GROUND FLOOR

Sl. No. DISCRIPTION UNIT COEF Nos. L B D Qty

Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works
other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and
technical Specifications, including setting out, shoring, strutting, barricading, caution lights, removal of
stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling
1 the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto
1.5 m including cost of labour, tools, usage of machinery & other ppurtenances required to complete the
work.

PWD CM SR 2023-2024, VOL -1, ITEM NO 1.12, PAGE NO 8


SURFACE EXCACATION CUM 1 0.300 0.00
0.00
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key
trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing
and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal
of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing
2 off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto
1.5 m including cost of labour, tools & other appurtenaces required to complete the work. Depth
exceeding 1.5m, but not exceeding 3 m

PWD SR.2023-24 . VOL-1 SI. NO.1.4.2 PAGE NO. 5


F1 Cum 1 51 2.00 2.00 2.100 428.40
F2 1 23 2.00 2.00 2.100 193.20
F3 1 20 1.80 1.80 2.100 136.08
foundation
front 1 2 33.90 0.75 0.750 38.14
1 1 8.90 0.75 0.750 5.01
side 1 1 97.60 0.75 0.750 54.90
1 1 79.63 0.75 0.750 44.79
1 2 8.00 0.75 0.750 9.00
back 1 2 23.54 0.75 0.750 26.48
1 2 6.55 0.75 0.750 7.37
1 1 2.10 0.75 0.750 1.18
portico 1 1 127.43 0.75 0.750 71.68
1016.23
DEDUCTION OF FOOTINGS
F1 Cum 1 55 2.00 0.75 0.750 61.88
F2 1 23 2.00 0.75 0.750 25.88
F3 1 20 1.80 0.75 0.750 20.25
108.00
Net qty 1016.23 - 108.000 908.23
Providing and Filling in foundation with granite / trap broken metal 100mm. and down size & with
approved sand including hand packing, ramming, watering, including cost of all materials and labour
3
with all lead and lift complete as per specifications

PWD SR.2023-24 . VOL-1 SI. NO.1.23 PAGE NO. 54


F1 Cum 1 55 2.00 2.00 0.300 66.00
F2 1 23 2.00 2.00 0.300 27.60
F3 1 20 1.80 1.80 0.300 19.44
113.04
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The
granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes
machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,
4 including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and
all the other appurtenances required to complete the work as per technical specifications.)

Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates
PWD SR2023-24,VOL-1 I.NO-2.1.3 Pg no-15
F1 Cum 1 55 2.00 2.00 0.125 27.50
F2 1 23 2.00 2.00 0.125 11.50
F3 1 20 1.80 1.80 0.125 8.10
foundation
front 1 2 33.90 0.75 0.125 6.36
1 1 8.90 0.75 0.125 0.83
side 1 1 97.60 0.75 0.125 9.15
1 1 79.63 0.75 0.125 7.47
1 2 8.00 0.75 0.125 1.50
back 1 2 23.54 0.75 0.125 4.41
1 2 6.55 0.75 0.125 1.23
1 1 2.10 0.75 0.125 0.20
portico 1 1 127.43 0.75 0.125 11.95
PLINTH BOTTOM
front 1 1 8.90 0.45 0.125 0.50
1 3 7.62 0.45 0.125 1.29
side 1 12 7.62 0.45 0.125 5.14
back 1 2 6.00 0.45 0.125 0.68
FLOOR
correspondent 1 1 6.00 4.57 0.125 3.43
conference 1 1 6.00 5.18 0.125 3.89
admin 1 1 7.62 7.62 0.125 7.26
reception 1 1 11.43 7.62 0.125 10.89
boys toilet 1 1 7.62 7.62 0.125 7.26
portico 1 1 27.20 2.10 0.125 7.14
1 1 79.63 2.10 0.125 20.90
1 1 7.46 2.10 0.125 1.96
1 1 23.54 2.10 0.125 6.18
Eb room 1 1 3.42 2.40 0.125 1.03
stairs 1 1 6.32 4.64 0.125 3.67
1 1 7.84 4.64 0.125 4.55
class room 1 9 7.62 6.00 0.125 51.44
staff room 1 1 7.62 4.57 0.125 4.35
1 1 6.00 4.57 0.125 3.43
healthcare 1 1 4.50 4.50 0.125 2.53
girls rest room 1 1 7.62 7.62 0.125 7.26
activity 1 1 10.66 6.00 0.125 8.00
252.93
DEDUCTION OF FOOTINGS
F1 Cum 1 55 2.00 0.75 0.125 10.31
F2 1 23 2.00 0.75 0.125 4.31
F3 1 20 1.80 0.75 0.125 3.38
18.00
Net qty 252.93 - 18.000 234.93
Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1
5 cement : 6 coarse sand)
PWD SR.2023-24 VOL-2 ,SI. NO.5.4 PAGE NO. 9
1st course Cum
foundation
front 1 2 33.90 0.60 0.600 24.41
1 1 8.90 0.60 0.600 3.20
side 1 1 97.60 0.60 0.600 35.14
1 1 79.63 0.60 0.600 28.67
1 2 8.00 0.60 0.600 5.76
back 1 2 23.54 0.60 0.600 16.95
1 2 6.55 0.60 0.600 4.72
1 1 2.10 0.60 0.600 0.76
portico 1 1 127.43 0.60 0.600 45.87
165.47
DEDUCTION
C1 Cum 1 55 0.23 0.60 0.600 4.55
C2 1 23 0.23 0.45 0.600 1.43
C3 1 20 0.30 0.30 0.600 1.08
7.06
Net qty 165.47 - 7.062 158.41
2ND COURSE Cum
front 1 2 33.90 0.60 0.600 24.41
1 1 8.90 0.60 0.600 3.20
side 1 1 97.60 0.60 0.600 35.14
1 1 79.63 0.60 0.600 28.67
1 2 8.00 0.60 0.600 5.76
back 1 2 23.54 0.60 0.600 16.95
1 2 6.55 0.60 0.600 4.72
1 1 2.10 0.60 0.600 0.76
portico 1 1 127.43 0.60 0.600 45.87
165.47
DEDUCTION
C1 Cum 1 55 0.23 0.60 0.450 3.42
C2 1 23 0.23 0.45 0.450 1.07
C3 1 20 0.30 0.30 0.450 0.81
5.30
Net qty 165.47 - 5.297 160.17
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub
structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The
granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes
machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing
8 weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to
the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other
appurtenances required to complete the work as per technical specifications.

M35 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
PWD MYS SR2023-24,VOL -1 SL .NO2.4.6 Pg no-16
F1 Cum 1 55 2.00 2.00 0.600 132.00
F2 1 23 2.00 2.00 0.600 55.20
F3 1 20 1.80 1.80 0.600 38.88
226.08
BASIC RATE 6336.00
ADD CENTERING CHARGES 8% 506.88
TOTAL AMOUNT 6842.88
Plinth beam
front 1 2 33.90 0.23 0.600 9.36
1 1 8.90 0.23 0.600 1.23
side 1 1 97.60 0.23 0.600 13.47
1 1 79.63 0.23 0.600 10.99
1 2 8.00 0.23 0.600 2.21
back 1 2 23.54 0.23 0.600 6.50
1 2 6.55 0.23 0.600 1.81
1 1 2.10 0.23 0.600 0.29
portico 1 1 127.43 0.23 0.600 17.59
front 1 1 8.90 0.23 0.600 1.23
1 3 7.62 0.23 0.600 3.15
side 1 12 7.62 0.23 0.600 12.62
back 1 2 6.00 0.23 0.600 1.66
82.09
BASIC RATE 6336.00
ADD CENTERING CHARGES 50% 3168.00
TOTAL AMOUNT 9504.00
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other
similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by
9 ramming and watering, lead up to 50 m and lift upto 1.5 m.

PWD SR2023-24,I.NO 1.9 vol-1 pg no 7 DEDUCT


Excatiom qty-(PCC+Footing+SSM) Cum 908.23 634.662 273.57
273.57
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a
place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,
10 grading to required slope and compacting to meet the requirement complete as per specifications,
including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete
the work

PWD SR2023-24,I.NO 1.8 vol-1 pg no 7


Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials,
machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with
11 binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and
technical specification.

