3.1- Reservoir Dynamic Modeling(1.5 month, 2018.05.01-2018.06.15): 3.2- Final presentation and report(0.5 month, 2018.06.15-2018.06.30):
Cost of the contract:
Task Cost No Item QTY Unit Payment Time Point Duration (USD) 3 month After the Checkpoint 1 Geophysical study 1 set 120,000 (optional) meeting #1 4.5 month After the Checkpoint 2 Geological study 1 set 150,000 meeting #2 Reservoir Dynamic 2 month, After the Checkpoint 3 1 set 60,000 Modeling meeting #3 Total Price = Sum of Items is