Download as pdf or txt
Download as pdf or txt
You are on page 1of 104

CENTRAL LABORATORY, BHURKUNDA

CENTRAL COALFIELDS LIMITED


(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 178 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 25/01/2024 Date of Issue of result: 01/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/14


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/178 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 22°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-NUGP by Shankar Gupta
Sample Details railway siding, F.note no. 000161
Sample ID:
QCI/COAL/CCL/NUGP/05 Authorized representative of Project / Siding

Sample analysis Start 28/01/2024 Sample Analysis End date 31/01/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.84 4.10 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.96 31.20 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4940 4979 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/178, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 179 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 25/01/2024 Date of Issue of result: 01/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/14


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/179 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 22°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-NUGP by Shankar Gupta
Sample Details railway siding, F.note no. 000167
Sample ID:
QCI/COAL/CCL/NUGP/06 Authorized representative of Project / Siding

Sample analysis Start 28/01/2024 Sample Analysis End date 31/01/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.72 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.73 30.90 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4979 5006 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/179, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 180 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 25/01/2024 Date of Issue of result: 01/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/14


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/180 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 22°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-NUGP by Shankar Gupta
Sample Details railway siding, F.note no. 000176
Sample ID:
QCI/COAL/CCL/NUGP/07 Authorized representative of Project / Siding

Sample analysis Start 28/01/2024 Sample Analysis End date 31/01/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.73 4.40 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 27.97 28.10 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5238 5256 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/180, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 181 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 28/01/2024 Date of Issue of result: 03/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/07


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/181 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Road mode,Birsa project Ramjee Ram
Sample Details Sample ID:
QCI/COAL/CCL/BIRSA/1957
Authorized representative of Project / Siding
Sample analysis Start 30/01/2024 Sample Analysis End date 02/02/2024
Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.80 4.40 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.15 30.30 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5022 5043 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/181, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 182 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 28/01/2024 Date of Issue of result: 03/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/07


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/182 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Road mode,Birsa project Ramjee Ram
Sample Details Sample ID:
QCI/COAL/CCL/BIRSA/1958
Authorized representative of Project / Siding
Sample analysis Start 30/01/2024 Sample Analysis End date 02/02/2024
Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 5.64 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 29.55 30.00 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4956 5032 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/182, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 183 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 28/01/2024 Date of Issue of result: 03/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/07


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/183 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Road mode,Birsa project Ramjee Ram
Sample Details Sample ID:
QCI/COAL/CCL/BIRSA/1959
Authorized representative of Project / Siding
Sample analysis Start 30/01/2024 Sample Analysis End date 02/02/2024
Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 5.47 4.40 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 28.55 28.90 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5075 5133 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/183, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 184 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 28/01/2024 Date of Issue of result: 03/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/07


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/184 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Road mode,Birsa project Ramjee Ram
Sample Details Sample ID:
QCI/COAL/CCL/BIRSA/1960
Authorized representative of Project / Siding
Sample analysis Start 30/01/2024 Sample Analysis End date 02/02/2024
Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.70 4.50 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 29.11 29.20 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5135 5145 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/184, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 185 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 28/01/2024 Date of Issue of result: 04/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/07


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/185 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000163
Sample ID:
JS/CCL/NUGP/ROSA/163 Authorized representative of Project / Siding

Sample analysis Start 31/01/2024 Sample Analysis End date 03/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.68 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 29.79 29.90 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5074 5099 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/185, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 186 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 28/01/2024 Date of Issue of result: 04/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/07


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/186 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000164
Sample ID:
UNI/CCL/NUGP/BIRSA/BAR Authorized representative of Project / Siding
H/164

Sample analysis Start 31/01/2024 Sample Analysis End date 03/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.65 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 29.96 30.10 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5062 5086 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/186, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 187 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 28/01/2024 Date of Issue of result: 04/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/07


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/187 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000165
Sample ID:
JS/CCL/NUGP/ROSA/165 Authorized representative of Project / Siding