PWD SR.2023-24 . Vol -1 SL.NO .2.11A PAGE NO. 18


Tonne KG/CUM
Footing 1 1 1 226.08 80.000 18,086.40
PLINTH BEAM 1 1 82.09 110.000 9,029.67
27116.071
27.116
Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating
continuous chemical barrier under and around the column pits, walls, trenches, basement excavation,
top surface of the plinth filling, junction of wall and floor, along the external perimeter of building,
expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of
pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of
12 chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete
as per specifications.

PWD SR.2023-24 . VOL-2 SI. NO. 4.1 PAGE NO. 5


BUILDING AREA SQM 1 1 97.60 10.44 1018.94
1 1 23.54 10.44 245.76
1 1 23.54 8.90 209.51
1474.21
Providing and laying in position Reinforced cement concrete for all Super structures of building , Road
works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The
granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes
machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost
includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes ,
13 labour, Usage charges of machinery, curing and all other appurtenances required to complete the work
as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid
separately)

COMMON SR PWD VOL-1, ITEM NO 2.5.2, PAGE NO 17


M35 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
COLUMN concrete CUM CEILING H=3.3 FROM FLOOR
C1 Cum 1 55 0.23 0.60 4.445 33.74
C2 1 23 0.23 0.45 4.445 10.58
C3 1 20 0.30 0.30 4.445 8.00
52.32
BASIC RATE 6843.00
ADD CENTERING Charges 70% 4790.10
TOTAL AMOUNT 11633.10
BEAM CONCRETE

front 1 3 33.90 0.23 0.450 10.53


1 1 8.90 0.23 0.450 0.92
side 1 1 97.60 0.23 0.450 10.10
1 1 79.63 0.23 0.450 8.24
1 1 89.30 0.23 0.450 9.24
1 2 8.00 0.23 0.450 1.66
back 1 2 23.54 0.23 0.450 4.87
1 2 6.55 0.23 0.450 1.36
1 1 2.10 0.23 0.450 0.22
portico 1 1 127.43 0.23 0.450 13.19
front 1 1 8.90 0.23 0.450 0.92
1 3 7.62 0.23 0.450 2.37
side 1 12 7.62 0.23 0.450 9.46
back 1 2 6.00 0.23 0.450 1.24
74.32
BASIC RATE 6843.00
ADD CENTERING Charges 60% 4105.80
TOTAL AMOUNT 10948.80
LINTEL CONCRETE
FRONT 2 14.40 0.23 0.150 0.99
2 8.90 0.23 0.150 0.61
1 8.00 0.23 0.150 0.28
1 9.75 0.23 0.150 0.34
1 22.86 0.23 0.150 0.79
SIDE 1 91.05 0.23 0.150 3.14
1 70.31 0.23 0.150 2.43
14 6.00 0.23 0.150 2.90
1 2.10 0.23 0.150 0.07
BACK 2 23.54 0.23 0.150 1.62
4 6.00 0.23 0.150 0.83
14.00
BASIC RATE 6843.00
ADD CENTERING Charges 60% 4105.80
TOTAL AMOUNT 10948.80
CILL CONCRETE
FRONT 2 14.40 0.23 0.075 0.50
2 8.90 0.23 0.075 0.31
1 8.00 0.23 0.075 0.14
1 9.75 0.23 0.075 0.17
1 22.86 0.23 0.075 0.39
SIDE 1 91.05 0.23 0.075 1.57
1 70.31 0.23 0.075 1.21
14 6.00 0.23 0.075 1.45
1 2.10 0.23 0.075 0.04
BACK 2 23.54 0.23 0.075 0.81
4 6.00 0.23 0.075 0.41
DEDUCTION
D1 -29 1.06 0.23 0.075 -0.53
D2 -2 1.06 0.23 0.075 -0.04
OP 1 -2 1.20 0.23 0.075 -0.04
OP2 -1 0.90 0.23 0.075 -0.02
6.38
CHAJJA CONCRETE
W1 37 2.10 0.45 0.100 3.50
W 2 2.70 0.45 0.100 0.24
W3 1 1.50 0.45 0.100 0.07
V2 1 4.00 0.45 0.100 0.18
3.99
BASIC RATE 6843.00
ADD CENTERING Charges 45% 3079.35
TOTAL AMOUNT 9922.35
SLAB CONCRETE
SLAB 1 97.60 10.44 0.150 152.84
1 23.54 10.44 0.150 36.86
1 23.54 8.90 0.150 31.43
221.13
BASIC RATE 6843.00
ADD CENTERING Charges 50% 3421.50
TOTAL AMOUNT 10264.50
STAIR 2 3.00 2.10 0.130 1.64
LANDING 2 2.10 4.64 0.130 2.53
2ND FLIGHT 1 3.30 2.10 0.125 0.87
21*0.5 2.10 0.30 0.150 0.99
6.03
BASIC RATE 6843.00
ADD CENTERING Charges 45% 3079.35
TOTAL AMOUNT 9922.35
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials,
machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with
14 binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical
specification

