Lean MFG

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

"Lean" and the Toyota

Production System
Robert W. Hall

any companies emulate the Toyota ufacturing," a descendent of TPS made

M Production System (TPS), but


there's only one original —
Toyota's. Each Toyota location has its own
popular by the Lean Manufacturing
Institute.1
Comparing the offshoots with the
personnel and process history, so each rootstock is inevitable when attending
learning journey has assumed a local fla- "Overview of the Toyota Production
vor. To prevent the system's DNA from System," a workshop being given twice a
being corrupted, a "mother plant" sows its year for AME audiences by TSSC, a Toyota
TPS seeds in each new Toyota location, subsidiary. The biggest differences relate to
almost always a green field site. Most how TPS, much more than lean, empha-
Toyota experience converting another sys- sizes developing people to solve basic
tem to TPS is with suppliers and other com- process problems.
panies they have assisted.
Whenever Toyota transplanted the Process Mapping vs. True North
system to other companies, variations
Lean implementations are likely to
appeared; no Toyota supplier has DNA
start with overall process flow charts called
identical to Toyota. As others re-interpret-
Value Stream Maps, a term attractive to the
ed TPS, variations became more distinct.
dollar minded. These help leaders visualize
Some of these have clustered in "lean man-
how to proceed with implementation. First
they construct an "as is" flow chart, some-
times opening their eyes to how much
waste lards their operations. Then they
construct a "to be" chart representing a
slimmer, trimmer future. Comparing the
In Brief "as is" with the "to be" chart generates a
vision for implementation, including a few
driving performance indicators. They also
Differences between the Toyota Production System, as practiced by Toyota, identify big blobs of muda as initial targets
and lean manufacturing are significant. Two of those are that TPS empha- for kaizen event teams.
sizes worker development for problem solving and spends much more time The charts also prompt up front strate-
creating standardized work, which lean seldom incorporates. gic decisions. What will be the effect on
capacity, employment, and cash flow? Why

22
Target Volume 20, Number 3
kaizen processes that should be outsourced customer in a million receives a defect,
or eliminated entirely? For example, com- we're not at True North — zero unhappy
panies have found that, in modest volumes, customers. The same rigor applies to zero
printed circuit boards can't be made on-site waste and lot sizes of one in sequence. Of
competitively if waste were zero — can't course, Toyota rarely reaches absolute
afford the capital and can't keep up with zero, but going for it prevents complacency
the technology. about performance that is great by other
Guided by Value Stream Maps, man- people's standards. As long as Toyota is
agement leads the implementation. Overall south of True North, they have problems to
goals are quantified as indicators for a work on — somewhere.
"dashboard" to track progress toward the The purpose of TPS is not rapid mate-
vision. Kaizen events then start attacking rial per se, but process visibility. Smooth
sub-processes. Staff are likely to direct the flow is only one factor that makes it easier
attacks. to spot that one-in-million problem.
Toyota doesn't start with Value Stream Visibility spotlights the teeniest little bits of
Maps. Initially they marshal the changes in waste, prompting more kaizen. Of the
sub-processes by heading them all True seven classic wastes, Toyota deems over-
North. "Material and information flow" production the most serious; any of the
charts appear much later to link processes other six may begin with that one.
and march them along together. Because deployment depends on each
True North is what we should do, not site's history of processes and working cul-
what we can do, the ultimate ideal for the ture, neither Toyota nor lean practitioners
overall process, and for every sub-process employ unwavering formulas for it.
within it. There is no other vision. Point However, Toyota's "creates" TPS. Lean
every person and every sub-process True practitioners more likely "implement lean."
North; once they are all loping along in the Toyota stresses that TPS is human develop-
same direction, they will easily merge into ment. Lean organizations frequently try to
a common takt time. That is, Toyota grubs stretch the worker-to-supervisor ratio.
the waste out of sub-processes before link- Toyota keeps foremen or team leaders, con-
ing them closely. verting them into coaches and backups for
In Figure 1, both human development workers. However, everyone agrees that
and process revision (for customer satisfac- the human side, learning new patterns of
tion) are trekking True North. The word working and thinking is the highest hurdle.
selection of the last bullet point under
"human development" intimates more.
Lean Implementation
"Professional development," by direct expe-
rience more than formal training, inter- In a lean implementation, leaders as
twines with process improvement. well as workers may be feeling their way,
Everyone, including all workers, learns coaching less from experience than discov-
how to solve problems and improve ery as you go. Sensing that the work cul-
processes. If someone else does it, then ture must build up to lean, leadership may
"turns the process over to production," first do something to engage people in
workers are ill prepared to continue kaizen problem solving, become familiar with
on their own. To become professional process visibility, and improve teamwork as
workers in this sense, they should experi- a way of life. For example, they may insti-
ence how and why their process was devel- tute 5S before starting cell building, and big
oped. TPS grows people in all their talents cultural leaps, like moving from an inde-
— even some they didn't know they had. pendent craft tradition, can be painful and
On the customer satisfaction side of time-consuming. A few go "cold turkey" to
Figure 1, the ideals of True North are cell building.
absolute. Zero defects means zero — none. But once they begin integrated opera-
Not even Six Sigma is good enough. If one tional conversion, lean leaders convert

