01 General 1.

General 1. A site risk assessment must be completed before MEWP, use to identify To minimise risks and TATA STEEL SS/ENGG-07
Requirement
be developed and implemented
SAFE WORK PROCEDURE
risk associated working site. After hazards are identified, procedures must hazards, ensuring the well
to eliminate or mitigate risks. – being and protect of
LIMITED (PPE)
SS/Gen-13
E&P/ Safety/ 01 Engineering & Projects Effective Date: - 05-08-2023: Rev – 04
DEPARTMENT / PROJECT 2. Selection of MEWP
TSK_ENGINEERING & PROJECT_BF#02 to be done based on type of task, worksite constraints, people
DOC NO. & property MR. GIRIJA
TSK/E&P/BF#02/IRISE/MECH/SWP/001 SS/Gen-30
SECTION/ SITE BF#02 ground conditions, site access, proximity to another worker. SHANKAR SS/Gen-25
JOB TITLE 3. Allow only trained and authorized
Operation of MEWP (Man lifter) & Personnel Handling
personnel to operate and/or occupy WORK ORDER NO TRIPATHY Ss/Gen -29
3800018718
START DATE
MEWP. Minimum one trained operator is mandatory for use of machine. (7328849799)
25/10/2022
Third party certification of trained operator is pre-requisite for operator END DATE 24/01/2024
MR. BIRENDRA
SL. Ref Document/
No
Activities / Sequence Work and rescue
Instruction supervisor.
/ Hazard & Safety Precautions Why KATRE
Responsibility
Remarks
4. Planning of operation, including rescue plans for safe recovery of persons (9040094272)
and/ or MEWP in event of an emergency to be done.
5. Access, preparation and maintenance of site, as required, to include an
assessment that support surface is adequate to support weight of MEWP IRISE INDIA PVT.LTD
6. MEWP maintenance, including inspection(s) and repairs as required by MR. RITESH
applicable standards and by the manufacture PATHAK
7. Ensuring that authorized MEWP operators have been familiarized with (9930041788)
specific MEWP to be used MR. PARMESWAR
8. Ensuring that operators are informed of local site requirements and has VERMA
been warned and provided means to protect against identified hazards in (7208063575)
areas where MEWP will be operated
9. Having a trained and qualified supervisor to monitor performance and
work of operator
10. Prevention of unauthorized use of MEWP
11. Adequate illumination needs to be provided over whole working area.
12. Stagger working arrangements, if possible, to avoid other overhead
workers. If this is not possible, take whatever action is necessary to ensure
there can be no contact with personnel and no materials/substances can
fall into basket of MEWP
13. Work permit needs to be taken prior start of job
14. Only 2 persons are allowed for bucket operation with 230kgs mode and
maximum 3 persons are allowed for 450kgs bucket capacity mode.
15. Higher capacity machines (135ft elevation and above) have dual mode
which can be decide as per requirement for bucket selection of 230kgs or
450kgs.
Name: - 16. Multi-function activities are Name:not -allowed by all crew member of machines Name: -
Date:- at elevated level. Only one activity
Date:- at a time is acceptable by each crew Date:-
E&P Departmental Representative/member. Consultant For e.g., Operator E&Pcannot guide or signal crane operator while
Safety Representative Working Agency / Contractor Representative
Remarks using MEWP control panel, he should stop MEWP and put in rest mode
1. 6 - direction hazards (Up/Down/Front/Back/Left/Right)
before he startsofanother other jobs being done of
activity in close
crane proximity have to be recorded daily and has to be discussed in the Tool Box Talk
signalling.
2. Job specific SWP should be made and attached to this SWP with additional precautions for any additional activities (if any). This should be step by step including all steps.
3. The job specific SWP will be 17. TPIasfor
modified andMEWP
when theto be ofdone
nature at the maximum capacity 230kgs or 450kgs
job changes
4. 18. Its mandatory to used Haloathelmet
Training on SWP to be given to all workmen by E&P Officer / Consultant the start ofin
theall
job MEWP andleast
and thereafter therefore operator
once per year and by Contractor representative on a monthly basis. The monthly training record should be attached with
the monthly bill or Job Measurement Report.
5. Review on status of implementationmust
shall beensure its battery
done through Job Cyclecharging every
Check by Safety night / Consultant/ E&P Officer at least once per month
Supervisor
19. While operating MEWP from bucket, operator must position himself
inside the OPS guard to save himself from any unforeseen collision with
SAFE WORK PROCEDURE
E&P/ Safety/ 01 Engineering & Projects Effective Date: - 05-08-2023: Rev – 04
DEPARTMENT / PROJECT TSK_ENGINEERING & PROJECT_BF#02 DOC NO. TSK/E&P/BF#02/IRISE/MECH/SWP/001
SECTION/ SITE BF#02
JOB TITLE Operation of MEWP (Man lifter) & Personnel Handling WORK ORDER NO 3800018718
START DATE 25/10/2022 END DATE 24/01/2024
SL. Ref Document/
Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility
No Remarks