Sample analysis Start 31/01/2024 Sample Analysis End date 03/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.70 4.00 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 29.82 30.00 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5068 5105 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/187, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 188 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 28/01/2024 Date of Issue of result: 04/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/07


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/188 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000165
Sample ID:
JS/CCL/NUGP/ROSA/166 Authorized representative of Project / Siding

Sample analysis Start 31/01/2024 Sample Analysis End date 03/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.57 4.10 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 31.36 31.50 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4942 4966 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/188, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 189 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 28/01/2024 Date of Issue of result: 05/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/07


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/189 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000168
Sample ID:
JS/CCL/NUGP/ROSA/168 Authorized representative of Project / Siding

Sample analysis Start 01/02/2024 Sample Analysis End date 04/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.66 4.00 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 31.15 31.40 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4948 4983 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/189, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 190 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 28/01/2024 Date of Issue of result: 05/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/07


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/190 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000169
Sample ID:
JS/CCL/NUGP/ROSA/169 Authorized representative of Project / Siding

Sample analysis Start 01/02/2024 Sample Analysis End date 04/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.54 3.90 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 29.88 30.10 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5085 5120 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/190, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 191 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 28/01/2024 Date of Issue of result: 05/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/07


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/191 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000170
Sample ID:
JS/CCL/NUGP/ROSA/170 Authorized representative of Project / Siding

Sample analysis Start 01/02/2024 Sample Analysis End date 04/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.58 4.00 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.74 30.90 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5099 5029 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/191, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 192 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 28/01/2024 Date of Issue of result: 05/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/07


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/192 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000171
Sample ID:
JS/CCL/NUGP/ROSA/171 Authorized representative of Project / Siding

Sample analysis Start 01/02/2024 Sample Analysis End date 04/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.76 4.00 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 31.10 31.30 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4939 4978 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/192, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 193 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 29/01/2024 Date of Issue of result: 06/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/15


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/193 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002464
Sample ID:
JS/SND/SDG/ROSA/G-8/20 Authorized representative of Project / Siding

Sample analysis Start 02/02/2024 Sample Analysis End date 05/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.79 4.10 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 29.85 30.10 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5052 5089 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/193, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 194 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 29/01/2024 Date of Issue of result: 06/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/15


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/194 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002464
Sample ID:
JS/SND/SDG/ROSA/G-10/20 Authorized representative of Project / Siding

Sample analysis Start 02/02/2024 Sample Analysis End date 05/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.48 4.10 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 36.15 36.30 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4504 4522 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/194, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 195 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 29/01/2024 Date of Issue of result: 06/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/15


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/195 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002465
Sample ID:
UNI/SND/SDG/NPGA/G-8/21 Authorized representative of Project / Siding

Sample analysis Start 02/02/2024 Sample Analysis End date 05/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.66 4.30 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.31 30.40 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5028 5047 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/195, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 196 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 29/01/2024 Date of Issue of result: 06/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/15


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/196 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002465
Sample ID:
UNI/SND/SDG/NPGA/G-10/21 Authorized representative of Project / Siding

Sample analysis Start 02/02/2024 Sample Analysis End date 05/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.63 4.00 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 36.19 36.40 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4478 4508 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/196, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 197 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 29/01/2024 Date of Issue of result: 07/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/15


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/197 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002466
Sample ID:
UNI/SND/SDG/MTSS/G-8/22 Authorized representative of Project / Siding

Sample analysis Start 03/02/2024 Sample Analysis End date 06/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.58 4.10 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.56 30.70 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5016 5041 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/197, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 198 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 29/01/2024 Date of Issue of result: 07/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/15


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/198 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002466
Sample ID:
UNI/SND/SDG/MTSS/G-10/22 Authorized representative of Project / Siding

Sample analysis Start 03/02/2024 Sample Analysis End date 06/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.68 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 36.69 36.90 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4424 4446 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/198, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 199 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 29/01/2024 Date of Issue of result: 07/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/15


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/199 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002467
Sample ID:
JS/SND/SDG/MJPJ/G-5/23 Authorized representative of Project / Siding