23
Third Issue 2004
Heading for True North

Figure 1. The Toyota concept of heading for True North.

Value Stream Maps into to key process Staff and management almost always
measures and blitz processes with kaizen direct a lean conversion. Usually, a con-
events. Kaizen teams may pounce on sultant more experienced in the journey
some fat targets first, but to integrate the guides them at first. Workers participate,
effort, they usually start at final assembly and one objective of most kaizen events is
and work back, setting up work to flow, as to give them first hand experience learning
in a cell. They calculate takt times and bal- and using the tools of process improve-
ance station workloads to them. Often, but ment. Training varies, but almost all com-
not always, conversion is kaizen event by panies add instruction in lean techniques to
kaizen event, each one addressing prob- the formal training of all employees.
lems that plug workflow, such as quality, Being sidetracked by current operating
setup times, maintenance, training, sched- pressures is always a hazard, but with per-
uling system, and so on. Pull systems start sistent top management leadership, within
tying the flow of operations together. a year or two most work flows by a pull sys-

24
Target Volume 20, Number 3
tem from door-to-door. With most of the flow. Set up local flows to produce only the
initial heavy moving over, a plant may quantity needed when needed. Any pull
declare itself lean, although there is much systems between areas are simple, like
more to do. Improvement never ends. min-max kanban squares. The emphasis is
Management raises the vision, refreshes on condensing cells and layout; cutting
the indicators on the "dashboard," and setup times; minimizing lot sizes. Where
drives again, this time extending the effort possible go to one-piece flow with no stock
beyond the plant into product design, engi- between stations. Doing this effectively
neering, office work, perhaps even sales requires mastering multi-functional work
and suppliers. While every case is unique, and group problem solving. Keep this up
this general theme describes many sus- until the workforce does it routinely.
tained lean conversion stories. Quality problems always lurk in prod-
uct, in equipment, and elsewhere. Learn to
build quality into each step of a process.
TPS Creation
Eliminate inspections using andons, poke
Conversion concentrates on the shop yoke methods, and so on. Shorten the
floor, led by veterans of the system, rela- feedback time for correction by cell build-
tively sure of where they are going. Key ing, juxtaposing workstations, and cutting
process measurements are quality and lead- the inventory and leadtimes until process
times. The shop floor rarely sees unit cost variation is reduced because machines stop
measurements. If muda is disappearing, (or beg for adjustment) before a defect is
costs will come down; it's that simple. Plant actually made. Doing this deepens the vis-
efficiency is defined as ability to meet exact ibility, expanding the opportunities for
customer requirements with minimum problem solving.
resources: people, leadtime, and space. (It Start separating the work of people
may have extra equipment.) Toyota's logi- from that of machines; workers learn to
cal pattern is to introduce tools to increase tend multiple machines. Develop them to
process visibility, gradually stepping up the make maximum use of their abilities,
effectiveness of problem seeing and prob- adding value with every touch, rather than
lem solving. When people and process are wasting time merely monitoring machines
ready, move on. or inspecting parts. People may balance
Stabilization: Stability is the depend- work cycle times, but we have not yet got-
ability of man, machine, material, and ten to takt times.
method, the classic old 4Ms. The first Standardized Work: This is the big dif-
objective is to convert people from fire- ference between TPS and lean, begun while
fighting to deliberative problem solving. still in continuous flow. Standardized work
First create increased visibility in the cur- isn't only documentation. It's also an
rent process and expose problems, teach- improvement process; layout; work
ing people how to solve them using the five sequence, and work methods. Emphasis is
why's and the Deming Circle — and giving on human motion. To pace work, intro-
them their head to do it. Coach people duce takt times, and coach people to devel-
early and often to carefully observe and op efficient work flow to a takt time con-
document what they are doing now. Give sidering safety, quality, quantity, and cost
them the means to habitually improve their (use of resources). Continue coaching until
own work and the processes around them. workers with their team leaders can gener-
Don't go to continuous flow if big problems ate their own standard work. This usually
with quality, maintenance, or supply would takes the longest time, but Toyota consid-
be overwhelming. ers standardized work to be necessary to
Continuous Flow: This is the big step sustain the gains going True North, as illus-
increasing process visibility. The process is trated by Figure 2.
still loaded with waste, but predictable Because standardized work takes a
enough that it won't choke on continuous long time to mature, some Toyota plants

