITH
SERVICES. DAMAGES BY THE CONTRACTOR SHALL BE EXISTING ALECTRA
ALECTRA UTILITIES.
RESTORED TO THE OWNER AT NO EXPENSE TO THE OWNER. UTILITIES HYDRO
TR PARK G PAD MOUNT
G
2. EXCAVATION SHALL BE HAND DIG NEAR EXISTING UTILITIES. SIGN G TRANSFORMER
INCLUDE ALL COSTS.
PS
3. ONCE ALL LOCATES FOR BURIED SERVICES ARE OBTAINED,
PREPARE ROUTING PLAN FOR NEW BURIED SERVICES,
PROJECT NAME
ADHERING TO ALL MINIMUM HORIZONTAL AND VERTICAL
SEPARATION REQUIREMENTS. FOR CROSSING OVER OR
PASSING UNDER UTILITIES REFER TO O.P.S.D. STANDARD No. KOZAK PARK REVITALIZATION
2103.05.
DRAWING TITLE
4. FISH ALL CONDUIT AND PROVIDE POLY PULL ROPE. PROVIDE
SPARE POLY PULL ROPE IN ALL NEW & EXISTING CONDUITS CONTRACTOR SHALL COORDINATE ELECTRICAL PLAN, DETAILS AND NOTES
WHERE WIRING IS INSTALLED AND WHERE CONDUITS ARE BEING EXCAVATION IN THIS AREA WITH
LEFT AS SPARES. EXISTING U/G UTILITIES.
2#8+GRD, 53mm DRAWN DESIGNED DATE
RPVC CONDUIT CONTRACTOR SHALL HAND DIG
5. POWER INTERRUPTIONS SHALL BE KEPT TO A MINIMUM AND FOR INSTALLATION OF CONDUIT. NV CM 2023-07-12
ONLY OCCUR AFTER HOURS ( EVENING AND WEEKENDS) AT CHECKED APPROVED TENDER No.
TIMES AGREEABLE TO THE OWNERS DISTURBANCE TO FACILITY
OPERATIONS IS MINIMIZED. OBTAIN OWNER'S PERMISSION TWO CR. CM CM RFQ-2410082
ON
(2 WEEKS) BEFORE SHUTDOWNS. INCLUDE ALL COSTS. ENS SCALE 1.5m 0 3m 6m DRAWING No.
5 ELECTRICAL SITE PLAN STE
PH
1:150
6. NO SPLICES BELOW GRADE ARE PERMITTED. E01 SCALE: 1:150 CADD FILE
E1
60mm (2 - 3 8") OD TENON PHOTOCONTROL
(SMART LIGHTING CONTROL NODE)

CONCRETE LIGHTING POLE

OCTAGONAL CONCRETE POLE AS


MANUFACTURED BY STRESSCRETE
MODEL #E-210-AP0-G-E11 ECLIPSE
(BLACK) ETCHED.
53mm DIA. FLEXIBLE
ENT TUBING
4.877m (16')

1000
FINISHED GRADE

300
6.400m (21')

900 150
NAME PLATE

HANDHOLE AND COVERPLATE RWU90 LIGHTING FEEDER COPPER CLAD GROUND


(90mm x 270mm) ROD (20mm x 3.0m)
WITH THERMIT WELD
600 CONNECTOR
(WHERE SHOWN ON
GRASS 53mm DIA. RIGID PVC DUCT DRAWINGS)
914mm

SOIL BACKFILL
1000mm RIGID PVC DUCT TO BE #6 AWG. BARE STRANDED
CONNECTED TO FLEXIBLE COPPER GROUND WIRE
WALKWAY TUBING WITH SOLVENT
WELDED ADAPTER (IPEX
457
mm

WIRING APERTURE
600
mm

ARIG-20, OR APPROVED EQUAL)


EXISTING GRADE
1.524m (5'-0")

150mm WIDE RED PLASTIC WARNING TAPE


REFER TO DUCT TERMINATION AND
1067mm

UNDISTURBED GROUNDING AT CONCRETE


SOIL LIGHTING POLES DETAIL BELOW.
BELOW GRADE WIRING
APERTURE (100mm x 254mm) 2 NEW LIGHTING POLE DETAIL LP-1, LP-2
CONCRETE BACKFILL E02 SCALE: N.T.S.

