INDIAN AUDIT AND ACCOUNTS DEPARTMENT

OFFICE OF THE DIRECTOR GENERAL OF AUDIT


NORTHERN RAILWAY, MORADABAD

No.MB/19-1/Misc/2024 Dt 22/04/2024

Sr.DFM
Sr.DEN/C
Northern Railway
Moradabad

Sub :
Ref : This office letter of even no dt 15/03/2024 followed by reminder dt 19/03/2023,
Audit memo dt 22/03/2024 and Rough Audit Note No 2-1/RAN/01/2024-25
dt 02/04/2024

In reference to above, it is mentioned herein that, the desired information pertaining to the
Maintenance of Database of Contracts on the basis of applicability of PVC (and without
PVC), as per instructions of Railway Board contained in its letter no 2019-BC-PP 42/2018-19 dt
15/10/2020 reiterated vide Dy.CE/Generals letter no .08-W/977/W-Policy dt 26/10/2020, is yet to
be made available to Audit.
In view of this, the matter may be looked into and arrange to provide the desired details
by 25/04/2024, failing which it will be construed that at Divisional level no such database of
contracts (on the basis of applicability of PVC and without PVC) is being maintained in
contravention to the Railway Boards instruction.

Sr.Div Audit Officer


NR.MB