O & MBUILDING Date:- APRIL-07-2024

REBAR DETAIL

NUMBER OF DIMENSION (MM) TOTAL N. OF


Sr.# Material Description DIA BAR SHAPE
FOOTING
Remarks
A B C

1 Footing F1, Bott & Top 12 100 2950 300 300 1

2 Footing F2, Bott & Top 12 184 2750 300 300 2

3 Footing F3, Bott & Top 12 504 2550 300 300 6

4 Footing CF1 L1 Bott 16 160 2300 300 300 4 _

5 Footing CF1 B1 Bott 16 72 4850 300 300 4 _

6 Footing CF1 L1 Top 12 160 2300 300 300

7 Footing CF1 B1 Top 12 72 4850 300 300

8 Footing CF2 L1 Bott 16 64 6850 300 300 2

9 Footing CF2 B1 Bott 16 112 3850 300 300

10 Footing CF2 L1 Top 12 64 6850 300 300

11 Footing CF2 B1 Top 12 112 3850 300 300

12 Footing CF3 L1 Bott 16 26 6850 300 300 1

13 Footing CF3 B1 Bott 16 56 3150 300 300

14 Footing CF3 L1 Top 12 26 6850 300 300

15 Footing CF3 B1 Top 12 56 3150 300 300

16 Footing CF4 L1& B1 Bott 16 120 5850 300 300 1

17 Footing CF4 L1& B1 Top 12 120 5850 300 300

18 Footing CF5 L1 Bott 16 44 6850 300 300 1 _

19 Footing CF5 B1 Bott 16 56 5350 300 300 _

20 Footing CF5 L1 Top 12 44 6850 300 300 _

21 Footing CF5 B1 Top 12 56 5350 300 300

0 18

Prepared By Approved By
O & MBUILDING Date:- APRIL-07-2024
REBAR DETAIL
Sr.# Material Description DIA NUMBER OF DIMENSION (MM) TOTAL N. OF
Remarks
SHAPE
BAR A B C Column

45 Column C1 & C2 ,V-Bar 25 216 2340 1700 950 27

2 Column C1 & C2 ,V-Bar 25 216 2340 1400 950

2 Column C3 ,V-Bar 20 2 2340 1700 455 1

3 Column C3 ,V-Bar 20 2 2340 1400 455 _

4 Column C3 ,V-Bar 16 6 2340 1700 300 SHAPE _

Column C3 ,V-Bar 16 6 2340 1400 300

Column C4 ,V-Bar 16 8 2340 1700 300 2

Column C4 ,V-Bar 16 8 2340 1400 300

Column C5 ,V-Bar 20 12 2340 2050 455 1

Stirrups C1,C2& C3 16 900 550 350 96

Stirrups C1,C2& C3 16 900 550 155 96

Stirrups C1,C2& C3 16 1800 350 162 96

Stirrups C4 10 60 250 250 75

Stirrups C4 10 120 250 75 75 co

Stirrups C5 16 30 350 350 96

Stirrups C6 16 60 350 150 96

5 _

6 _

7 _

Prepared By Approved By
DAILY LIFE BUILDING REBAR DETAIL Date March-30-2024

Sr.# Material Description UOM W/Mtr Qty KG Remarks

1 REBAR 25mm Mtr 3.854 540 2081.16 FOOTING TO TOP BUILDING

2 REBAR 20mm Mtr 2.467 10344 25518.65 _

3 REBAR 16mm Mtr 1.579 10512 16598.45 _

4 REBAR 12mm Mtr 0.888 17136 15216.77 _

5 REBAR 10mm Mtr 0.617 71160 43905.72 _

6 10MM MESH 150*150MM SQ.Mtr 7.674 2031.8 15592.03 REQ-FOR GROUND FLOOR

7 REBAR 08mm Mtr 0.395 7602 3002.79 REQ-FOR FORMWORK

.
Prepared By Approved By
O&M BUILDING REBAR DETAIL Date March-30-2024

Sr.# Material Description UOM W/Mtr Qty KG Remarks

1 REBAR 25mm Mtr 3.854 5184 19979.136 FOOTING TO TOP BUILDING

2 REBAR 20mm Mtr 2.467 4260 10509.42 _

3 REBAR 16mm Mtr 1.579 15204 24007.116 _

4 REBAR 12mm Mtr 0.888 22524 20001.312 _

5 REBAR 10mm Mtr 0.617 26160 16140.72 _

6 10MM MESH 150*150MM SQ.Mtr 7.674 1235 9477.39 REQ-FOR GROUND FLOOR

7 REBAR 08mm Mtr 0.395 3798 1500.21 REQ-FOR FORMWORK

Prepared By Approved By
RECREATION BUILDING REBAR DETAIL Date March-30-2024

Sr.# Material Description UOM W/Mtr QTY TOTAL Remarks

1 REBAR 25mm Mtr 3.854 96 369.984 FOOTING TO TOP BUILDING

2 REBAR 20mm Mtr 2.467 612 1509.804 _

3 REBAR 16mm Mtr 1.579 1188 1875.852 _

4 REBAR 12mm Mtr 0.888 6048 5370.624 _

5 REBAR 10mm Mtr 0.617 12168 7507.656 _

6 10MM MESH 150*150MM SQ.Mtr 7.674 519.8 3988.9452 REQ-FOR GROUND FLOOR

7 REBAR 8MM Mtr 0.395 2532 1000.14 REQ-FOR FORMWORK

Prepared By Approved By