Sample analysis Start 03/02/2024 Sample Analysis End date 06/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.85 4.40 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 19.92 20.00 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5978 6006 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/199, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 200 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 29/01/2024 Date of Issue of result: 08/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/15


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/200 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002467
Sample ID:
JS/SND/SDG/MJPJ/G-10/23 Authorized representative of Project / Siding

Sample analysis Start 04/02/2024 Sample Analysis End date 07/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.68 4.10 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 36.10 36.30 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4479 4507 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/200, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 201 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 29/01/2024 Date of Issue of result: 08/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/15


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/201 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002468
Sample ID:
JS/SND/SDG/MJPJ/G-8/24 Authorized representative of Project / Siding

Sample analysis Start 04/02/2024 Sample Analysis End date 07/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.86 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 29.79 30.00 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5047 5082 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/201, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 202 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 29/01/2024 Date of Issue of result: 08/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/15


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/202 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002468
Sample ID:
JS/SND/SDG/MJPJ/G-10/24 Authorized representative of Project / Siding

Sample analysis Start 04/02/2024 Sample Analysis End date 07/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.56 4.00 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 35.88 36.10 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4518 4544 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/202, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 203 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 01/02/2024 Date of Issue of result: 09/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/08


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/203 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Road mode,Birsa project Ramjee Ram
Sample Details Sample ID:
QCI/COAL/CCL/BIRSA/1961
Authorized representative of Project / Siding
Sample analysis Start 05/02/2024 Sample Analysis End date 08/02/2024
Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 5.56 4.50 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 29.14 29.50 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5007 5063 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/203, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 204 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 01/02/2024 Date of Issue of result: 09/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/08


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/204 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Road mode,Birsa project Ramjee Ram
Sample Details Sample ID:
QCI/COAL/CCL/BIRSA/1962
Authorized representative of Project / Siding
Sample analysis Start 05/02/2024 Sample Analysis End date 08/02/2024
Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 5.56 4.40 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 27.12 27.50 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5197 5261 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/204, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 205 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 01/02/2024 Date of Issue of result: 09/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/08


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/205 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Road mode,Birsa project Ramjee Ram
Sample Details Sample ID:
QCI/COAL/CCL/BIRSA/1963
Authorized representative of Project / Siding
Sample analysis Start 05/02/2024 Sample Analysis End date 08/02/2024
Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 5.14 4.60 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 28.23 28.40 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5153 5183 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/205, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 206 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 01/02/2024 Date of Issue of result: 09/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/08


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/206 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Road mode,Birsa project Ramjee Ram
Sample Details Sample ID:
QCI/COAL/CCL/BIRSA/1964
Authorized representative of Project / Siding
Sample analysis Start 05/02/2024 Sample Analysis End date 08/02/2024
Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 5.23 4.60 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 27.35 27.50 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5223 5258 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/206, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 207 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 01/02/2024 Date of Issue of result: 10/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/16


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/207 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002479
Sample ID:
UNI/SND/SDG/BARH/G-8/34 Authorized representative of Project / Siding

Sample analysis Start 06/02/2024 Sample Analysis End date 09/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.62 4.10 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.11 30.30 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5052 5080 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/207, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 208 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 01/02/2024 Date of Issue of result: 10/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/16


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/208 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002479
Sample ID:
UNI/SND/SDG/BARH/G-10/34 Authorized representative of Project / Siding

Sample analysis Start 06/02/2024 Sample Analysis End date 09/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.62 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 36.45 36.60 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4455 4475 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/208, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 209 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 01/02/2024 Date of Issue of result: 10/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/16


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/209 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002480
Sample ID:
UNI/SND/SDG/BARH/G-5/35 Authorized representative of Project / Siding

Sample analysis Start 06/02/2024 Sample Analysis End date 09/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.64 4.30 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 21.04 21.10 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5903 5924 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/209, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 210 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 01/02/2024 Date of Issue of result: 10/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/16


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/210 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002480
Sample ID:
UNI/SND/SDG/BARH/G-8/35 Authorized representative of Project / Siding

