project vidyashilp landscape work

Date: 21-03-2024
Start Date End Date
land scape work 16-Mar-24 30-Apr-24
Contractor Mobilization 16-Mar-24 16-Mar-24
Excavation for FFL 17-Mar-24 19-Mar-24
retaing wall phase 01 (20m double wall 6.33m single wall 20-Mar-24 6-Apr-24
PCC for retaing wall 22-Mar-24 22-Mar-24
reinforcement work for footing and wall 23-Mar-24 26-Mar-24
form work for footing 26-Mar-24 27-Mar-24
concrete for footing 27-Mar-24 27-Mar-24
starter for walls 29-Mar-24 29-Mar-24
form work for wall 1 st half 30-Mar-24 1-Apr-24
concrete for wall 1st half 2-Apr-24 2-Apr-24
form work for wall 2nd half 3-Apr-24 5-Apr-24
concrete for wall 2nd half 6-Apr-24 6-Apr-24
retaing wall phse 2 reinorcement 6-Apr-24 9-Apr-24
ugadi leave 10-Apr-24 12-Apr-24
shutternig footing 13-Apr-24 13-Apr-24
footing concrete 14-Apr-24 14-Apr-24
starter marking 15-Apr-24 15-Apr-24
shutterng and concrete 16-Apr-24 23-Apr-24
drainage excavation and SSM excavation 6-Apr-24 6-Apr-24
grading and PCC DRAINAGE 7-Apr-24 7-Apr-24
reinforcement work for drainage 13-Apr-24 14-Apr-24
drainage bed 15-Apr-24 15-Apr-24
drainage side shuttering 16-Apr-24 17-Apr-24
drainage cocncrete 18-Apr-24 18-Apr-24
grading and back filling half portion 15-Apr-24 18-Apr-24
kerb 19-Apr-24 20-Apr-24
sub base prepartion 21-Apr-24 22-Apr-24
paver laying in clearnce area only 23-Apr-24 25-Apr-24
back fiiling in 2 nd portion of walls 25-Apr-24 26-Apr-24
grading for steps 27-Apr-24 28-Apr-24
PCC for steps area 29-Apr-24 29-Apr-24
granite laying on steps 30-Apr-24 5-May-24
Main entrance wall demolion 14-Apr-24 16-Apr-24
ramp area base prepatopn 17-Apr-24 17-Apr-24
reinforcement 18-Apr-24 19-Apr-24
shutternig ramp 20-Apr-24 20-Apr-24
concrete 21-Apr-24 21-Apr-24

Note :
This Schedule is subjected to:-
Timely Handing over of work fronts
Timely Issue of GFC Drawings/Clearances-45 days in advance for planned Activities.
Issue of typical floor GFC Drawings.
e work
Date: 21-03-2024
Duration Slab Cycle Remark
46.00
5.00
2.00
17.00
0.00
3.00
1.00
0.00

2.00
0.00
2.00
0.00
3.00
2.00
0.00
0.00
0.00
7.00
0.00
0.00
1.00
0.00
1.00
0.00
3.00
1.00
1.00
2.00
1.00
1.00
0.00
5.00
2.00
0.00
1.00
0.00
0.00
0.00
SUFC PROJECT- HOSTEL BLOCK DRAWINGS REQUIREMENT SCHEDULE
HOSTEL BLOCK (GF+3F)
SL No DRAWINGS DATE
A ARCHITECTURAL DRAWINGS
FLOOR PLANS & SECTIONS: GROUND TO TERRACE
1 10/20/2023
FLOOR
2 2D & 3D ELEVATION & SECTION DETAILS 10/20/2023
3 MASONARY DRAWINGS
GROUND FLOOR 11/30/2023
FIRST FLOOR 12/30/2023
SECOND FLOOR 1/30/2024
THIRD FLOOR 30-02-2024
TERRACE FLOOR 3/30/2024
4 TILE LAYOUT DRAWINGS 1/15/2024
5 DOORS DETAILS 1/15/2024
6 GLAZING, WINDOWS & ACP DETAILED DRAWINGS 2/15/2024

B STRUCTURAL DRAWINGS
1 COLUMNS SETTING OUT PLAN 10/25/2023
2 FOOTING DRAWINGS 10/25/2023
3 PEDESTAL & COLUMN DETAILS 10/25/2023
4 PLINTH BEAM & GRADE SLAB DETAILS 10/25/2023
5 GROUND FLOOR ROOF DRAWING 11/15/2023
6 FIRST FLOOR ROOF DRAWING 12/10/2023
7 SECOND FLOOR ROOF DRAWING 1/10/2024
8 THIRD FLOOR ROOF DRAWING 2/10/2024
9 STAIRCASE HEAD ROOM DRAWING 2/10/2024

C MEP DRAWINGS
1 UNDERGROUND PIPING LAYOUT 10/25/2023
2 ALL FLOOR MEP DETAILED DRAWINGS 11/15/2023
EQUIREMENT SCHEDULE
F)
REMARKS

GFC
GFC
GFC
GFC
GFC
GFC
GFC
GFC
GFC
GFC
GFC

GFC
GFC
GFC
GFC
GFC
GFC
GFC
GFC
GFC

GFC
GFC