VOL-1 ITEM NO 2.11 (A) PAGE NO 18


COLUMN KG 52.32 0.025 1.31 7850.000 10267.77
BEAM KG 74.32 0.022 1.63 7850.000 12834.57
SLAB KG 221.13 0.010 2.21 7850.000 17358.79
LINTHEL KG 14.00 0.012 0.17 7850.000 1318.65
CHAJJA KG 3.99 0.012 0.05 7850.000 375.58
STAIR KG 6.03 0.015 0.09 7850.000 710.03
42865.39
TONNE 42.865

Providing Brick work with common burnt clay Non Modular bricks of
class designation 3.5 in foundation and plinth in Cement mortar 1:4 (1
cement : 4 coarse sand) including cost of all materials, labour, scaffolding
15 and usage charges of machinery & other incidental charges complete as
per the direction of engineer incharge of work.

VOL -2, ITEM NO 6.1, PAGE NO 13


WALL HEIGHT=3.3-0.45-0.15-0.075
FRONT CUM
FRONT 2 14.40 0.23 2.325 15.40
2 8.90 0.23 2.325 9.52
1 8.00 0.23 2.325 4.28
1 9.75 0.23 2.325 5.21
1 22.86 0.23 2.325 12.22
SIDE 1 91.05 0.23 2.325 48.69
1 70.31 0.23 2.325 37.60
14 6.00 0.23 2.325 44.92
1 2.10 0.23 2.325 1.12
BACK 2 23.54 0.23 2.325 25.18
4 6.00 0.23 2.325 12.83
CORRIDOR WALL 1 115.89 0.23 1.200 31.99

DEDUCTION
W1 -53 1.80 0.23 1.200 -26.33
W -2 2.40 0.23 1.200 -1.34
W3 -1 1.20 0.23 1.200 -0.33
V2 -1 3.60 0.23 0.600 -0.50
D1 -29 1.06 0.23 2.100 -14.85
D2 -2 1.06 0.23 2.100 -1.02
OPENING -2 1.20 0.23 2.100 -1.16
-1 0.90 0.23 2.100 -0.43
203.00
Providing 12 mm cement plaster with cement mortar 1:4 (1 cement:4 fine sand) to brick masonry including
rounding off corners wherever required smooth rendering, providing and removing scaffolding, including
16 cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.

VOL -2, ITEM NO 8.1.1 , PAGE NO 41


correspondent SQM 1 1 6.00 4.57 27.42
conference 1 1 6.00 5.18 31.08
admin 1 1 7.62 7.62 58.06
reception 1 1 11.43 7.62 87.10
boys toilet 1 1 7.62 7.62 58.06
portico 1 1 27.20 2.10 57.12
1 1 79.63 2.10 167.22
1 1 7.46 2.10 15.67
1 1 23.54 2.10 49.43
Eb room 1 1 3.42 2.40 8.21
stairs 1 1 6.32 4.64 29.32
1 1 7.84 4.64 36.38
class room 1 9 7.62 6.00 411.48
staff room 1 1 7.62 4.57 34.82
1 1 6.00 4.57 27.42
healthcare 1 1 4.50 4.50 20.25
girls rest room 1 1 7.62 7.62 58.06
activity 1 1 10.66 6.00 63.96
1241.08
Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonry including
rounding off corners wherever required smooth rendering, providing and removing scaffolding, including
17 cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.