Sample analysis Start 06/02/2024 Sample Analysis End date 09/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.54 3.70 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 31.21 31.50 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4960 5004 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/210, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 211 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 01/02/2024 Date of Issue of result: 10/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/16


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/211 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002480
Sample ID:
UNI/SND/SDG/BARH/G-10/35 Authorized representative of Project / Siding

Sample analysis Start 06/02/2024 Sample Analysis End date 09/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.61 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 36.86 37.00 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4418 4437 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/211, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 212 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 01/02/2024 Date of Issue of result: 11/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/16


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/212 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002481
Sample ID:
JS/SND/SDG/MJPJ/G-5/36 Authorized representative of Project / Siding

Sample analysis Start 07/02/2024 Sample Analysis End date 10/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.70 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 20.65 20.80 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5931 5962 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/212, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 213 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 01/02/2024 Date of Issue of result: 11/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/16


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/213 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002481
Sample ID:
JS/SND/SDG/MJPJ/G-8/36 Authorized representative of Project / Siding

Sample analysis Start 07/02/2024 Sample Analysis End date 10/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.86 4.10 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.12 30.40 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5016 5056 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/213, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 214 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 01/02/2024 Date of Issue of result: 11/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/16


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/214 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002481
Sample ID:
JS/SND/SDG/MJPJ/G-10/36 Authorized representative of Project / Siding

Sample analysis Start 07/02/2024 Sample Analysis End date 10/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.68 4.00 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 37.15 37.40 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4381 4412 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/214, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 215 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 01/02/2024 Date of Issue of result: 11/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/16


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/215 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002482
Sample ID:
UNI/SND/SDG/MIGK/G-8/37 Authorized representative of Project / Siding

Sample analysis Start 07/02/2024 Sample Analysis End date 10/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.58 3.80 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 31.12 31.40 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4963 5003 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/215, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 216 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 01/02/2024 Date of Issue of result: 11/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/16


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/216 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002482
Sample ID:
UNI/SND/SDG/MIGK/G-10/37 Authorized representative of Project / Siding

Sample analysis Start 07/02/2024 Sample Analysis End date 10/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.57 3.90 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 37.05 37.30 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4406 4437 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/216, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 217 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 02/02/2024 Date of Issue of result: 12/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/09


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/217 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000187
Sample ID:
UNI/CCL/NUGP/BIRSA/MMM Authorized representative of Project / Siding
T/187

Sample analysis Start 08/02/2024 Sample Analysis End date 11/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.55 3.90 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.96 31.20 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4982 5016 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/217, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 218 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 02/02/2024 Date of Issue of result: 12/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/09


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/218 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000188
Sample ID:
UNI/CCL/NUGP/BIRSA/UCR/ Authorized representative of Project / Siding
188

Sample analysis Start 08/02/2024 Sample Analysis End date 11/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.56 4.10 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.42 30.60 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5032 5056 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/218, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 219 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 02/02/2024 Date of Issue of result: 12/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/09


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/219 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000189
Sample ID:
JS/CCL/NUGP/ROSA/189 Authorized representative of Project / Siding

Sample analysis Start 08/02/2024 Sample Analysis End date 11/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.55 4.00 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 31.08 31.30 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4971 5000 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/219, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 220 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 02/02/2024 Date of Issue of result: 12/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/09


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/220 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000190
Sample ID:
UNI/CCL/NUGP/BIRSA/HCJ/1 Authorized representative of Project / Siding
90

Sample analysis Start 08/02/2024 Sample Analysis End date 11/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.58 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.28 30.40 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5042 5062 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/220, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 221 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 02/02/2024 Date of Issue of result: 13/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/09


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/221 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000192
Sample ID:
JS/CCL/NUGP/MJPJ/192 Authorized representative of Project / Siding

Sample analysis Start 09/02/2024 Sample Analysis End date 12/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.78 4.10 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.25 30.50 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5116 5052 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/221, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 222 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 02/02/2024 Date of Issue of result: 13/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/09