9 Pre-Start Up  Daily Inspection Check Sheet to be filled up religiously prior to equipment  Machine not in  Maintenance
Inspection of deployment at site serviceable In charge/
Vehicle/ Vehicle in  Only experience operator shall execute inspection of vehicle. condition Technician
idle or parked  Fuel & Battery backup must be checked to ensure breakdown will not
 Electrocution  Equipment
condition occurred during job execution/ marching.
from power lines Operator
 Daily Inspection Check Sheet is to be verified by job owner at any
designated location prior to use of vehicle.  Unauthorized use  Vendor
Supervisor/
Safety In-
charge

10 Marching of All below mentioned activities are to be carried out only after inspection of Man  Crush Hazard  Maintenance In
Telescopic Boom lifter in its entirety as per prescribed check sheet. If any major discrepancies are  Man lifter tipping charge/
Man lifter to observed which may impact operation of MEWP, equipment is to be stopped till or rolling over Technician
designated location
further inspection and clearance by appropriate authorities  Striking or coming  Equipment
into contact with Operator
 Operator to start machine from main control panel and lower telescopic boom sharp objects.
and basket of Man lifter to ground level Use of Safety Harness is mandatory for  Running into  Vendor
following activities: bystanders or Supervisor/
 Mount basket of Man lifter and latch on safety harness to a rigid anchor point. unexpected Safety In-charge
 Raise boom of Man lifter to a height from where front of machine is visible movement of
clearly to operator. Man lifter
Boom height to be monitored strictly so as to ensure it doesn’t impact any  Electrocution

Name: - Name: - Name: -


Date:- Date:- Date:-
E&P Departmental Representative/ Consultant E&P Safety Representative Working Agency / Contractor Representative
Remarks
1. 6 - direction hazards (Up/Down/Front/Back/Left/Right) of other jobs being done in close proximity have to be recorded daily and has to be discussed in the Tool Box Talk
2. Job specific SWP should be made and attached to this SWP with additional precautions for any additional activities (if any). This should be step by step including all steps.
3. The job specific SWP will be modified as and when the nature of job changes
4. Training on SWP to be given to all workmen by E&P Officer / Consultant at the start of the job and thereafter least once per year and by Contractor representative on a monthly basis. The monthly training record should be attached with
the monthly bill or Job Measurement Report.
5. Review on status of implementation shall be done through Job Cycle Check by Safety Supervisor / Consultant/ E&P Officer at least once per month
SAFE WORK PROCEDURE
E&P/ Safety/ 01 Engineering & Projects Effective Date: - 05-08-2023: Rev – 04
DEPARTMENT / PROJECT TSK_ENGINEERING & PROJECT_BF#02 DOC NO. TSK/E&P/BF#02/IRISE/MECH/SWP/001
SECTION/ SITE BF#02
JOB TITLE Operation of MEWP (Man lifter) & Personnel Handling WORK ORDER NO 3800018718
START DATE 25/10/2022 END DATE 24/01/2024
SL. Ref Document/
Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility
No Remarks

overhead structures from power lines


 Entanglement
 Marching of Man lifter is to be carried out only on proper/ designated  Unauthorized Use
pathways/ roads. In case equipment is to march on an uneven surface,  Inclement
pathway is to be inspected by operator and necessary modifications (if Weather
required) are to be carried out to pathway.  Shearing or
 In case of high winds or inclement weather, Man lifter is not to be operated cutting of body or
if conditions exceed Manufacturers maximum rating. limbs
 During Marching on TSL Roadways, buzzer to be used at all times to alert  Slipping, tripping
bystanders/ vehicles of equipment movement or falling out of
 It is understood that equipment marches at a lower speed due to machine
limitations of its hydraulic system. speed of vehicle must never exceed  Slipping on deck
standards set by its approved and by TSL.  Striking or hitting
 Marching of man lifters beyond permissible working hours must be taken in bystanders during
written clearance from Road safety department by concerned user. travel
 This permission shall be verified by man lifter operator & supervisor.

