Measurement Sheet Summary New Works

Sr.# Description Unit Qty Remarks


1 P.C.C Dismantling Cft ( 87.58)
2 Block Dismentling Sft ( 250.75)
3 R.C.C Work Cft ( 21.23)
4 Block Work Sft ( 103.92)
5 Plaster Work Sft ( 280.20)
6 PCC Pads Sft ( 409.78)
7 Paint Work Wall & Ceiling Sft ( 12,077.00)
8 Back Filling Cft ( 25.22)
9 Openings Nos ( 14.00)
10 Openings Closings Nos ( 27.00)
11 Tuff Tile Removing & Fixing Sft 80.5
12 Gi Doorframes Rft 33
13 Gi Doorframes Fixing Nos 4
MEASUREMENT SHEETS Gi Door Frames
ISM-BARAKAHU ISLAMABAD
Sr.# Description Nos. Measurement Quantity Unit Remarks
L W H
A Gi Doorframes
Emergency Exit Shoes Store 1.00 ( 17.50)
Emergency Exit Staff Entrance ( 1.00) ( 15.50)

Total of Gi Door Frames ( 33.00) Rft

B Gi Door Frames Fixing


1 Ms stairs To G.f Stairs Doorframe 1.00 ( 1)
2 Lift Room Door frame ( 1.00) ( 1)
3 Emergency Exit Shoes Store 1.00 ( 1)
4 Emergency Exit Staff Entrance ( 1.00) ( 1)
5

Total of Gi Door Frames Fixing ( 4.00) No's


MEASUREMENT SHEETS Dismentling
ISM-BARAKAHU ISLAMABAD
Sr.# Description Nos. Measurement Quantity Unit Remarks
L W H
PCC Dismantling

1 Temporary Toilets Floor ( 1.00) ( 9.00) ( 5.50) ( 1.16) ( 57.42)


3 Front Ramp For Diesel Pipe ( 1.00) ( 8.00) ( 0.66) ( 0.66) ( 3.48)
2 Front Ramp For Diesel Pipe ( 1.00) ( 23.00) ( 1.00) ( 1.16) ( 26.68)

Total ( 87.58) CFT


Block Dismentling
1 Temporary Toilets Walls ( 1.00) ( 22.00) ( 8.00) ( 176.00)
2 Cake Prepration Side Wall ( 1.00) ( 6.50) ( 11.50) ( 74.75)
Total ( 250.75) Sft
MEASUREMENT SHEETS R.C.C
ISM-BARAKAHU ISLAMABAD
Sr.# Description Nos. Measurement Quantity Unit Remarks
L W H
R.C.C Work

1 Passanger Lift Colums ( 4.00) ( 1.33) ( 1.33) ( 3.00) ( 21.23)

Total ( 21.23) CFT


MEASUREMENT SHEETS Block & Plaster Work
ISM-BARAKAHU ISLAMABAD
Sr.# Description Nos. Measurement Quantity Unit Remarks
L W H
A Block Masonary
Temporary Toilets Inside Opening 1.00 6.00 6.00 ( 36.00)
Cake Prepration Ouside Wall ( 1.00) ( 7.00) ( 6.00) ( 42.00)
Risers Near Temporary Toilets 2.00 5.5 1.33 ( 14.63)
Risers Near Temporary Toilets Wall 2 2.00 2.50 1.33 ( 6.65)
Front Pump Room Wall 1.00 4.00 1.16 ( 4.64)

Total of Block Masonary ( 103.92) Sft

B PLaster Work
1 Temporary Toilets Inside Opening 2.00 6.00 6.00 ( 72.00)
2 Cake Prepration Ouside Wall ( 2.00) ( 7.00) ( 11.50) ( 161.00)
3 Risers Near Temporary Toilets 4.00 5.5 1.33 ( 29.26)
4 Risers Near Temporary Toilets Wall 2 4.00 2.50 1.33 ( 13.30)
5 Front Pump Room Wall 1.00 4.00 1.16 ( 4.64)