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/222 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000193
Sample ID:
UNI/CCL/NUGP/BIRSA/MTSS Authorized representative of Project / Siding
/193

Sample analysis Start 09/02/2024 Sample Analysis End date 12/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.63 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 39.92 30.10 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5069 5092 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/222, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 223 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 02/02/2024 Date of Issue of result: 13/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/09


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/223 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000194
Sample ID:
UNI/CCL/NUGP/BIRSA/HCJ/1 Authorized representative of Project / Siding
94

Sample analysis Start 09/02/2024 Sample Analysis End date 12/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.57 3.80 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 31.12 31.40 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4964 5004 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/223, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 224 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 02/02/2024 Date of Issue of result: 13/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/09


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/224 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000195
Sample ID:
UNI/CCL/NUGP/BIRSA/HCJ/1 Authorized representative of Project / Siding
95

Sample analysis Start 09/02/2024 Sample Analysis End date 12/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.58 3.90 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.44 30.70 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5027 5063 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/224, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 225 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 02/02/2024 Date of Issue of result: 14/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/09


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/225 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000196
Sample ID:
UNI/CCL/NUGP/BIRSA/MTSS Authorized representative of Project / Siding
/196

Sample analysis Start 10/02/2024 Sample Analysis End date 13/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.52 4.00 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.15 30.30 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5063 5091 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/225, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 226 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 02/02/2024 Date of Issue of result: 14/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/09


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/226 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 25°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000197
Sample ID:
JS/CCL/NUGP/ROSA/197 Authorized representative of Project / Siding

Sample analysis Start 10/02/2024 Sample Analysis End date 13/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.89 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.46 30.70 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4980 5016 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/226, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 227 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 02/02/2024 Date of Issue of result: 14/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/09


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/227 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 25°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000198
Sample ID:
JS/CCL/NUGP/MJPJ/198 Authorized representative of Project / Siding

Sample analysis Start 10/02/2024 Sample Analysis End date 13/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 5.16 4.30 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 29.39 29.70 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5041 5087 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/227, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 228 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 03/02/2024 Date of Issue of result: 14/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/17


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/228 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 25°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Road mode,Urimari project by Deepak Roy
Sample Details Sample ID:
QCI/COAL/CCL/URMI/753
Authorized representative of Project / Siding
Sample analysis Start 10/02/2024 Sample Analysis End date 13/02/2024
Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.42 4.10 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 29.50 29.60 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5139 5156 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/228, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 229 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 03/02/2024 Date of Issue of result: 15/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/17


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/229 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 25°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Road mode,Urimari project by Deepak Roy
Sample Details Sample ID:
QCI/COAL/CCL/URMI/754
Authorized representative of Project / Siding
Sample analysis Start 11/02/2024 Sample Analysis End date 14/02/2024
Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.08 3.80 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 27.12 27.20 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5412 5428 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/229, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 230 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 03/02/2024 Date of Issue of result: 15/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/17


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/230 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 25°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Road mode,Urimari project by Deepak Roy
Sample Details Sample ID:
QCI/COAL/CCL/URMI/755
Authorized representative of Project / Siding
Sample analysis Start 11/02/2024 Sample Analysis End date 14/02/2024
Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.12 3.80 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 27.11 27.20 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5407 5425 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/230, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 231 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 05/02/2024 Date of Issue of result: 15/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/18


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/231 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 25°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002487
Sample ID:
UNI/SND/SDG/UCR/42 Authorized representative of Project / Siding

Sample analysis Start 11/02/2024 Sample Analysis End date 14/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.58 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 31.18 31.30 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4957 4977 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/231, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 232 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 05/02/2024 Date of Issue of result: 15/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/18


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/232 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 25°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002487
Sample ID:
UNI/SND/SDG/UCR/42 Authorized representative of Project / Siding

Sample analysis Start 11/02/2024 Sample Analysis End date 14/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.35 3.90 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 37.10 37.30 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4433 4454 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/232, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 233 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 05/02/2024 Date of Issue of result: 16/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/18