11 Work Permit at  Work Permit is to be filled up for individual working agency in form #  Maintenance In SS/GEN-25 (Work
designated usage EHSMSM/WORKS/446/4007. charge/ Permit)
location prior to  Six directional hazard identification form to be filled up at site by Concerned Technician
deployment into
Area Mechanical Maintenance to be communicated to Operator of Man lifter.  Equipment
service.
 It is responsibility of Operator of Man lifter to understand risks and hazards Operator

Name: - Name: - Name: -


Date:- Date:- Date:-
E&P Departmental Representative/ Consultant E&P Safety Representative Working Agency / Contractor Representative
Remarks
1. 6 - direction hazards (Up/Down/Front/Back/Left/Right) of other jobs being done in close proximity have to be recorded daily and has to be discussed in the Tool Box Talk
2. Job specific SWP should be made and attached to this SWP with additional precautions for any additional activities (if any). This should be step by step including all steps.
3. The job specific SWP will be modified as and when the nature of job changes
4. Training on SWP to be given to all workmen by E&P Officer / Consultant at the start of the job and thereafter least once per year and by Contractor representative on a monthly basis. The monthly training record should be attached with
the monthly bill or Job Measurement Report.
5. Review on status of implementation shall be done through Job Cycle Check by Safety Supervisor / Consultant/ E&P Officer at least once per month
SAFE WORK PROCEDURE
E&P/ Safety/ 01 Engineering & Projects Effective Date: - 05-08-2023: Rev – 04
DEPARTMENT / PROJECT TSK_ENGINEERING & PROJECT_BF#02 DOC NO. TSK/E&P/BF#02/IRISE/MECH/SWP/001
SECTION/ SITE BF#02
JOB TITLE Operation of MEWP (Man lifter) & Personnel Handling WORK ORDER NO 3800018718
START DATE 25/10/2022 END DATE 24/01/2024
SL. Ref Document/
Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility
No Remarks

involved in job and evaluate operability of Man lifter at work zone.  Vendor
 In case safe use of equipment is not possible; it is to be justified to concerned Supervisor/
working agency. Safety In-charge

12 Placement of Man  The operator shall visit and observe area where job is to be carried out prior to  Crush Hazard  Maintenance in
lifter for Operation mobilization of Man lifter  Danger of not being charge/
 Prior to Man lifter placement, area is to be cordoned off to prevent entry of able to safely raise or Technician
unnecessary personnel. lower telescopic boom  Contractor
 The swing area of Man lifter is to be checked to prevent impact with any object  Man lifter tipping or supervisor
post placement rolling over.
 During placement, Man lifter is to be operated from its main control panel  Entrapment between
instead of its carriage control paned to ensure operator has visibility of Man lifter and
surrounding area. structures
 For any emergency, mock drills must be carried out once in every six months.  Striking or coming into
contact with sharp
The operator shall inform concerned person about basic function & emergency objects
switches available in cage to control if any adverse situation arises.  Running into
bystanders or
unexpected operation
of Man lifter
 Raising or lowering on

