A 1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND


HIGHWAYS

OFFICE OF THE BUILDING OFFICIAL

DISTRICT / CITY / MUNICIPALITY

LAND USE AND ZONING

LINE AND GRADE

ARCHITECTURAL

P E R S P E C T I V E
STRUCTURAL
T A B L E O F C O N T E N T S

A R C H I T E C T U R A L S T R U C T U R A L P L U M B I N G E L E C T R I C A L

A- 1 TABLE P- 1 FLOOR PLAN (WATER LINE LAYOUT) E- 1 LIGHTING LAYOUT


S- 1 GENERAL CONSTRUCTION FLOOR PLAN (SEWER LINE & DRAINAGE LAYOUT)
PERSPECTIVE POWER LAYOUT
S- 2 GENERAL CONSTRUCTION SCHEDULE OF FLOOR FINISHES
A- 2 FLOOR PLAN ROOF PLAN (SEWER & DRAINAGE LAYOUT)
S- 3 FOUNDATION PLAN P- 2
REFLECTED CEILING PLAN PLUMBING NOTES
E- 2 GENERAL NOTES
SANITARY
COLUMNS PLUMBING LEGENDS
SCHEDULE OF FLOOR FINISHES ELECTRICAL SYMBOLS
FOOTING TIE BEAMS & FOOTING DETAIL P- 3 ISOMETRIC DIAGRAM (SEWER & DRAINAGE LAYOUT)
SCHEDULE OF CEILING FINISHES ELECTRICAL RISER DIAGRAM
ISOMETRIC DIAGRAM (WATERLINE LAYOUT)
S- 4 ROOF BEAM DETAILS
A- 3 ROOF PLAN SCHEDULE OF LOADS AND COMPUTATIONS
END WALL DETAIL P- 4 SCHEDULE OF SLAB REINFORCEMENT
FRONT ELEVATION DETAIL OF CATCH BASIN SCHEDULE OF LIGHTING FIXTURES
STAIR ON FILL DETAIL OF SEPTIC VAULT
REAR ELEVATION
RAMP & RC. GUTTER DETAILS DETAIL OF SEPTIC VAULT (with REINFORCING
A- 4 RIGHT SIDE ELEVATION BARS)
S- 5 ROOF FRAMING PLAN
LEFT SIDE ELEVATION
DETAIL ELEVATION OF TRUSS
CROSS SECTIONS
SCHEDULE OF MEMBERS AND WELDS ELECTRICAL
LONGITUDINAL SECTION
REFERENCE WELD DETAIL
DETAIL BAY SECTION
S- 6 DETAIL PLAN OF TOILET
SPOT DETAIL (NON-SKID METAL NOSING STRIP)
DETAIL SECTIONS
SPOT DETAIL (RC. STAIR)
S- 7 SPOT DETAILS
A- 5
TYPICAL PLAN OF TOILET REFERENCE WELD DETAIL
DETAIL SECTION OF TOILET "THRU - A" S- 8 TRUSS ANCHORAGE DETAILS
DETAIL SECTION OF TOILET "THRU - B"
SPOT DETAIL (R.C. GUTTER) PURLINS TO END WALL CONNECTION
SPOT DETAIL (R.C. BENCH) LAVATORY DETAILS
MECHANICAL
CONCRETE BENCH DETAIL
A- 6 DETAIL PLAN OF RAMP
HANDWASH DETAILS
DETAIL ELEVATION OF RAMP
WALL FOOTING DETAIL
DETAIL SECTION (RAMP & CON. BENCH)
DETAIL LONGITUDINAL SECTION
SPOT DETAIL (HANDRAIL)
SCHEDULE OF DOORS AND WINDOWS

A- 7 DETAIL OF BLACKBOARD
- PLAN (TOP VIEW)
- PLAN (SECTIONAL VIEW)
- ELEVATION (FRONT VIEW)
- SECTION (SIDE VIEW)
- DET. SECTION (CHALK DUST BOX)

DESIGN CONCEPT:
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: APPROVED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TABLE OF CONTENTS
MODFIEIDSTANDARDDPWHD
-EPE
-D CADD BY: SIGNED
PERSPECTIVE APPROVED WITH SIGNATURE APPROVED WITH SIGNATURE APPROVED WITH SIGNATURE APPROVED WITH SIGNATURE
BUREAU OF DESIGN ONE(1)STOREY,FIVE(5)CLASSROOM
SCHOOLBUILDING
IRMA BINAG-BERNARDO
ARCHITECT III
BOD
A-1
JOSEPHINE P. ISTURIS LEA N. DELFINADO RAUL C. ASIS LEONOR M. BRIONES
BUILDINGS DIVISION W/TOILET@EACHCLASSROOM CHECKED: SIGNED B 7 20
PORT AREA, MANILA O
( PTO
I N1) MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE UNDERSECRETARY SECRETARY, DEPED
BONIFACIO DRIVE ARCHITECT IV

You might also like