600mm GRAVEL STONE COMPACTED 100% SPD


NOTES: 150mm

ALL EXCAVATIONS MUST BE FREE OF LOOSE SOIL AND DEBRIS PRIOR TO FOUNDATION INSTALLATION AND CONCRETE BACKFILL
PLACEMENT. TEMPORARY CASINGS OR DRILLERS SLURRY MAY BE USED TO STABILIZE THE EXCAVATION DURING INSTALLATION. CASINGS
MUST BE REMOVED DURING CONCRETE BACKFILL PLACEMENT. CONCRETE BACKFILL MUST BE PLACED WITH A TREMIE WHEN SLURRY OR
WATER IS PRESENT WITHIN THE EXCAVATION OR WHEN THE FREE DROP EXCEEDS 1.8m (6.0'). SUMMARY OF: LIGHTING POLE ASSEMBLIES
CONTRACTOR MUST BE FAMILIAR WITH THE COMPLETE SOIL INVESTIGATION REPORT AND BORINGS, AND CONTACT THE GEOTECHNICAL
FIRM (IF NECESSARY) TO UNDERSTAND THE SOIL CONDITIONS AND THE POSSIBILITY OF GROUND WATER PUMPING AND EXCAVATION LOCATION POLE ARM BRACKET LUMINAIRE
STABILIZATION OR BRACING DURING PRECAST BASE INSTALLATION AND PLACEMENT OF CONCRETE BACKFILL. POLE
LAMP LAMP DIST. PC NOTES
CONCRETE: No. PARK NAME STATION INSTL. MAT. LENGTH INSTL. MAT. LENGTH INSTL.
WATTAGE TYPE TYPE 7-PIN
CONCRETE SHALL BE AIR-ENTRAINED AND HAVE A MINIMUM COMPRESSIVE DESIGN STRENGTH AT 28 DAYS OF 20 MPa (2,900 PSI). 20 MPa
(2,900 PSI) CONCRETE SPECIFIED FOR EARLY POLE ERECTION. ACTUAL REQUIRED MINIMUM ALLOWABLE CONCRETE STRENGTH IS 7 MPa LP1 KOZAK PARK - 1.0m NEW CONCRETE 6.4m - - - NEW 2-53W LED IV YES C/W 7 PIN PHOTOCELL
(1,000 PSI). ALL PIERS AND CONCRETE BACKFILL MUST BEAR ON AND AGAINST FIRM UNDISTURBED SOIL. 1 GROUND ROD &
LP2 KOZAK PARK - 1.0m NEW CONCRETE 6.4m - - - NEW 1-53W LED III YES
7 PIN PHOTOCELL
PROVIDE COMPACTION TESTING FOR GRANULAR MATERIAL AT POLE BASE FOR APPROVAL BY CONSULTANT.

1 NEW LIGHTING POLE DETAIL LP-1, LP-2


E02 SCALE: N.T.S.