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/233 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 25°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002488
Sample ID:
UNI/SND/SDG/MMMT/43 Authorized representative of Project / Siding

Sample analysis Start 12/02/2024 Sample Analysis End date 15/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.71 4.40 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.35 30.40 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5016 5033 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/233, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 234 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 05/02/2024 Date of Issue of result: 16/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/18


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/234 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002488
Sample ID:
UNI/SND/SDG/MMMT/43 Authorized representative of Project / Siding

Sample analysis Start 12/02/2024 Sample Analysis End date 15/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.57 4.10 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 36.59 36.80 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4449 4471 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/234, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 235 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 05/02/2024 Date of Issue of result: 16/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/18


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/235 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002489
Sample ID:
UNI/SND/SDG/UCR/44 Authorized representative of Project / Siding

Sample analysis Start 12/02/2024 Sample Analysis End date 15/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.81 4.30 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.42 30.60 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4995 5022 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/235, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 236 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 05/02/2024 Date of Issue of result: 16/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/18


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/236 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002489
Sample ID:
UNI/SND/SDG/UCR/44 Authorized representative of Project / Siding

Sample analysis Start 12/02/2024 Sample Analysis End date 15/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.56 4.10 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 36.28 36.50 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4480 4502 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/236, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 237 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 05/02/2024 Date of Issue of result: 17/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/18


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/237 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002491
Sample ID:
UNI/SND/SDG/UCR/45 Authorized representative of Project / Siding

Sample analysis Start 13/02/2024 Sample Analysis End date 16/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.62 4.00 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 31.38 31.60 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4933 4965 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/237, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 238 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 05/02/2024 Date of Issue of result: 17/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/18


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/238 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002491
Sample ID:
UNI/SND/SDG/UCR/45 Authorized representative of Project / Siding

Sample analysis Start 13/02/2024 Sample Analysis End date 16/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.67 4.10 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 35.98 36.20 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4492 4519 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/238, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 239 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 05/02/2024 Date of Issue of result: 17/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/18


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/239 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Deepak Roy
Sample Details railway siding, F.note no. 002491
Sample ID:
JS/SND/SDG/NPSB/47 Authorized representative of Project / Siding

Sample analysis Start 13/02/2024 Sample Analysis End date 16/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.46 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 20.43 30.50 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5045 5059 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/239, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 240 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 10/02/2024 Date of Issue of result: 18/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : GDC/QUALITY/2023-24/99


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/240 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : Quality Incharge
Road mode ,Giddi-C Colliery Giddi-C colliery
Sample Details Sample ID:
QCI/COAL/CCL/GIDDI-C/822
Authorized representative of Project / Siding
Sample analysis Start 14/02/2024 Sample Analysis End date 17/02/2024
Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.44 4.27 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 39.11 39.18 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4241 4249 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/240, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 241 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 10/02/2024 Date of Issue of result: 18/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : GDC/QUALITY/2023-24/99


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/241 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : Quality Incharge
Road mode ,Giddi-C Colliery Giddi-C colliery
Sample Details Sample ID:
QCI/COAL/CCL/GIDDI-C/823
Authorized representative of Project / Siding
Sample analysis Start 14/02/2024 Sample Analysis End date 17/02/2024
Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.56 3.94 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 39.20 39.45 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4244 4272 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/241, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 242 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 10/02/2024 Date of Issue of result: 18/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : GDC/QUALITY/2023-24/99


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/242 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : Quality Incharge
Road mode ,Giddi-C Colliery Giddi-C colliery
Sample Details Sample ID:
QCI/COAL/CCL/GIDDI-C/824
Authorized representative of Project / Siding
Sample analysis Start 14/02/2024 Sample Analysis End date 17/02/2024
Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.63 4.07 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 38.82 39.05 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4266 4291 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/242, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 243 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 10/02/2024 Date of Issue of result: 18/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : GDC/QUALITY/2023-24/99