VOL -2, ITEM NO 8.3.1, PAGE NO 41


correspondent SQM 1 1 21.14 3.300 69.76
conference 1 1 22.36 3.300 73.79
admin 1 1 30.48 3.300 100.58
reception 1 1 19.05 3.300 62.87
boys toilet 1 1 30.48 3.300 100.58
portico 1 1 31.40 3.300 103.62
1 1 81.73 3.300 269.71
1 1 7.46 3.300 24.62
1 1 23.54 3.300 77.68
Eb room 1 1 11.46 3.300 37.82
stairs 1 1 17.28 3.300 57.02
1 1 20.32 3.300 67.06
class room 1 9 27.24 3.300 809.03
staff room 1 1 24.38 3.300 80.45
1 1 16.57 3.300 54.68
healthcare 1 1 18.00 3.300 59.40
girls rest room 1 1 30.48 3.300 100.58
activity 1 1 33.32 3.300 109.96
DEDUCTION
W1 0.50 -53 1.80 1.200 -57.24
W 0.50 -2 2.40 1.200 -2.88
W3 0.50 -1 1.20 1.200 -0.72
V2 0.50 -1 3.60 0.600 -1.08
D1 0.50 -29 1.06 2.100 -32.28
D2 0.50 -2 1.06 2.100 -2.23
OPENING 0.50 -2 1.20 2.100 -2.52
0.50 -1 0.90 2.100 -0.95
2159.33
Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonry including
rounding off corners wherever required smooth rendering, providing and removing scaffolding, including
18 cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.

VOL -2, ITEM NO 8.3.1, PAGE NO 41


OUTSIDE SQM
FRONT 1 42.80 4.500 192.60
1 37.40 3.300 123.42
SIDE 1 112.84 4.500 507.78
1 77.08 3.300 254.36
BACK 1 23.54 4.500 105.93
1 23.54 3.300 77.68
1 6.00 4.500 27.00
1 6.00 3.300 19.80
CORRIDOR WALL 1 109.89 3.680 404.40
COLUMN 20 1.20 3.300 79.20
CHAJJA W1 37 2.10 1.300 101.01
W 2 2.70 1.300 7.02
W3 1 1.50 1.300 1.95
V2 1 4.00 1.300 5.20
1907.35
Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption
less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm
thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including
19 grouting the joints with white cement and matching pigments etc., complete

VOL -2, ITEM NO 9.12.2, PAGE NO 60


Size of Tile 600x600 m

correspondent SQM 1 1 6.00 4.57 27.42


conference 1 1 6.00 5.18 31.08
admin 1 1 7.62 7.62 58.06
front room 1 1 3.00 3.65 10.95
Eb room 1 1 3.42 2.40 8.21
class room 1 9 7.62 6.00 411.48
staff room 1 1 7.62 4.57 34.82
1 1 6.00 4.57 27.42
healthcare 1 1 4.50 4.50 20.25
activity 1 1 10.66 6.00 63.96
SKIRTING 1.00 1 424.63 0.10 42.46
736.12
Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as
curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone
slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with
cement slurry and pointing with white cement slurry admixed with pigment of matching shade including
20 rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge.**
Polished Granite stone slab Black, Cat Eye, River Pink or equivalent.

, VOL -2, ITEM NO 9.24, PAGE NO 63


reception SQM 1 1 11.43 3.73 42.63
1 1 8.23 3.89 32.01
portico 1 1 27.20 2.10 57.12
1 1 79.63 2.10 167.22
1 1 7.46 2.10 15.67
1 1 23.54 2.10 49.43
stairs 1 1 6.32 4.64 29.32
1 1 7.84 4.64 36.38
skirting 1 1 166.91 0.10 16.69
446.48
Providing and laying flooring and steps fine machine polished granite stone slabs 20 mm thick on cement
mortar bed 1:6, 20 mm thick, and joints fin ished with cement mortar 1:3 over existing cement concrete
21 bed , including cost of materials, mortar, labour, curing complete as per specifications.

, VOL -2, ITEM NO 9.30, PAGE NO 64


THREAD SQM 22 2.10 0.30 13.86
RISE 22 2.10 0.15 6.93
LANDING 1 4.64 2.10 9.74
FRONT ENTRANCE 1 9.60 1.80 17.28
1 4.57 1.50 6.86
30.53
Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the
manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory,
Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with
22 grey cement slurry @ 3.3 kg/m2 including pointingthe joints with white cement and matching pigment etc.,
complete.

