F.

L
V.R
ISSUED FOR APPROVAL
V.R
19-02-2024

T-011 CONSTRUCTION OF A NEW 110/13.8kV SUBSTATIONS (MNA-5) TO


DEVELOP POWER SUPPLY FOR KIDANAH PROJECT AT MINA, MAKKAH

SIZING CALCULATIONS OF DC-DC CONVERTER


00

REVISIONS
DESIGNED
BY: BM
-
DATE:-
CHECKED
BY:
-
DATE:-
OPRG. DEPT
BY
DATE:-
ENG'G. DEPT.
BY:-
DATE:-
CERTIFIED.
BY:-
DATE:- AS BUILT BY DATE 19-02-2024
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

T-011 CONSTRUCTION OF A NEW 110/13.8kV T MK519 WD-820031 01 OF 02 00


SUBSTATIONS (MNA-5) TO DEVELOP POWER
SUPPLY FOR KIDANAH PROJECT AT MINA,
MAKKAH

CONTRACT NO: 4400019236


WOA SAUDI ARABIA JOB ORDER NO. 3-2312002.06 DWG. CONT. SHT. WE-818921

DMS EXCEL
F.L

GENERAL
V.R

DETAILS OF TELECOMMUNICATION LOAD

DC CONVERTER (1+1) SYSTEM CALCULATION BASED ON FINAL TELECOMMUNICATION LOAD


Per Unit
Per Unit Total Power
Consumption Power consumption
Equipment Qty Consumption Consumption in
with Efficiency in amps at 48V DC
ISSUED FOR APPROVAL

(Watts) Watts
(watts/0.9)
DVM CABINET 3 850 944.44 2833.32 59.03
MPLS-TP CABINET 1 868.55 965.05 965.05 20.11
SWITCH S5731-H48T4XC 1 259.2 288 288 6

Cyber security=249.6 watt


RFTS cabinet = 37.8 watt
IP telephone = 369 watt
V.R

Total Consumption in watts 2197.49 4815.7


Total Equipment Consumption in Amps 114.66 85.14
25% Safety/Design Factor 28.66 21.285
50% Spare Capacity Factor 57.33 42.57
Required output DC output Power in Amps 200.65 148.995
19-02-2024

210Amps 7 NO's
Selected Converter 150Amps (1+1)DC DC CONVERTER WITH EACH CABINET EQUIPPED WITH 5NO's OF
30AMPS BM4830DC MODULES

11760 W
THE PROPOSED CONFIGURATION I EQUIVALENT TO 6000W NOMINALOUTPUT POWER AND 6720W
MAXIMUM OUTPUT POWER. TOTALNUMBER OF ALL MODULES BMD4830 IS FIVE DC-DC CONVERTER
00

OUTPUT CURRENTTHE BRAGA MORO BMD4830 RATED OUTPUT CURRENT IS 150A


REVISIONS
DESIGNED
BY: BM
-
DATE:-
CHECKED
BY:
-
DATE:-
OPRG. DEPT
BY
DATE:-
ENG'G. DEPT.
BY:-
DATE:-
CERTIFIED.
BY:-
DATE:- AS BUILT BY DATE 19-02-2024
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

T-011 CONSTRUCTION OF A NEW 110/13.8kV T MK519 WD-820031 02 OF 02 00


SUBSTATIONS (MNA-5) TO DEVELOP POWER
SUPPLY FOR KIDANAH PROJECT AT MINA,
MAKKAH

CONTRACT NO: 4400019236


WOA SAUDI ARABIA JOB ORDER NO. 3-2312002.06 DWG. CONT. SHT. WE-818921

DMS EXCEL