Name: - Name: - Name: -


Date:- Date:- Date:-
E&P Departmental Representative/ Consultant E&P Safety Representative Working Agency / Contractor Representative
Remarks
1. 6 - direction hazards (Up/Down/Front/Back/Left/Right) of other jobs being done in close proximity have to be recorded daily and has to be discussed in the Tool Box Talk
2. Job specific SWP should be made and attached to this SWP with additional precautions for any additional activities (if any). This should be step by step including all steps.
3. The job specific SWP will be modified as and when the nature of job changes
4. Training on SWP to be given to all workmen by E&P Officer / Consultant at the start of the job and thereafter least once per year and by Contractor representative on a monthly basis. The monthly training record should be attached with
the monthly bill or Job Measurement Report.
5. Review on status of implementation shall be done through Job Cycle Check by Safety Supervisor / Consultant/ E&P Officer at least once per month
SAFE WORK PROCEDURE
E&P/ Safety/ 01 Engineering & Projects Effective Date: - 05-08-2023: Rev – 04
DEPARTMENT / PROJECT TSK_ENGINEERING & PROJECT_BF#02 DOC NO. TSK/E&P/BF#02/IRISE/MECH/SWP/001
SECTION/ SITE BF#02
JOB TITLE Operation of MEWP (Man lifter) & Personnel Handling WORK ORDER NO 3800018718
START DATE 25/10/2022 END DATE 24/01/2024
SL. Ref Document/
Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility
No Remarks

uneven ground
 Electrocution from
Power Lines
 Explosion
 Shearing of body or
limbs

13 Use of Man lifter  Operator to start machine from main control panel and lower telescopic boom  Tools or material  Maintenance in
for approach to job and basket of Man lifter to ground level. falling from platform charge/
at height/  Any personnel who are to approach job at height must have a certified height  Danger of not being Technician
personnel handling.
pass and should not have any adverse health condition. able to safely raise or Contractor supervisor
 Upon climbing onto carriage of Man lifter, gate/ entry point onto carriage is to lower telescopic
be locked and secured. boom
 All personnel are to secure themselves onto carriage of Man lifter by latching  Man, lifter tipping or
their safety harness onto a designated anchor point. rolling over
 Being trapped
between telescopic
boom and fixed
 Any tools in use for job at height are to be secured onto platform or kept inside
structures
a tool box and not kept loose.
 Electrocution from
 Boom extension and platform maneuverer done via Hand Signs or Walkie only.
powerlines
Under no circumstance, instruction is to be provided via mobile phones.

Name: - Name: - Name: -


Date:- Date:- Date:-
E&P Departmental Representative/ Consultant E&P Safety Representative Working Agency / Contractor Representative
Remarks
1. 6 - direction hazards (Up/Down/Front/Back/Left/Right) of other jobs being done in close proximity have to be recorded daily and has to be discussed in the Tool Box Talk
2. Job specific SWP should be made and attached to this SWP with additional precautions for any additional activities (if any). This should be step by step including all steps.
3. The job specific SWP will be modified as and when the nature of job changes
4. Training on SWP to be given to all workmen by E&P Officer / Consultant at the start of the job and thereafter least once per year and by Contractor representative on a monthly basis. The monthly training record should be attached with
the monthly bill or Job Measurement Report.
5. Review on status of implementation shall be done through Job Cycle Check by Safety Supervisor / Consultant/ E&P Officer at least once per month
SAFE WORK PROCEDURE
E&P/ Safety/ 01 Engineering & Projects Effective Date: - 05-08-2023: Rev – 04
DEPARTMENT / PROJECT TSK_ENGINEERING & PROJECT_BF#02 DOC NO. TSK/E&P/BF#02/IRISE/MECH/SWP/001
SECTION/ SITE BF#02
JOB TITLE Operation of MEWP (Man lifter) & Personnel Handling WORK ORDER NO 3800018718
START DATE 25/10/2022 END DATE 24/01/2024
SL. Ref Document/
Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility
No Remarks

 In case of Man lifter usage near electrical power lines, necessary distance is to  Explosion
be maintained from lines.  High temperature or
fire
Voltage Minimum Distance  Inclement weather
<50 KV 10 ft  Telescopic Boom
50 - 199 KV 15 ft
Collapsing
200 – 349 KV 20 ft
 Slipping, tripping or
350 – 499 KV 25 ft
500 – 749 KV 35 ft falling out of machine
750 – 1000 KV 45 ft  Slipping on deck
 Any additional hazards
or risks (area specific)
 Man lifter should not be used in case of inclement weather or high wind
conditions which are beyond permissible limits as set by manufacturer.
 In case cutting/ welding activities are being carried out from carriage of Man
lifter, necessary precautions to be taken to protect body and hydraulic oil lines
from hot splatter.
 Material such as Sheets/ Plates are not to be carried to height via carriage of
Man lifter.
 Any operation requiring going inside / between structures will require separate
scheme approval from internal expert team

