GATE 3 : INLINE QUALITY CONTROL

Inline Inspection:
Each operation is checked at least twice a day,
Equipment:
Critical operations are 100% checked.
Good/rework/reject baskets,

Identified Inline
QC station

Inspected
(pass) cut
bundles.

Approved Standard
Standard: Reports/Records:
A complete approved sample is displayed, Inspection report with number of Pass/Re-
An approved mockup up is available and Work/Reject pieces
displayed for critical operations.

Process & Method – Carrefour 5 Quality Gates