Concept of OEE :- Total Time

Total Time ( 365 X 24 Hrs)


Available Time
Legal Holidays :- Generally 26/01, 15/08, 02/10
Available Time = Total Time – Legal Holidays.

Unutilised Capacity Losses


Available Loading Time

Legal Holidays
• Bank (Paid) Holidays.
• Shift Pattern

Availability Related
Loading Time
• Planned Stoppage Time :- Commn, Circle Meet

Losses
Performance
This sum up Un-utilized Capacity Losses Operating Time

Related
Losses
Available Loading Time = Avl Time – UUCL
Quality
Value Operating Time
1. Breakdown Loss. Losses
2. Planned Maint Loss
3. Start-up Loss Availability
4. Set-up / Changeover Loss Related Overall Equipment Effectiveness(OEE) = A.R X P.R X Q.R
5. Tool Change Loss Losses
6. Management Loss Availability Rating (AR) = Avl Loading Time – Avl Rel Losses (D/n time)
7. Logistics Loss Available Loading Time
Performance
1. Minor Stoppages Related Performance Rating (PR) = Loading Time – Performance Related Losses
2. Speed Loss Losses Loading Time
1. Defect & Rework Loss Quality Quality Rating (QR) = Value Operating Time VOT = OK Products
2. Adj & Measurement Loss Losses Operating Time Speed