Date 18-04-24
HVAC Pre - Commissioning Report Job Ref.
Sheet 1 OF 22
Client : SAIF BIN DARWISH
Project : AL RAWDHAT -RESIDENTIAL BUILDING -PLOT C51-E48ABU DHABI- UAE
Consultant : FINE ART
Main Contractor : SAIF BIN DARWISH COMPANY L.L.C MEP Contractor : SAIF BIN DARWISH COMPANY L.L.C
Plant Reference: FAHU-02 - (EA)
Location / Area Serving: ROOF / BUILDING
Ref Item Ready Remarks Ref Item Ready Remarks
Yes No Yes No
1 All Terminals fitted and Damper 16 Fuse Rating correct
open P P
10 TOTAL 336.33
11 AVRAGE 8.008
12
10 TOTAL 39.52
11 AVRAGE 4.391
12
10 TOTAL 58.78
11 AVRAGE 4.898
12
10 TOTAL 43.98
11 AVRAGE 4.887
12
10 TOTAL 72.77
11 AVRAGE 6.064
12
10 TOTAL 51.04
11 AVRAGE 4.253
12
10 TOTAL 93.10
11 AVRAGE 4.655
12
10 TOTAL 34.69
11 AVRAGE 3.854
12
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 11 OF 22
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 12 OF 22
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 13 OF 22
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 14 OF 22
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 15 OF 22
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 16 OF 22
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 17 OF 22
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 18 OF 22
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 19 OF 22
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 20 OF 22
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 21 OF 22
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 22 OF 22
RISER DESIGN ACTUAL FLOW Final Outlets Summation
TRAVERSE NAME AREA SERVING COMMENTS
Vol (CFM) Vol (CFM) Vol (CFM) %
(EXHAUST AIR) - MAIN SHAFT # 4,5, AND 6 8720 8820 8820 100.0
TRAVERSE 4 / EAR 1 FLAT 12 990 977 946 96.9
TRAVERSE 4 / EAR 2 FLAT 11 + R07 + GF 1480 1452 1431 98.5
TRAVERSE 5 / EAR 1 FLAT 13 + GF 1110 1087 1076 99.0
TRAVERSE 5 / EAR 2 FLAT 14, 15, 16 2610 2569 2520 98.1
TRAVERSE 6 / EAR 1 FLAT 17 + R08 1100 1081 1064 98.4
TRAVERSE 6 / EAR 2 FLAT 18, 19, R09, R10, GF 1430 1380 1366 99.0
TRAVERSE OF LIFT LIFTS 750 735 735 100.0