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/243 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : Quality Incharge
Road mode ,Giddi-C Colliery Giddi-C colliery
Sample Details Sample ID:
QCI/COAL/CCL/GIDDI-C/825
Authorized representative of Project / Siding
Sample analysis Start 14/02/2024 Sample Analysis End date 17/02/2024
Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.51 4.21 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 39.43 39.55 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4210 4233 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/243, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 244 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 15/02/2024 Date of Issue of result: 20/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/10


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/244 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Road mode,Birsa project Ramjee Ram
Sample Details Sample ID:
QCI/COAL/CCL/NUGP/BIRP/
10 Authorized representative of Project / Siding

Sample analysis Start 16/02/2024 Sample Analysis End date 19/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 5.59 4.60 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 27.77 28.10 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5131 5185 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/244, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 245 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 15/02/2024 Date of Issue of result: 20/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/10


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/245 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Road mode,Birsa project Ramjee Ram
Sample Details Sample ID:
QCI/COAL/CCL/NUGP/PTJT/
11 Authorized representative of Project / Siding

Sample analysis Start 16/02/2024 Sample Analysis End date 19/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 5.07 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 28.09 28.30 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5177 5224 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/245, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 246 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 15/02/2024 Date of Issue of result: 20/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/10


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/246 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Road mode,Birsa project Ramjee Ram
Sample Details Sample ID:
QCI/COAL/CCL/NUGP/BIRP/
12 Authorized representative of Project / Siding

Sample analysis Start 16/02/2024 Sample Analysis End date 19/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 5.25 4.30 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 29.11 29.40 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5055 5105 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/246, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 247 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 18/02/2024 Date of Issue of result: 23/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/11


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/247 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000226
Sample ID:
QCI/COAL/CCL/NUGP/13 Authorized representative of Project / Siding

Sample analysis Start 19/02/2024 Sample Analysis End date 22/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 5.29 4.40 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 27.90 28.20 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5163 5222 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/247, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 248 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 18/02/2024 Date of Issue of result: 23/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/11


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/248 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24.5°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000229
Sample ID:
QCI/COAL/CCL/NUGP/14 Authorized representative of Project / Siding

Sample analysis Start 19/02/2024 Sample Analysis End date 22/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 5.00 4.70 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 27.20 27.30 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5271 5288 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/248, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 249 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 21/02/2024 Date of Issue of result: 26/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/12


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/249 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24.5°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000232
Sample ID:
QCI/COAL/CCL/NUGP/PTJT/ Authorized representative of Project / Siding
15

Sample analysis Start 22/02/2024 Sample Analysis End date 25/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 5.49 4.50 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 27.06 27.30 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5213 5267 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/249, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 250 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 21/02/2024 Date of Issue of result: 26/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/12


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/250 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24.5°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Road mode,Birsa project Ramjee Ram
Sample Details Sample ID: MSK/CO/WES-
2023/HA6H1N
Authorized representative of Project / Siding
Sample analysis Start 22/02/2024 Sample Analysis End date 25/02/2024
Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 5.16 4.30 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 29.10 29.40 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5069 5115 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/250, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 251 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 21/02/2024 Date of Issue of result: 26/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/12


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/251 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24.5°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Road mode,Birsa project Ramjee Ram
Sample Details Sample ID: MSK/CO/WES-
2023/5CT61M
Authorized representative of Project / Siding
Sample analysis Start 22/02/2024 Sample Analysis End date 25/02/2024
Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.68 3.90 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 29.36 29.60 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5114 5156 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/251, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 252 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 21/02/2024 Date of Issue of result: 26/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/19


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/252 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24.5°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002493
Sample ID:
UNI/SND/SDG/MIGK/001 Authorized representative of Project / Siding

Sample analysis Start 22/02/2024 Sample Analysis End date 25/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.58 4.00 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.22 30.40 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5048 5078 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/252, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 253 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 21/02/2024 Date of Issue of result: 26/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/19


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/253 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24.5°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002493
Sample ID:
UNI/SND/SDG/MIGK/001 Authorized representative of Project / Siding

