Report No: - DCM/RN/2024/501 Report Date:13-04-2024

Project Reference: BECH

Release Note
Project: DCM Shriram Expansion Project Dates of all Release: 13-04-2024
WBS / AREA –BECH Supplier/Contractor M/S DHV
Subcontractor -
Area In-charge – Mr Jignesh Kumar

PO/Site Contract/Job reference-


SAC/B05/4250017006

Applicable Specs/DWG/QAP Reference and Revision:


SAC/B05/4250017006

NCR Reference: NIL


PO Completed: -
Inspection Report References :
Abnormalities / Non-Compliance observed:
Attached
No

Result - Accepted
Component / Activity Order / Contract
Offered Quantity Release Quantity
Description Quantity
PO Serial no 0010 6 Mater 6 Meter 6 Meter
SS316L EFW 32’’ Sch
20

Page 1 of 2
1.0 Scope of Inspection: Desktop review and Release
Vendor inspection report

2.0 Details and results of inspection and test: Document reviewed and found satisfactory

3.0 Identification of inspection item(s)/activity verified: Attached documents


4.0 Conclusion & Recommended Action: Accepted
5.0 Attachments (Inspection) reference reports:
Attached below

Inspection report

Agency/Department
Surveyor Name: Vivek Kumar DCM Project Engineer/Manager
Rep Name:

Sign/Seal
Sign/Seal

"In view of above, the vendor is not relieved under any circumstances and stands guarantee for
Mechanical Design , Engineering , Fabrication and Quality "

Page 2 of 2
reviewed
reviewed
reviewed
reviewed
reviewed
reviewed
reviewed
reviewed