VOL -2, ITEM NO 9.9, PAGE NO 60


0.3M*0.3M
TOILET FLOOR SQM 2 7.62 7.62 116.13
116.13
Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement
plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of
23 approved make and size including cost of materials, labour, complete as per specifications.

VOL -2, ITEM NO 9.39, PAGE NO 65


TOILET SQM 2 30.48 2.100 128.02
128.02
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and
24 manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per
specifications and as per directions of Engineer in charge

, VOL -2, ITEM NO 8.51, PAGE NO 50


QUANTITY SAME AS INSIDE AND CELING PLASTER
WALL PUTTY SQM 3400.40
Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two
coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign
matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as
25 per specifications and as per directions of Engineer-in-charge

, VOL -2, ITEM NO 8.39, PAGE NO 50


QUANTITY SAME AS INSIDE AND CELING PLASTER
INSIDE PAINT SQM 3400.40
Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @
1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of
approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust,
26 mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of
materials, labour complete as per specifications and as per directions of Engineer-in-charge.

, VOL -2, ITEM NO 8.30, PAGE NO 48


QUANTITY SAME AS OUT SIDE PLASTER
OUSIDE PAINT SQM 2159.33
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even
shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand
and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign
matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as
27 per specifications and as per directions of Engineer-in-charge

, VOL -2, ITEM NO 8.41, PAGE NO 48


W1 SQM 53 1.80 1.200 114.48
W 2 2.40 1.200 5.76
w3 13 1.20 1.200 18.72
138.96
Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round
28 bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames
with rawl plugs screws etc.

VOL -2, ITEM NO 11.34B, PAGE NO 86


W1 KG 53 1.80 1.200 114.48
W 2 2.40 1.200 5.76
w3 13 1.20 1.200 18.72
EACH WINDOW WEIGHING 21KG/SQM 138.96
138.96 X CO-EF 21.000 2918.16
Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up
standard tubular sections/ appropriate sections and other sections of approved make conforming to IS: 733
and IS:1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at
junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium
sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including
cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete
as per architectural drawings and the directions of Engineer-in charge. (Glazing, paneling and dash
29 fasteners to be paid for separately) :For Fixed Portion : Anodised aluminium (anodised transparent or dyed
to required shade according to IS: 1868, Minimum anodic coating of grade AC 15) including cost of
materials, labour, usage charges of machinery complete as per specifications

, VOL -2, ITEM NO 11.35.1.1, PAGE NO 87


W1 SQM 53 1.80 1.200 114.48
EACH WINDOW FRAME WEIGHING 9.2KG/SQM

114.48 X CO-EF 9.200 1053.22


W SQM 2 2.40 1.200 5.76
EACH WINDOW FRAME WEIGHING 9.20KG/SQM

5.76 X CO-EF 9.200 52.99


w3 SQM 13 1.20 1.200 18.72
EACH WINDOW FRAME WEIGHING 9.2KG/SQM

18.72 X CO-EF 9.200 172.22


V2 SQM 1 3.65 0.600 2.19
EACH WINDOW FRAME WEIGHING 4.73KG/SQM

2.19 X CO-EF 4.730 10.36


Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM
rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-
charge . (Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 4.0 mm
thickness (weight not less than 10kg/ m²) including cost of materials, labour, usage charges of machinery
30 complete as per specifications and as per directions of the Engineer-in-Charge.

VOL -2, ITEM NO 11.37.1, PAGE NO 89


W1 SQM 53 1.80 1.200 114.48
W 2 2.40 1.200 5.76
w3 13 1.20 1.200 18.72
V2 1 3.65 0.450 1.64
140.60
Providing Honne wood frames of doors, windows, clerestory windows,ventilators and other frames,
wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side
31 clamps),but including cost of materials, labour, usage charges complete as per specifications.

