RFI 23.04.2024 Pkg4
RFI 23.04.2024 Pkg4
RFI 23.04.2024
Requested Scheduled
Chainage Chainage
Sr No Status RFI ID Category Sub-Category Item Layer Side Activity Date & Date & Inspector Result IE Inspector IE Result
From To
Time Time
22/04/202 23/04/202
RFI Raised By N/04002/15003/KL/RFI/OT Other Retaining A1 Mr krishna
3 PCC LHS 338.12 338.16 PCC M-15 Grade for Retaining Wall 4 03:24 4 06:00 Pending Pending
Contractor HERWORKS/N/494 Works Wall/Breast Wall Side kumar maurya
PM PM
22/04/202 23/04/202
RFI Raised By N/04002/15003/KL/RFI/OT Other Retaining A1 Mr krishna Sagar
4 PCC RHS 336.7 336.84 PCC M-15 Grade for Retaining Wall 4 03:24 4 06:30 Pending Pending
Contractor HERWORKS/N/493 Works Wall/Breast Wall Side kumar maurya Rawat
PM PM
Botto
m 22/04/202 23/04/202
RFI Raised By N/04002/15003/KL/RFI/OT Other Retaining Mr krishna Shubham
5 Excavation Layer RHS 338.12 338.16 Checking for Retaining Wall Excavation 4 03:24 4 08:00 Pending Pending
Contractor HERWORKS/N/492 Works Wall/Breast Wall kumar maurya yadav
(A1 PM AM
side)
Botto
m 22/04/202 23/04/202
RFI Raised By N/04002/15003/KL/RFI/OT Other Retaining Mr krishna
6 Excavation Layer RHS 336.7 336.84 Checking for Retaining Wall Excavation 4 03:24 4 08:30 Pending Pending
Contractor HERWORKS/N/491 Works Wall/Breast Wall kumar maurya
(A1 PM AM
side)
Top Checking of reinforcement, shuttering, 22/04/202 23/04/202
RFI Raised By N/04002/15003/KL/RFI/OT Other Retaining Mr krishna
7 Wall Lift (A1 LHS 338.1 338.117 centering and pouring concrete M-30 Grade 4 03:24 4 03:00 Pending Pending
Contractor HERWORKS/N/490 Works Wall/Breast Wall kumar maurya
side) for Retaining Wall top Lift PM PM