Presence of standby operator/ rescue supervisor at ground to operate base

Name: - Name: - Name: -


Date:- Date:- Date:-
E&P Departmental Representative/ Consultant E&P Safety Representative Working Agency / Contractor Representative
Remarks
1. 6 - direction hazards (Up/Down/Front/Back/Left/Right) of other jobs being done in close proximity have to be recorded daily and has to be discussed in the Tool Box Talk
2. Job specific SWP should be made and attached to this SWP with additional precautions for any additional activities (if any). This should be step by step including all steps.
3. The job specific SWP will be modified as and when the nature of job changes
4. Training on SWP to be given to all workmen by E&P Officer / Consultant at the start of the job and thereafter least once per year and by Contractor representative on a monthly basis. The monthly training record should be attached with
the monthly bill or Job Measurement Report.
5. Review on status of implementation shall be done through Job Cycle Check by Safety Supervisor / Consultant/ E&P Officer at least once per month
SAFE WORK PROCEDURE
E&P/ Safety/ 01 Engineering & Projects Effective Date: - 05-08-2023: Rev – 04
DEPARTMENT / PROJECT TSK_ENGINEERING & PROJECT_BF#02 DOC NO. TSK/E&P/BF#02/IRISE/MECH/SWP/001
SECTION/ SITE BF#02
JOB TITLE Operation of MEWP (Man lifter) & Personnel Handling WORK ORDER NO 3800018718
START DATE 25/10/2022 END DATE 24/01/2024
SL. Ref Document/
Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility
No Remarks

operational panel in case of emergency to be ensured

14 Returning Work  Vendor Operator and concerned MI or technician will return work permit.  Unauthorized Use  Maintenance in SS/Gen-25/29 (Work
permit)
Permit  Worm Permit is to be returned at site only. In case Operator has to leave  Equipment not in Use charge/
machine unattended, precautions to be taken to prevent un-authorized use of  Technician
machine  Contractor
 Under no circumstance is boom of machine be left erected and machine un- supervisor.
attended.

PPE’s required for this job Execution


List Of PPE’s

Safety Safety Safety Florescent CO Detector Nose Mask


Helmet Shoe Goggles Jacket FR Jacket
During Pre Start-up √ √ √ √ × × √
During On Job √ √ √ √ √ × √

Name: - Name: - Name: -


Date:- Date:- Date:-
E&P Departmental Representative/ Consultant E&P Safety Representative Working Agency / Contractor Representative
Remarks
1. 6 - direction hazards (Up/Down/Front/Back/Left/Right) of other jobs being done in close proximity have to be recorded daily and has to be discussed in the Tool Box Talk
2. Job specific SWP should be made and attached to this SWP with additional precautions for any additional activities (if any). This should be step by step including all steps.
3. The job specific SWP will be modified as and when the nature of job changes
4. Training on SWP to be given to all workmen by E&P Officer / Consultant at the start of the job and thereafter least once per year and by Contractor representative on a monthly basis. The monthly training record should be attached with
the monthly bill or Job Measurement Report.
5. Review on status of implementation shall be done through Job Cycle Check by Safety Supervisor / Consultant/ E&P Officer at least once per month
SAFE WORK PROCEDURE
E&P/ Safety/ 01 Engineering & Projects Effective Date: - 05-08-2023: Rev – 04
DEPARTMENT / PROJECT TSK_ENGINEERING & PROJECT_BF#02 DOC NO. TSK/E&P/BF#02/IRISE/MECH/SWP/001
SECTION/ SITE BF#02
JOB TITLE Operation of MEWP (Man lifter) & Personnel Handling WORK ORDER NO 3800018718
START DATE 25/10/2022 END DATE 24/01/2024
SL. Ref Document/
Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility
No Remarks

