BILL OF QUANTITY FOR CHANGE/SITE INSTRUCTION Rev-03

PROYEK : IK2M-03002101
SI NO. : IK2M-600-10-EN_STI-ADK-0008, Rev 0
DESC. : Temporrary Road Access from FBB1 building to Laydown Area
CONTRC : PT Adhi Karya
TANGGAL 20 January 2024

HARGA SATUAN HARGA TOTAL


REMARK
NO. URAIAN SATUAN VOLUME JASA MATERIAL JASA MATERIAL

1 ROAD 1&3 (TEMPORARY ROAD NORTH SIDE LAYDOWN + BATCHING PLANT)


Excava on in so soil (SPT<20) including shoring, water pumping and disposal as per SPC-
1.1 0002 M3 573.33
1.2 Backfilling and compac ng exis ng soil in layers as per SPC-0002 up to 6% CBR M3 297
1.3 Structural grade lime stone filling with compac on ll 55% CBR M3 593
1.4 Basecourse filling and compac ng up to 70% CBR M3 395

4 ROAD 2 (EXISTING ROAD)


4.1 Structural grade base course filling with compac on ll 70% CBR M3 571.20

SUB-TOTAL : - -

NOTE : - DURATION : Shall be completed on priority in 10 days. TOTAL : - -


VAT 11 % : - -
TOTAL + VAT : - -
GRAND TOTAL : -
ROUNDED : -
USD : - ( 1 USD = IDR 15,000.- )

Prepared By Checked by Approved by Approved by Approved by

Christine / Samir Chaubal Danny G. (Liu Ya Dong) (Babu Thomas) ( Jen Tseng Chao ) (Cheng Fei) ( Kosim Sutiono) ( Hendri Gunawan )
Engineer PIC: Civil Area Manager / Deputy Project leader / Project Leader Finance Mill Head

Page 1of 1 01/29/2024