Professional Documents
Culture Documents
LMSL10
LMSL10
SUSTAINABLE LAND
Small Flood Detention Dams
ET:LM:SL10:GE:May 1996
Regional Council
S a f e g u a r d i n g Yo u r E n v i r o n m e n t
• The base of a 2.6m dam needs to have construct an average dam wall of 40m
a cross section width of 20m with side length.
batter slopes of 3 horizontal to 1 vertical. • The dam and all exposed areas must be
This will allow a ute to drive up the sides topsoiled and oversown immediately
without traction problems. with a grass/legume seedmix such as:
• A grassed spillway at least two metres 30% Lotus Maku; 20% annual ryegrass
wide and a horizontal level cross section such as Moata; 20% Yorkshire Fog such
and a grade of no more than 5 as Massey Basyn; 10% cocksfoot; 10%
horizontal to 1 vertical is needed to cope white clover; 5% subterranean clover
with flood water. The spillway should and 5% browntop at a rate of 45kg/ha
start 600mm below the crest of the dam with fertilizer at a rate of 1000kg/ha Use
embankment. Water must be spread a temporary electric fence until the
evenly across the spillway when pasture is established.
operating. • Provided that dams are properly
• One 160mm Novacoil pipe is used to constructed their maintenance
take the water through the dam. The requirements are minimal. Keep the
inlets must be at the lowest point to dam wall and spillway grassed and the
ensure no water is stored permanently inlet and outlet pipes clear. Protect the
behind the wall, which means the pipes with concrete blocks to prevent
bottom of the storage area is always stock/vehicle damage. The pipe outlets
grassed. It takes half a day or more for a are a point of scour and may require
dam to empty. extra protection to prevent excessive
• A motor scraper and bulldozer are scouring. The inlet and outlets will
required to build a compacted dam. require checking periodically to ensure
Compacting should be done with the they are clear. An intake grill to prevent
rubber tyred vehicle in layers of no more debris blocking the Novacoil pipe will be
than 200mm. This will take from three to required.
five days depending on the size of the • Keep stock off the structure until all
site chosen. Around 1500m3 of surfaces are established in pasture.
compacted material is required to
Resource Consents Key Points of Dam Design
A resource consent is NOT required • A catchment area above a floodwater
provided: control dam should not exceed 40ha.
a) the catchment area of the dam is less • The dam embankment crest should not
than 50ha exceed 2.6m in height, including 600mm
b) the depth of water is no greater than 3m of freeboard.
at any time • Topsoil will need to be stripped from the
c) the volume of water retained is no dam embankment site prior to
greater than 20,000m3 construction and from the storage area
d) a spillway is constructed to prevent the if reshaping is required.
dam being overtopped in a storm event • The base of a 2.6m dam needs to have
larger than the capacity of the dam a cross section width of 20m with a side
e) the retained water shall not encroach batter slopes of 3 horizontal to 1
onto neighbouring properties unless the vertical.
neighbouring property owner agrees. • A grassed spillway of at of at least 2m
width and a horizontal level cross
section and a grade of no more than 5
horizontal to 1 vertical is needed to cope
with flood water.
• One 160mm Novacoil pipe is used to
take the water through the dam.
• A motor scraper and bulldozer are
required to build a compacted dam.
• The dam and all exposed areas must be
topsoiled and oversown immediately
with a grass/legume seedmix.
• An intake grill to prevent debris blocking
the Novacoil pipe will be required.
• Keep stock off the structure until all
surfaces are established in pasture.