Name: MAGDADARO, RUTHIE ANN N. Yr.

/Course/Section: 4 BSABE C
Instructor: RYAN ART M. TULING, ABE, EnP Date submitted:

Application
Laboratory Activities
Gabion Checkdam

Schedules:
1. Gabion Baskets
 Material: Woven Wire Mesh
 Dimension: 3m x 1m x 1m
 Quantity: 84
2. Stone Fill:
 Type: Crushed Stone
 Size: 2in- 4in
 Quantity: 3 cubic meter per baskets
3. Geotextile fabric:
 Material: Non-Woven Geotextile (TYPE III)
- Tensile Strength: Generally ranges from 300 to 600 pounds per foot (lbs/ft) or 4.5 to 9
kilonewtons per meter (kN/m).
- Grab Strength: Typically falls within the range of 150 to 350 pounds (lbs) or 6700 to
1560 newtons (N).
- Weight: Typically falls within the range of 6 to 12 ounces per square yard (oz/yd²) or
200 to 400 grams per square meter (g/㎡).
4. Lacing Detail:
 Material: Woven Mesh
5. Binding Wire
 Material: Galvanized Steel Wire
 Diameter: Minimum of 0.15 in (FASTENER INTERLOCKING WIRE) and 0.12 in (FASTENER
OVERLPPING RING)
 Quantity: 20 kg
6. Foundation
 Dimension: 5m x 24m x 1.50m
7. Mattress
 Dimension: 6m x 24m x 0.40m

Details:
1. Gabion Basket Construction:
 Twisted wire mesh gabion baskets with dimensions of 3m x 1m x 1m
 Welded joints for added strength and durability
 Woven Mesh Size of 75mm x 75mm
 Galvanized coating for corrosion resistance
2. Stone Fill Placement:
 Gabion baskets to be filled with crushed stone of size 2.4 inches
 Stone fill to be compacted inside the baskets to ensure stability
 Filling to be done in layers, ensuring proper interlocking and distribution of stone fill.

Sections:
1. Cross-Section:
 Shows the cross-sectional view of the gabion checkdam.
 Includes dimensions of the gabion baskets, stone fill, and geotextile fabric.
 Illustrates the arrangement of the gabion baskets and the stone fill within.
Computation:
A. Dimension

Length Width Height No.Of Volume (cu.m) Total


G.Baskets Volume
(pcs) (cu.m)
G.Basket 3m 1m 1m 8 3x1x1=3 cu.m 3 cu.m x
(1st row) 8pcs= 24
G.Basket 3m 1m 1m 76 3x1x1=3 cu.m 3 cu.m x
(2nd to 4th ) 74 pcs=
228
Mattress 6m 24m 0.40m 6x24x0.40=57.6 57.6
Foundation 5m 24m 1.50m 5x24x1.50=180 180
489.6
cu.m

C.Gabion Basket
Gabion Basket Cost (including stone) 885.79 Php/cu.m
Total Volume (cu.m) 489.6 cu.m
Total Gabion Cost 489.6 cu.m x 885.79 pesos = Php
223,219.08/cu.m

D. Overall Cost Estimate


Excavation Php 139,600.80
Gabion Basket Php 433,682.784
Galvanized Steel Wire/kilo Php 95 x 20 kg = Php 1,900
Labor (for build the structure of gabion Php 450/Day (except excavation labor)
checkdam)
Let’s assume that the filling rate of the gabion
basket in 10 cu.m per day. To calculate the
number of days required to fill the g ion
checkdam, we can use the following formula:

Number of days = Total Volume of gabion


checkdam / filling rate
Number of Days = 489.6 cu.m / 10 cu.m per
day
Number of Days = 48.96 days or 49 days

Therefore, it will tke approximately 49 days in


8 hours (except Saturday and sunday) to fill
the gabion checkdam if the filling rate is 10
cu.m per day.

