Kapp-Thali

RFI 23.04.2024

Requested Scheduled
Chainage Chainage
Sr No Status RFI ID Category Sub-Category Item Layer Side Activity Date & Date & Inspector Result IE Inspector IE Result
From To
Time Time

Main Carriageway 22/04/202 23/04/202


RFI Raised By N/04002/15003/KL/RFI/HI Sub-Base Top FDD and Level Checking for CTGSB Top Mr krishna Arun
1 Highway (Flexible RHS 336.36 336.54 4 03:31 4 10:30 Pending Pending
Contractor GHWAY/N/496 Course Layer Layer(MCW) kumar maurya prakash
Pavement) PM AM

Checking of reinforcement, shuttering, 22/04/202 23/04/202


RFI Raised By N/04002/15003/KL/RFI/OT Other Road Side Drains- Lined Drain Mr krishna
2 NA LHS 337.927 337.94 centering and pouring concrete M-30 Grade 4 03:24 4 06:10 Pending Pending
Contractor HERWORKS/N/495 Works (i) Lined Drain (Slab) kumar maurya
for Drain Slab PM PM

22/04/202 23/04/202
RFI Raised By N/04002/15003/KL/RFI/OT Other Retaining A1 Mr krishna
3 PCC LHS 338.12 338.16 PCC M-15 Grade for Retaining Wall 4 03:24 4 06:00 Pending Pending
Contractor HERWORKS/N/494 Works Wall/Breast Wall Side kumar maurya
PM PM

22/04/202 23/04/202
RFI Raised By N/04002/15003/KL/RFI/OT Other Retaining A1 Mr krishna Sagar
4 PCC RHS 336.7 336.84 PCC M-15 Grade for Retaining Wall 4 03:24 4 06:30 Pending Pending
Contractor HERWORKS/N/493 Works Wall/Breast Wall Side kumar maurya Rawat
PM PM
Botto
m 22/04/202 23/04/202
RFI Raised By N/04002/15003/KL/RFI/OT Other Retaining Mr krishna Shubham
5 Excavation Layer RHS 338.12 338.16 Checking for Retaining Wall Excavation 4 03:24 4 08:00 Pending Pending
Contractor HERWORKS/N/492 Works Wall/Breast Wall kumar maurya yadav
(A1 PM AM
side)
Botto
m 22/04/202 23/04/202
RFI Raised By N/04002/15003/KL/RFI/OT Other Retaining Mr krishna
6 Excavation Layer RHS 336.7 336.84 Checking for Retaining Wall Excavation 4 03:24 4 08:30 Pending Pending
Contractor HERWORKS/N/491 Works Wall/Breast Wall kumar maurya
(A1 PM AM
side)
Top Checking of reinforcement, shuttering, 22/04/202 23/04/202
RFI Raised By N/04002/15003/KL/RFI/OT Other Retaining Mr krishna
7 Wall Lift (A1 LHS 338.1 338.117 centering and pouring concrete M-30 Grade 4 03:24 4 03:00 Pending Pending
Contractor HERWORKS/N/490 Works Wall/Breast Wall kumar maurya
side) for Retaining Wall top Lift PM PM

Checking of reinforcement, mould and 22/04/202 23/04/202


RFI Raised By N/04002/15003/KL/RFI/OT Other Mr Alok Arun
8 RE Wall Casting NA NA 351.6 NaN pouring concrete M-35 for RE Panel Casting 4 03:02 4 04:00 Pending Pending
Contractor HERWORKS/N/489 Works Pandey prakash
A+12 , S4 10 , B+ 02, LTD 01 , SH4 4 PM PM
"Checking of reinforcement, mould and
22/04/202 23/04/202
RFI Raised By N/04002/15003/KL/RFI/OT Other pouring concrete M-35 for RE Panel Casting Mr Alok Sankar
9 RE Wall Casting NA NA 353.9 NaN 4 03:02 4 04:30 Pending Pending
Contractor HERWORKS/N/488 Works A+19 , A 02, P2 02 ,F6 01 Pandey Kumar
PM PM
Corner 01"
Requested Scheduled
Chainage Chainage
Sr No Status RFI ID Category Sub-Category Item Layer Side Activity Date & Date & Inspector Result IE Inspector IE Result
From To
Time Time
well
foundation /
Checking of reinforcement, shuttering, 22/04/202 23/04/202 deepak
RFI Raised By N/04002/15003/KL/RFI/ST pile Mr Awaneesh
10 Structure New Major Bridge Pile 5 LHS 355.927 NaN centering and pouring concrete M-35 Grade 4 03:02 4 04:30 Pending Kumar Pending
Contractor RUCTURE/N/487 foundation / Kumar Rai
for MJB P5 Pile No. 10 LHS PM PM pushpaker
open
foundation
Checking of reinforcement, shuttering, 22/04/202 23/04/202
RFI Raised By N/04002/15003/KL/RFI/OT Other Retaining Mr krishna
11 Raft NA RHS 344.14 344.152 centering and pouring concrete M-30 Grade 4 03:02 4 09:30 Pending Pending
Contractor HERWORKS/N/486 Works Wall/Breast Wall kumar maurya
for Retaining Wall Raft PM AM

22/04/202 23/04/202 Mr Chandra


RFI Raised By N/04002/15003/KL/RFI/OT Other Erection and Checking of Re-Peanl Erection 5th Layer for
12 RE Wall Layer 5 RHS 345.15 345.3 4 03:02 4 04:00 Mohan Rao Pending Pending
Contractor HERWORKS/N/485 Works Alignment Re-Wall-5
PM PM Bommali

22/04/202 23/04/202 Mr Chandra


RFI Raised By N/04002/15003/KL/RFI/OT Other Layer FDD Checking of Emb 20th Layer Re-Wall Sagar
13 RE Wall Backfilling LHS 346.51 346.615 4 03:02 4 11:30 Mohan Rao Pending Pending
Contractor HERWORKS/N/484 Works 20 No.1 Rawat
PM AM Bommali

22/04/202 23/04/202 Mr Chandra


RFI Raised By N/04002/15003/KL/RFI/OT Other FDD Checking of Emb 8th Layer Re-Wall
14 RE Wall Backfilling Layer 8 LHS 346.37 346.48 4 03:02 4 11:00 Mohan Rao Pending Pending
Contractor HERWORKS/N/483 Works No.1
PM AM Bommali