Over load sense system Emergency stop

Name: - Name: - Name: -


Date:- Date:- Date:-
E&P Departmental Representative/ Consultant E&P Safety Representative Working Agency / Contractor Representative
Remarks
1. 6 - direction hazards (Up/Down/Front/Back/Left/Right) of other jobs being done in close proximity have to be recorded daily and has to be discussed in the Tool Box Talk
2. Job specific SWP should be made and attached to this SWP with additional precautions for any additional activities (if any). This should be step by step including all steps.
3. The job specific SWP will be modified as and when the nature of job changes
4. Training on SWP to be given to all workmen by E&P Officer / Consultant at the start of the job and thereafter least once per year and by Contractor representative on a monthly basis. The monthly training record should be attached with
the monthly bill or Job Measurement Report.
5. Review on status of implementation shall be done through Job Cycle Check by Safety Supervisor / Consultant/ E&P Officer at least once per month
SAFE WORK PROCEDURE
E&P/ Safety/ 01 Engineering & Projects Effective Date: - 05-08-2023: Rev – 04
DEPARTMENT / PROJECT TSK_ENGINEERING & PROJECT_BF#02 DOC NO. TSK/E&P/BF#02/IRISE/MECH/SWP/001
SECTION/ SITE BF#02
JOB TITLE Operation of MEWP (Man lifter) & Personnel Handling WORK ORDER NO 3800018718
START DATE 25/10/2022 END DATE 24/01/2024
SL. Ref Document/
Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility
No Remarks

 This foot switch is a safety device which is there for  Emergency- Hit red button (emergency stop) immediately  The Sky guard control panel protection is to
protection, so do not abuse it. to disable machine. ensure extra safety for operators whilst using
 If there is an emergency in any situation you must  Overload system or load sense system, the platform load Boom Lifts.
release the dead man switch, and the function will sense system assesses the weight of operators and  The Sky Guard aftermarket accessory provides
then come to an immediate stop. equipment in the work platform and will only allow enhanced control panel protection for boom
 Do not put a bolt or wedge on dead man switch to machine operation if the total load is within the rated lifts. Sensor stops all functions when activated
keep it pressed. capacity of the boom. by approximately 50 lbs. of force.

 Harness lanyard anchor point.  Load holding valves, also known as  Bucket tilt sensor - A tilt sensor is an instrument that is used

Name: - Name: - Name: -


Date:- Date:- Date:-
E&P Departmental Representative/ Consultant E&P Safety Representative Working Agency / Contractor Representative
Remarks
1. 6 - direction hazards (Up/Down/Front/Back/Left/Right) of other jobs being done in close proximity have to be recorded daily and has to be discussed in the Tool Box Talk
2. Job specific SWP should be made and attached to this SWP with additional precautions for any additional activities (if any). This should be step by step including all steps.
3. The job specific SWP will be modified as and when the nature of job changes
4. Training on SWP to be given to all workmen by E&P Officer / Consultant at the start of the job and thereafter least once per year and by Contractor representative on a monthly basis. The monthly training record should be attached with
the monthly bill or Job Measurement Report.
5. Review on status of implementation shall be done through Job Cycle Check by Safety Supervisor / Consultant/ E&P Officer at least once per month
SAFE WORK PROCEDURE
E&P/ Safety/ 01 Engineering & Projects Effective Date: - 05-08-2023: Rev – 04
DEPARTMENT / PROJECT TSK_ENGINEERING & PROJECT_BF#02 DOC NO. TSK/E&P/BF#02/IRISE/MECH/SWP/001
SECTION/ SITE BF#02
JOB TITLE Operation of MEWP (Man lifter) & Personnel Handling WORK ORDER NO 3800018718
START DATE 25/10/2022 END DATE 24/01/2024
SL. Ref Document/
Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility
No Remarks

 Never clip harness lanyard around safety rail. counterbalance valves, are a small but important for measuring the tilt in multiple axes.
 Make sure other personnel working in basket have also part of any mobile machine.  Daily Check and proper maintenance to be done prior to use
fitted and properly secured their safety harnesses.  Daily Check the Load holding valve prior to use of of machine, if observed error do not operate machine.
 Do not stand on the handrails. Operator must stand
machine, if loose do not operate machine.
with both feet firmly on the platform floor, so that
he/she can see both directions (front & back) for any
hazards.