Php 450 x 49days = Php 22,050


Construction Cost Php 597,233.584
Contingency Fund (5%) Php 597,233.584 x .5 = 29,861.6792
Grand Total Php 597,233.584+ 29,861.6792 = Php
627,095.2632

E. If the total height of the gabion check dam is < 3 m, box gabions of the following dimensions
may be used:
1mx1mx2m
0.85 m x 0.85 m x 2 m
0.75 m x 1.5 m x 3 m
If the total height of the gabion check dam is 3 m to 5 m, use the following formula
k = 0.4 H d = 0.6 H f = 0.3 H
where:
k is the thickness of the dam's crest at spillway level (m)
d is the thickness of the dam's base (m)
f is the depth of foundation (m)
H is the total height of the dam including foundation (m)

COMPUTATION:
FOUNDATION: 1.50 meters
GABION BOX (4 ROW): 4 meters

k = 0.4 (1.50m + 4m) = 2.2 m


d = 0.6 (5.5m) = 3.3m
f = 0.3 (5.5) = 1.65m
Application
Laboratory Activities
Grassed/Vegetative Waterway

Computation:

Given:

Top width of the waterway (T) = 3 meters

Top width of the waterway at midpoint (t) = 2 meters

Depth of waterway (D) = 0.5 meters

Depth of waterway at midpoint (d) = 0.4 meters

Slope of the waterway (S) = 2% (0.02 in decimal form)

Manning's roughness coefficient (n) = 0.04 (representing good quality cover)

Desired velocity range (V) = 1.5-1.8 m/s

Solution:

A.) Calculate the Hydraulic Radius (R): B.) Calculate the Flow Area at Midpoint (Am) and
Wetted Perimeter at Midpoint (Pm):
A=TxD/2
Am = t x d / 2
= 3m x 0.5m / 2
= 2 m x 0.4m / 2
A= 0.75 ㎡
Am = 0.4 ㎡
P=T+2XD
Pm = t + 2 x d
= 3m + 2 x 0.5m
= 2m + 2 x 0.4m
P = 4m
Pm = 2.8m
R = A/P
C.) Calculate the Hydraulic Radius (Rm):
= 0.75 ㎡/4m
Rm = Am/Pm = 0.4 ㎡/2.5m Rm = 0.1429m
D.)
R =Determine
0.1875m the Average Hydraulic Radius (Ra):
F.) To Calculate the Discharge
Ra = R + Rm / 2
(Q) through the Grass
= 0.1875m + 0.1429 /2 waterway:

Ra =0.1652m Q=AxV

E.) Use the Manning’s Equation to Calculation the Flow Velocity (V): = 0.75 ㎡ x 1.85 m/s

V = 1/n x Ra^2/3 x S^1/2 Q = 1.3875 m^3/s


= 1/0.04 x (0.1652m)^2/3 x (0.02)^1/2 So, the discharge through the
grass waterway is approximately
= 1/0.04 x (0.3010m) x 0.1414
1.3875 m^3/s.
V = 1.85m/s
COST ESTIMATE

Description Quantity Unit Cost (PHP) Total Cost (PHP)

Excavation 100 m³ PHP 1,500/m³ PHP 150,000

Php 500 x 5 labors =


5 labors for grass Php 2,500/day x 4 days
planting, etc (4 days) Php 500/day = Php 10,000

Miscellaneous Costs PHP 5,000

Total Material Cost PHP 165,000

Contingency Fund (5%) Php 8,250

Grand Total Php 173,250

Solution:

Excavation cost per cubic meter: PHP 1,500

Miscellaneous costs: PHP 10,000

We'll need to calculate the total excavation used in the project. Once we have those values, we can
calculate the total costs.

Let's calculate:

Volume of excavation: 100 cubic meters

Now, let's calculate the total costs:

Excavation cost:

Excavation Cost = Volume × Unit Cost

Excavation Cost = 100m³ × PHP 1,500/m³

Excavation Cost = PHP 150,000