, VOL -2, ITEM NO 12.11, PAGE NO 99


D1 CUM 29 6.60 0.075 0.125 1.79
D2 2 6.60 0.75 0.100 0.99
2.78
Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid
door/window/Clerestory windows & other Frames/Chowkhat comprising of virgin PVC polymer of K value
58-60 (Suspension Grade), calcium carbonate and natural fibres (wood powder/rice husk/wheat husk) and
non toxic additives (maximum toxicity index of 12 for 100 g) fabricated with miter joints after applying PVC
solvent cement and screwed with full body threaded star headed SS screws having minimum frame density
of 850 kg/m3, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive
32 strength of 58 N/mm2 , modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A
category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in
position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of
Engineer-InCharge. (Fixtures shall be paid for separately)

, VOL -2, ITEM NO 12.93.1, PAGE NO 89


Size 62 x 100mm FRAME
D4 M 13 4.90 63.70
63.70
Providing and fixing factory made Green certified, Anti Termite, UV resistant, high water absorbant single
extruded WPC (Wood PolymerComposite) solid plain flush door shutter of required size comprising of
virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood
powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) having
minimum density of 650 kg/m3 and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum
compressive strength of 50 N/mm2 , modulus of elasticity 850 N/mm2 and resistance to spread of flame of
Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and
33 fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter
sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of
Fixtures to be paid separately)

VOL -2, ITEM NO 12.94, PAGE NO 112


SHUTTER 30 mm thickness

TOILET DOOR D4 SQM 13 0.70 2.100 19.11


19.11
Providing and fixing in position fully panelled Honne wood shutters for doors with , stiles and rails of
35mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and
34 panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications.
(excluding cost of fixtures)

VOL -2, ITEM NO 12.17, PAGE NO 100


SHUTTER 30 mm thickness

MAIN DOOR D SQM 31 1.06 2.100 69.01


69.01
Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc.,
including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the
same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories
& stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side
of waist slab with suitable arrangement as per approval of Engineer-in- charge,(for payment purpose only
weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts,
35 fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications
and as per directions of the Engineer-in-Charge.

PWD CM SR 2023-24, VOL -2, ITEM NO 11.28, PAGE NO 85


RAILING KG 1 7.00 1.050 7.35
7.35
7.35 kg/sqm 8.500 62.48
SUB TOTAL:-
RATE AMOUNT (Rs.)
(Rs.)

95.00 -

259.00 235,230.92

CONSIDER THIS FOR LOOSE SOIL


This line item not required
-
5989.00 1,407,001.00

SSM Not Required Below Plinth Beam. Consider 2.5


feet depth SSM for outer line of the building.

6374.00 1,009,694.00

6374.00 1,020,948.00
Consider M35 grade for only column
concrete and all other structural
members will be M25 grade.

6842.88 1,547,039.00

9504.00 780,164.00

266.00 72,769.00
Consider 4 kg/Sft

89457.00 2,425,723.00

118.00 173,957.00

Floor to Floor Height: 3.3 M

11,633.10 608,643.00

Consider Beam Depth of 0.6m


10,948.80 813,684.00

Consider lintel Depth of 0.2m

10,948.80 153,266.00

10,948.80 69,804.00
9,922.35 39,561.00

Consider Slab Thickness of 175 mm

10,264.50 2,269,801.00

Waist Slab Thicknees: 150mm

9,922.35 59,832.00

89,457.00 3,834,609.00

Floor to floor height: 3.3 m and beam


depth 0.6m
Floor to floor height: 3.3 m and beam
depth 0.6m

8220.00 1,668,664.00
Ceiling Plastering 12 mm

255.00 316,475.00
Internal Plastering 15 mm

354.00 764,402.00
External Plastering 20 mm
354.00 675,203.00

1145.00 842,857.00

2852.00 1,273,376.00
5328.00 162,686.00

1076.00 124,955.00

1449.00 185,496.00

100.00 340,041.00

127.00 431,852.00

174.00 375,723.00
167.00 23,207.00

183.00 534,024.00

452.00 476,054.00

452.00 23,953.00

452.00 77,846.00

452.00 4,683.00
988.00 138,916.00
Consider Sal wood for all door
frames

138074.00 384,450.00

702.00 44,717.40
3485.00 66,599.00
Consider Sal wood for all door
frames

7085.00 488,908.00

Railing Qty in SQM or RM

565.00 35,299.00
SUB TOTAL:- 25,982,112.32