Release Note
Project: DCM Shriram Expansion Project Dates of all Release: 13-04-2024
WBS / AREA –BECH Supplier/Contractor M/S DHV
Subcontractor -
Area In-charge – Mr Jignesh Kumar
Result - Accepted
Component / Activity Order / Contract
Offered Quantity Release Quantity
Description Quantity
PO Serial no 0010 6 Mater 6 Meter 6 Meter
SS316L EFW 32’’ Sch
20
Page 1 of 2
1.0 Scope of Inspection: Desktop review and Release
Vendor inspection report
2.0 Details and results of inspection and test: Document reviewed and found satisfactory
Inspection report
Agency/Department
Surveyor Name: Vivek Kumar DCM Project Engineer/Manager
Rep Name:
Sign/Seal
Sign/Seal
"In view of above, the vendor is not relieved under any circumstances and stands guarantee for
Mechanical Design , Engineering , Fabrication and Quality "
Page 2 of 2