B PLaster Work
1 Temporary Toilets Inside Opening 2.00 6.00 6.00 ( 72.00)
2 Cake Prepration Ouside Wall ( 2.00) ( 7.00) ( 11.50) ( 161.00)
3 Risers Near Temporary Toilets 4.00 5.5 1.33 ( 29.26)
4 Risers Near Temporary Toilets Wall 2 4.00 2.50 1.33 ( 13.30)
5 Front Pump Room Wall 1.00 4.00 1.16 ( 4.64)