25
Third Issue 2004
Relationship Between Standardized Work and Improvement

Figure 2.

are much better developed than others. product using takt times and a pull system.
Tell-tale signs: (That's right; a detailed pull system goes in
• Near the work areas is evidence of late.) Plant workload is balanced with a
worker problem solving, real things in heijunka box, container lot sizes, and stan-
dard inventory at various points in the sys-
real time like scribbled flip charts, not
tem. Decreasing inventories a bit here and
sanitized computer graphic summaries.
there stresses the system just enough to
• Work details at each station are crisp; 5S
allow the workers, now capable of stan-
is detailed, so you can identify more
dardized work, to press as a total group
than the main flows of material.
toward True North. Sustained visibility
• Workers aren't moving at breakneck
shines light on every little pebble in the
pace, but are so concentrated on value
path to True North, so every process
added activity that they've less time to
improver in every little nook of the total
banter or even smile at visitors.
process should see something to think
Thus TPS standardized work com- about and to work on.
bines the disciplines of improving work
with that of holding the improvement,
Summary
which sets up the ongoing elimination of
waste that most lean implementations Lean implementations, mapped and
never get to. Standardized work docu- planned, tend to be more "engineered" by
mentation is but the script for a play, often staff than TPS. If well planned, lean imple-
rewritten, which all actors that substitute menters may better anticipate business
roles adhere to and help rewrite. The issues, like increasing sales to absorb the
unfolding play is the thing, the distant cus- idle capacity released from productivity
tomer its unseeing audience. improvement. They may also anticipate the
Getting It All Together: Now orches- cultural changes that will be necessary.
trate improvement toward True North. If an Unfortunately, not all are carefully planned,
overall takt time is at all possible, every- and some cultural changes, as for standard-
thing is connected with production of end ized work, are rarely anticipated at all. A

26
Target Volume 20, Number 3
well-structured lean implementation may ly on machines, maintenance, quality,
consider adoption of the tools to be a suc- processes, or any other waste that stands in
cess, but allow people to remain underde- the way of total customer satisfaction —
veloped in problem solving, and detailed True North.
process problems to remain hidden.
Paradoxically, TPS creation, while more
organic and intent on developing people to Robert W. Hall is editor-in-chief of Target and
the max, just "bulldozes" through. TPS cre- a founding member of AME.
ation starts immediately on the shop floor,
developing people to unravel problems. TPS
tools are merely a method to change the Footnote:
work culture to problem solving mode, and 1. The adjective "lean" was first used to describe
TPS leaders may pay little heed to the cultur- operations by Toyota and other Japanese auto com-
al shock associated with this. The premise is panies in The Machine that Changed the World,
James P. Womack, Daniel T. Jones, and Daniel Roos,
that workers have vast, untapped potential
MIT International Motor Vehicle Program, 1990. "Lean
waiting to be tapped. Any system, IT or oth- manufacturing" rapidly became popular afterward.
erwise, that gets in the way of this goal is
discarded on faith that something better will
be invented from the chaos. To an extent © 2004 AME® For information on reprints, contact:
rarely found in lean manufacturing, TPS Association for Manufacturing Excellence
develops people to concentrate unrelenting- www.ame.org

27
Third Issue 2004

You might also like