Fahu-03 (Ea)
Fahu-03 (Ea)
-
Date 18-04-24
HVAC Pre - Commissioning Report Job Ref.
Sheet 1 OF 21
Client : SAIF BIN DARWISH
Project : AL RAWDHAT -RESIDENTIAL BUILDING -PLOT C51-E48ABU DHABI- UAE
Consultant : FINE ART
Main Contractor : SAIF BIN DARWISH COMPANY L.L.C MEP Contractor : SAIF BIN DARWISH COMPANY L.L.C
Plant Reference: FAHU-03 - (FA)
Location / Area Serving: ROOF / BUILDING
Ref Item Ready Remarks Ref Item Ready Remarks
Yes No Yes No
1 All Terminals fitted and Damper 16 Fuse Rating correct
open P P
10 TOTAL 380.43
11 AVRAGE 7.764
12
10 TOTAL 113.54
11 AVRAGE 5.677
12
10 TOTAL 112.14
11 AVRAGE 5.607
12
10 TOTAL 92.42
11 AVRAGE 4.621
12
10 TOTAL 80.39
11 AVRAGE 5.359
12
10 TOTAL 105.48
11 AVRAGE 5.274
12
10 TOTAL 42.46
11 AVRAGE 4.718
12
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 10 OF 21
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 11 OF 21
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 12 OF 21
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 13 OF 21
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 14 OF 21
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 15 OF 21
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 16 OF 21
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 17 OF 21
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 18 OF 21
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 19 OF 21
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 20 OF 21
Date 18-04-24
AIR BALANCE SHEET Job Ref
Sheet 21 OF 21
RISER DESIGN ACTUAL FLOW Final Outlets Summation
TRAVERSE NAME AREA SERVING COMMENTS
Vol (CFM) Vol (CFM) Vol (CFM) %
(EXHAUST AIR) - MAIN SHAFT # 7,8, 9, AND 10 10660 10524 10319 98.1
TRAVERSE 7 / EAR MAIN FLAT 20, 21, ROOF 3060 2976 2941 98.8
TRAVERSE 8 / EAR MAIN FLAT 22, 23, GYM 2990 2939 2905 98.8
TRAVERSE 8 / EAR 2 FLAT 22 990 979 975 99.6
TRAVERSE 9 / EAR MAIN FLAT 6, 7, R05 2020 1986 1968 99.1
TRAVERSE 10 / EAR MAIN FLAT 8, 9, R03, R06, GF 2590 2513 2505 99.7
TRAVERSE 10 / EAR 1 FLAT 8, R06, GF 1090 1049 1041 99.2