Total Plaster work at Basement Floor ( 280.20) Sft


MEASUREMENT SHEETS P.C.C
ISM-BARAKAHU ISLAMABAD
PCC Work No's L W Quantity Unit Remarks
Unit Pad Near Temporay Toilets ( 2.00) ( 8.00) ( 5.50) ( 88.00)
Pad 2 ( 2.00) ( 8.00) ( 5.50) ( 88.00)
passanger Lift Pit pad ( 4.00) ( 1.00) 1.00 ( 4.00)
1st Floor Pad For OutDoor Units ( 1.00) ( 25.00) 8.00 ( 200.00)
Ms Stairs Door Sill ( 1.00) ( 3.00) 0.50 ( 1.50)
Front Ramp Pipe ( 1.00) ( 23.00) 1.00 ( 23.00)
Front Ramp Pipe ( 1.00) ( 8.00) 0.66 ( 5.28)

Total PCC Pad ( 409.78) Sft


MEASUREMENT SHEETS Paint
ISM-BARAKAHU ISLAMABAD
Sr.# Description Nos. Measurement Quantity Unit Remarks
L W H
Paint Work Ceiling

G.F New Bulding Redo Paint 1.00 8927.00

A Total Ceiling Paint ( 8,927.00) SFT

Wall Paint

L.G Passanger Lift Front Wall ( 1.00) ( 21.00) ( 9.00) ( 189.00)


G.F Passanger Lift Front Wall ( 1.00) ( 21.00) ( 11.50) ( 241.50)

Front Entrance Stairs side Wall ( 1.00) ( 10.00) ( 13.00) ( 130.00)


Passanger Lift Inside Black Paint ( 1.00) ( 63.00) ( 38.00) ( 2,394.00)
Passanger Lift Inside Black Paint ( 1.00) ( 23.00) ( 8.50) ( 195.50)
Total Wall Paint 3150.00 Sft
MEASUREMENT SHEETS Back Filling
ISM-BARAKAHU ISLAMABAD
Sr.# Description Nos. Measurement Quantity Unit Remarks
L W H
Back Filling

1 Front Ramp Pipe ( 1.00) ( 23.00) ( 1.00) ( 1.00) ( 23.00)


2 Front Ramp Pipe ( 1.00) ( 8.00) ( 0.66) ( 0.42) ( 2.22)

Total ( 25.22) CFT


MEASUREMENT SHEETS Openings
ISM-BARAKAHU ISLAMABAD

Openings Nos: Quantity Unit Remarks


Front Pump Room (Baber Sb) ( 1.00) ( 1.00)
G.F + L.G Passanger Lift Push(Zeeshan Sb) ( 4.00) ( 4.00)
Live Kitchen (Baber Sb) ( 1.00) ( 1.00)
Shoes Store (Baber Sb) ( 3.00) ( 3.00)
Outside Temporary Toilets (Baber Sb) ( 3.00) ( 3.00)
Top Roof Baber sb ( 1.00) ( 1.00)
Basement (Baber sb) 1 ( 1.00)

Total Openings ( 14.00) No's

Openings Closings Nos: Quantity Unit Remarks


Front Pump Room (Baber Sb) ( 1.00) ( 1.00)
G.F + L.G Passanger Lift Push(Zeeshan Sb) ( 4.00) ( 4.00)
Live Kitchen (Baber Sb) ( 1.00) ( 1.00)
Shoes Store (Baber Sb) ( 3.00) ( 3.00)
Outside Temporary Toilets (Baber Sb) ( 3.00) ( 3.00)
Lanlord Seacurity Room Upvc Pipes (Baber Sb) ( 5.00) ( 5.00)
Top Roof Electrical Openings Close ( 6.00) ( 6.00)
UGWT openings ( 3.00) ( 3.00)
Top Roof ( Baber sb) 1 ( 1.00)
Basement (Baber sb) ( 1.00) ( 1.00)
Total Openings ( 27.00) No's
MEASUREMENT SHEETS Tuff Tile
ISM-BARAKAHU ISLAMABAD
Sr.# Description Nos. Measurement Quantity Unit Remarks
L W H
Tuff tile

1 Front Ramp Pipe ( 1.00) ( 23.00) ( 3.50) ( 80.50)

Total ( 80.50) SFT