Name: - Name: - Name: -


Date:- Date:- Date:-
E&P Departmental Representative/ Consultant E&P Safety Representative Working Agency / Contractor Representative
Remarks
1. 6 - direction hazards (Up/Down/Front/Back/Left/Right) of other jobs being done in close proximity have to be recorded daily and has to be discussed in the Tool Box Talk
2. Job specific SWP should be made and attached to this SWP with additional precautions for any additional activities (if any). This should be step by step including all steps.
3. The job specific SWP will be modified as and when the nature of job changes
4. Training on SWP to be given to all workmen by E&P Officer / Consultant at the start of the job and thereafter least once per year and by Contractor representative on a monthly basis. The monthly training record should be attached with
the monthly bill or Job Measurement Report.
5. Review on status of implementation shall be done through Job Cycle Check by Safety Supervisor / Consultant/ E&P Officer at least once per month
SAFE WORK PROCEDURE
E&P/ Safety/ 01 Engineering & Projects Effective Date: - 05-08-2023: Rev – 04
DEPARTMENT / PROJECT TSK_ENGINEERING & PROJECT_BF#02 DOC NO. TSK/E&P/BF#02/IRISE/MECH/SWP/001
SECTION/ SITE BF#02
JOB TITLE Operation of MEWP (Man lifter) & Personnel Handling WORK ORDER NO 3800018718
START DATE 25/10/2022 END DATE 24/01/2024
SL. Ref Document/
Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility
No Remarks

Barricades or road marker cones are placed along side of


Used Halo Helmet while operation of MEWP OPS (Overhead Protective Structure) vehicle.

Look up and around. Make sure there are no overhead obstructions Placement area flat and able to stand weight of
machine.

Name: - Name: - Name: -


Date:- Date:- Date:-
E&P Departmental Representative/ Consultant E&P Safety Representative Working Agency / Contractor Representative
Remarks
1. 6 - direction hazards (Up/Down/Front/Back/Left/Right) of other jobs being done in close proximity have to be recorded daily and has to be discussed in the Tool Box Talk
2. Job specific SWP should be made and attached to this SWP with additional precautions for any additional activities (if any). This should be step by step including all steps.
3. The job specific SWP will be modified as and when the nature of job changes
4. Training on SWP to be given to all workmen by E&P Officer / Consultant at the start of the job and thereafter least once per year and by Contractor representative on a monthly basis. The monthly training record should be attached with
the monthly bill or Job Measurement Report.
5. Review on status of implementation shall be done through Job Cycle Check by Safety Supervisor / Consultant/ E&P Officer at least once per month
SAFE WORK PROCEDURE
E&P/ Safety/ 01 Engineering & Projects Effective Date: - 05-08-2023: Rev – 04
DEPARTMENT / PROJECT TSK_ENGINEERING & PROJECT_BF#02 DOC NO. TSK/E&P/BF#02/IRISE/MECH/SWP/001
SECTION/ SITE BF#02
JOB TITLE Operation of MEWP (Man lifter) & Personnel Handling WORK ORDER NO 3800018718
START DATE 25/10/2022 END DATE 24/01/2024
SL. Ref Document/
Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility
No Remarks

Walk-talky available with operator and rescue supervisor.  All persons on bucket will have to  Man lifter, the gate/ entry
 One rescue supervisor is compulsory near machine while machine is in anchored safety belt, sit down on bucket. point onto the carriage is to be
operation and use. locked and secured.
 Rescue supervisor present in near vicinity of machine to attend emergency

     
15 Recommendation for 1- Manlift to be operated from the cage and competent person to be deployed at Site In charge/

Name: - Name: - Name: -


Date:- Date:- Date:-
E&P Departmental Representative/ Consultant E&P Safety Representative Working Agency / Contractor Representative
Remarks
1. 6 - direction hazards (Up/Down/Front/Back/Left/Right) of other jobs being done in close proximity have to be recorded daily and has to be discussed in the Tool Box Talk
2. Job specific SWP should be made and attached to this SWP with additional precautions for any additional activities (if any). This should be step by step including all steps.
3. The job specific SWP will be modified as and when the nature of job changes
4. Training on SWP to be given to all workmen by E&P Officer / Consultant at the start of the job and thereafter least once per year and by Contractor representative on a monthly basis. The monthly training record should be attached with
the monthly bill or Job Measurement Report.
5. Review on status of implementation shall be done through Job Cycle Check by Safety Supervisor / Consultant/ E&P Officer at least once per month
SAFE WORK PROCEDURE
E&P/ Safety/ 01 Engineering & Projects Effective Date: - 05-08-2023: Rev – 04
DEPARTMENT / PROJECT TSK_ENGINEERING & PROJECT_BF#02 DOC NO. TSK/E&P/BF#02/IRISE/MECH/SWP/001
SECTION/ SITE BF#02
JOB TITLE Operation of MEWP (Man lifter) & Personnel Handling WORK ORDER NO 3800018718
START DATE 25/10/2022 END DATE 24/01/2024
SL. Ref Document/
Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility
No Remarks