TYPICAL MATERIAL NOTES: 501.65mm


400.05mm
ENCLOSURE MAT'L-
10 GAUGE (0.100") THICK ALUMINUM SHEET METAL

EXTERIOR POWDERCOAT COLOUR-


Ø15.88mm TYPICAL FOR
"EQUIPMENT GREEN", A DARK FOREST GREEN COLOUR,
FOUR CORNER HOLES
PROTECH PS211G58 POWDER COAT. 73.02mm
127.00mm 203.19mm
BACKPLATE MAT'L-
Ø19.05mm TYPICAL FOR 38.10mm
MINIMUM 18 GAUGE (0.050") THICK SATIN COATED MILD STEEL
TWO CENTER HOLES 685.80mm
SHEET. LEFT IN MILL FINISH.
4
406.40mm
1067mm PANEL-
SQUARE D CAT.# CQO112M100PC, 12CCT., 2P, 3W 457.20mm
COMBINATION SERVICE ENTRANCE PANEL. 3 MAR. 26, 2024 ISSUED FOR TENDER CM

MAIN BREAKER- BASEPLATE MOUNTING 2 FEB. 12, 2024 ISSUED FOR CLIENT REVIEW CM
5 1 AUG. 03, 2023 ISSUED FOR CLIENT REVIEW CM
SQUARE D CAT# QOM40VHL, 40AMP 2 POLE WIRE RANGE DIMENSION
#4-2/0 AL/CU, 22KA I.C. RATING. No. DATE REVISIONS BY

LOAD BREAKER-
127mm SQUARE D CAT# QO SERIES SINGLE POLE- QO
(15A=AMPERAGE)
444mm 393mm (SEE PEDESTAL PART NUMBER FOR BREAKER DESCRIPTION) 457.20mm REAR OUTSIDE VIEW
247.65mm
MAIN NEUTRAL LUG-
WIRE RANGE #4-2/0 AL/CU
203.20mm 457.20mm
CONSTRUCTION SPECIFICATIONS: LOAD NEUTRAL LUGS- INFRASTRUCTURE AND ENGINEERING SERVICES
WIRE RANGE 1 LUG #4-2/0 AL/CU INFRASTRUCTURE DELIVERY DIVISION
1. CONCRETE PROPERTIES: 4500PS1 (32MPa) MIN 3 LUGS #14-1/0 AL/CU, 8 LUGS #14-#6 AL/CU
STRENGTH 6-8% AIR ENTRAINMENT. NORTH STAMP
FASTENERS- SQUARE D 12 CCT.
2. WEIGHT - 540 lbs / 220kg (APPROXIMATE). 4-PLATED HEX HEAD BOLTS, 1/2"x13x2" GRADE 2 OR BETTER BREAKER PANEL WITH
4-PLATED 1/2" FLAT WASHERS 40A MAIN BREAKER
3. 1 - FOUR(4) 1/2" N.C. NYLON THREADED INSERTS. 4-PLATED 1/2" LOCK WASHERS 14 GAUGE BACKPLATE
559mm FOR MOUNTING INTO CONCRETE MOUNTING BASE. (SUITABLE FOR
4. 2 - FOUR(4) 3/4" THOUGH HOLES. DRILLING AND TAPPING)
685.80mm
5. 3 - SIX(6) CABLE ENTRY PVC SEALS.

GALVANIZED STEEL
UNI-STRUT TO FASTEN
Ø10.41mm HOLE SIZE OUTGOING FIELD CONDUITS PROJECT NAME
508mm 305mm 406mm
IN LOCKABLE LATCH 152.40mm
FOR PADLOCK
406mm KOZAK PARK REVITALIZATION
53mm PVC CONDUIT 2x53mm PVC CONDUITS
FOR INCOMING FEED DRAWING TITLE
3
432mm ELECTRICAL DETAILS
RIGHT SIDE FRONT OUTSIDE VIEW WITH
OUTSIDE VIEW BOTH FRONT PANELS REMOVED DRAWN DESIGNED DATE
NV CM 2023-07-12
CHECKED APPROVED TENDER No.
CM CM RFQ-2410082
SCALE DRAWING No.
3 PRECAST PEDESTAL FOUNDATION 4 POWER SUPPLY PEDESTAL ENCLOSURE "A" (SLS UN-METERED PEDESTAL) N.T.S.
E02 SCALE: N.T.S. E02 SCALE: N.T.S. CADD FILE
E2