What are the methods of concrete testing?
The concrete is tested for quality in the fresh state as well as the hardened state. The tests
conducted on fresh concrete are as follows-
Workability Test
Temperature Test
Setting Test
Air Content
Unit Weight
Heat Generation
Bleeding
Segregation Resistance etc.
Compressive Strength
Modulus of Elasticity
Tensile Strength
Permeability
Absorption
Density
Shrinkage
Bond
Abrasion etc.
2/9
The quality control of concrete strictly requires tests for workability, temperature,
compressive strength etc. The necessity and frequency of other tests are determined by
the Engineer-in-charge or the organisational QA program.
The tests on fresh concrete are done at the point of production and point of placing
concrete. The fresh concrete samples are taken for testing and the results are immediately
published to evaluate the concrete quality against the standards.
The tests on hardened concrete are done after the concrete achieve sufficient strength.
These tests are generally carried out in the laboratory.
This article covers three fresh concrete tests and two hardened concrete tests that are
must-know for all Civil Engineers.
Before moving ahead, the sampling of concrete for all the tests shall be done following IS
1199.
Slump Test
Compaction Factor Test
Flow Test
Vee Bee Time Test
Kelly Ball Test
In this article, I shall briefly explain only the first three methods and save the minute
details and the other two methods for a dedicated article on the workability of concrete.
3/9
The method of performing the slump test as per IS code is mentioned below-
The cone is cleaned and placed on a levelled surface generally over a metal plate.
The concrete is filled into the slump cone into three layers. Each layer is uniformly
compacted 25 times by a 16mm diameter steel rod. After filling concrete till the top
of the cone, the top surface of concrete is levelled with a trowel.
Remove the mould vertically without disturbing the concrete.
After the concrete settles down, measure the settlement of concrete. This
measurement is reported in millimeters and called ‘slump’.
Suitability of Slump Test- The slump test is suitable for medium workability of
concrete i.e., the slump of 20-150 mm.
Result Interpretation- The ideal slump value should be as low as possible. This
represents the lower water-cement ratio hence better strength gain and lower shrinkage.
However, due to placing and compaction limitations at the site, the slump value is
increased to increase the workability.
The method of performing the compaction factor test by IS code is mentioned below-
Fill the first hopper completely with concrete and level the top with a trowel.
Open the first hopper trap door to allow concrete to fall into the second hopper.
Now open the trap door of second hopper and let the concrete fall into the cylinder.
Weigh the concrete in the cylinder. Record it as W1.
Now, again fill the concrete directly into the cylinder in three layers with uniform
compaction of each layer by 16 mm diameter rod.
Record the weight of the compacted concrete as W2.
4/9
Calculate the compaction factor by dividing W1 by W2.
Suitability of Compaction Factor Test- The compaction factor test is suitable for
concrete having very little workability. The concrete that is to be vibrated is tested by this
method.
Result Interpretation- The value of the compaction factor for normal workable
concrete lies between 0.80 – 0.92. The higher the compaction factor, the higher is the
workability.
The method of performing the flow table test by IS code is mentioned below-
The cone is placed over the wet table and filled with concrete into two layers. Each
layer is tamped 25 times by a standard tamping rod.
The cone is lifted and the concrete is allowed to flow.
The table is lifted for some height and dropped to further allow the flow of concrete.
The flow diameter of concrete is measured in six directions and their average is
recorded as ‘D’.
The flow % is calculated as {(D-25)/25} x 100.
Suitability of Flow Table Test- The test is unsuitable for the low slump concrete.
5/9
Concrete Flow Table Test Apparatus. Pic
Credit- concrete.org.uk
Importance of Concrete Setting Tests- The concrete setting times are useful in
determining the maximum allowed transportation time, placing time and finishing time
etc. For different conditions, the concrete can be suitably mixed with additives that alter
its’ setting time.
Relevant Codes: IS 8142, ASTM C191, ASTM C403, ASTM C266, ASTM C953
6/9
The initial setting time of concrete is the time after which the concrete starts losing its’
plasticity. The final setting time of concrete is the time by which the concrete loses all of
its’ plasticity. The Penetration Resistance Apparatus is used to determine the setting time
of concrete.
The step-by-step procedure to conduct the initial setting time test by IS code is as follows-
Relevant Codes: IS 516 for the testing procedure and IS 456 for sampling frequency.
ACI-318.
The general steps for testing the compressive strength of concrete as per IS code is as
follows-
The oiled moulds are filled with concrete and well compacted.
The top surface of concrete is levelled with the mould and excess concrete is strike-
off by a trowel.
7/9
After 24 hours, the cube/cylinder is carefully removed from the mould and put
underwater for curing. The samples are marked with the grade of concrete and
casting date.
After completing the curing period of 7 days, half of the samples (at least 3) are
placed in compression testing machine one-by-one and the value at which sample
develops crack is noted. The average of samples is recorded as 7-day mean
compressive strength of the sample. Same procedure is repeated for 28-day mean
compressive strength.
Result Interpretation- The concrete is generally tested for 7 days & 28 days
compressive strength. In some cases, it can also be tested for 3 days as well. The 3 days, 7
days and 28 days strength should be equal to or more than the 50%, 66% and 99.99% of
the target mean strength respectively.
The test procedure for testing the permeability of concrete as per IS code is mentioned
below-
8/9
Three number cylindrical samples of 200 mm diameter and 120mm height re
prepared.
After 24 hours, the middle 100 mm diameter is roughened and remaining portion is
sealed with cement paste. The samples are then cured for 28 days.
After completing the curing period, the roughened portion is applied with water
pressure of 1 bar for 48 hours, 3 bars for next 24 hours and 7 bars for another 24
hours.
The samples are then split by compression machine to study the water penetration
depth and recorded for each sample.
The average of water penetration depth is recorded.
Result Interpretation- The depth of water penetration should not exceed 25 mm else;
the sample is considered to fail.
Conclusion
The five tests mentioned in the article are non-exhaustive. As already mentioned above,
these tests are essential and conducted to ascertain the quality of concrete. However,
quality assurance and control should start from purchasing material to curing and
maintaining the concrete. For complete concrete quality control, follow these five steps
that will enable you to meet the concrete quality standards.
The correction methods for the shortcomings in concrete shall be well discussed with the
Engineer- In-Charge and laid down in QAP. The standardisation of correction methods
shall ensure the overall quality control and prevent wastage of material.
The list of IS codes for all the tests can be read here.