Job ground level for emergency lowering of the boom. Supervisor/Safety


2- Specific job safety plan with six directional hazards identification and mitigation Professional.
plan needs to be prepared with respect to site environment Prevention from Re
3- Collaborate with competent certificate agency for strength the power access occurrence
machine operator’s certification process.
4- Both Operator and recue operator training on SWP is to be mandatory. IPAF Certification
5- Detail’s hazard analysis to be done for manlift operation where multiple structure / is mandatory for
obstruction can cause entrapment both operators.
6- Feasibility of providing full guard up to 1.8-meter height (man height), proximity
sensor, relocatable control panel in cage to be explored /studied with OEM alert or
save operator from entrapment flexible operation of the machine from cage
7- Periodic inspection checklist to be developed for emergency interlock checking and
physical inspection of machine including all safety emergency hardware.
8-Emergency rescue plan to be prepared and deployed for working at height in high
hazard area
9- Examine use of helmet equipped with sensor to alert the operators when the
operator/co passenger approaches close vicinity of any obstruction
10-Opewrator and co- worker should not carry cell phone while working at height
with man lifter but should carry working walkie talkie.
11- Halo helmet/ OPS (Overhead protective Structure) is mandatory while using
MEWP
12-The operator and Rescue Operator both should have valid Certification from
IPAF.

Name: - Name: - Name: -


Date:- Date:- Date:-
E&P Departmental Representative/ Consultant E&P Safety Representative Working Agency / Contractor Representative
Remarks
1. 6 - direction hazards (Up/Down/Front/Back/Left/Right) of other jobs being done in close proximity have to be recorded daily and has to be discussed in the Tool Box Talk
2. Job specific SWP should be made and attached to this SWP with additional precautions for any additional activities (if any). This should be step by step including all steps.
3. The job specific SWP will be modified as and when the nature of job changes
4. Training on SWP to be given to all workmen by E&P Officer / Consultant at the start of the job and thereafter least once per year and by Contractor representative on a monthly basis. The monthly training record should be attached with
the monthly bill or Job Measurement Report.
5. Review on status of implementation shall be done through Job Cycle Check by Safety Supervisor / Consultant/ E&P Officer at least once per month
SAFE WORK PROCEDURE
E&P/ Safety/ 01 Engineering & Projects Effective Date: - 05-08-2023: Rev – 04
DEPARTMENT / PROJECT TSK_ENGINEERING & PROJECT_BF#02 DOC NO. TSK/E&P/BF#02/IRISE/MECH/SWP/001
SECTION/ SITE BF#02
JOB TITLE Operation of MEWP (Man lifter) & Personnel Handling WORK ORDER NO 3800018718
START DATE 25/10/2022 END DATE 24/01/2024
SL. Ref Document/
Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility
No Remarks

Name: - Name: - Name: -


Date:- Date:- Date:-
E&P Departmental Representative/ Consultant E&P Safety Representative Working Agency / Contractor Representative
Remarks
1. 6 - direction hazards (Up/Down/Front/Back/Left/Right) of other jobs being done in close proximity have to be recorded daily and has to be discussed in the Tool Box Talk
2. Job specific SWP should be made and attached to this SWP with additional precautions for any additional activities (if any). This should be step by step including all steps.
3. The job specific SWP will be modified as and when the nature of job changes
4. Training on SWP to be given to all workmen by E&P Officer / Consultant at the start of the job and thereafter least once per year and by Contractor representative on a monthly basis. The monthly training record should be attached with
the monthly bill or Job Measurement Report.
5. Review on status of implementation shall be done through Job Cycle Check by Safety Supervisor / Consultant/ E&P Officer at least once per month