Sample analysis Start 22/02/2024 Sample Analysis End date 25/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.40 3.80 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 36.97 37.20 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4438 4466 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/253, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 254 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 21/02/2024 Date of Issue of result: 26/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/19


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/254 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24.5°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002494
Sample ID:
UNI/SND/SDG/MTSS/002 Authorized representative of Project / Siding

Sample analysis Start 22/02/2024 Sample Analysis End date 25/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.67 4.10 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 29.48 29.70 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5104 5135 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/254, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 255 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 21/02/2024 Date of Issue of result: 26/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/19


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/255 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24.5°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002494
Sample ID:
UNI/SND/SDG/MTSS/002 Authorized representative of Project / Siding

Sample analysis Start 22/02/2024 Sample Analysis End date 25/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.71 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 37.24 37.40 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4368 4391 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/255, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 256 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 21/02/2024 Date of Issue of result: 26/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/19


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/256 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002495
Sample ID:
JS/SND/SDG/NPSB/003 Authorized representative of Project / Siding

Sample analysis Start 22/02/2024 Sample Analysis End date 25/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.64 4.00 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 21.22 21.40 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5886 5926 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/256, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 257 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 21/02/2024 Date of Issue of result: 26/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/19


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/257 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 23°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002495
Sample ID:
JS/SND/SDG/NPSB/003 Authorized representative of Project / Siding

Sample analysis Start 22/02/2024 Sample Analysis End date 25/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.58 4.10 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 29.18 29.30 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5146 5171 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/257, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 258 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 21/02/2024 Date of Issue of result: 26/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/19


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/258 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002496
Sample ID:
UNI/SND/SDG/MTSS/004 Authorized representative of Project / Siding

Sample analysis Start 22/02/2024 Sample Analysis End date 25/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.62 4.00 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 33.85 34.10 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4700 4731 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/258, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 259 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 23/02/2024 Date of Issue of result: 28/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/20


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/259 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002507
Sample ID:
UNI/SND/SDG/NBCC/015 Authorized representative of Project / Siding

Sample analysis Start 24/02/2024 Sample Analysis End date 27/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.72 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.66 30.80 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4986 5013 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/259, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 260 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 23/02/2024 Date of Issue of result: 28/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/20


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/260 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002507
Sample ID:
UNI/SND/SDG/NBCC/015 Authorized representative of Project / Siding

Sample analysis Start 24/02/2024 Sample Analysis End date 27/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.66 4.00 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 33.46 33.70 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4731 4764 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/260, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 261 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 23/02/2024 Date of Issue of result: 28/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/20


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/261 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002508
Sample ID:
UNI/SND/SDG/TANDA/016 Authorized representative of Project / Siding

Sample analysis Start 24/02/2024 Sample Analysis End date 27/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.64 4.10 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.08 30.30 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5052 5081 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/261, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 262 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 23/02/2024 Date of Issue of result: 28/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/20


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/262 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002508
Sample ID:
UNI/SND/SDG/TANDA/016 Authorized representative of Project / Siding

Sample analysis Start 24/02/2024 Sample Analysis End date 27/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.50 4.00 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 33.43 33.60 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4757 4782 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/262, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 263 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 23/02/2024 Date of Issue of result: 28/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/20


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/263 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002509
Sample ID:
UNI/SND/SDG/MMMT/017 Authorized representative of Project / Siding

Sample analysis Start 24/02/2024 Sample Analysis End date 27/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.62 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.12 30.30 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5051 5074 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/263, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 264 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 23/02/2024 Date of Issue of result: 28/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/20


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/264 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002509
Sample ID:
UNI/SND/SDG/MMMT/017 Authorized representative of Project / Siding

Sample analysis Start 24/02/2024 Sample Analysis End date 27/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.60 4.10 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 33.56 33.70 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4730 4755 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/264, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 265 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 23/02/2024 Date of Issue of result: 28/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/20


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/265 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002510
Sample ID:
UNI/SND/SDG/HGJ/018 Authorized representative of Project / Siding

Sample analysis Start 24/02/2024 Sample Analysis End date 27/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.80 4.30 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 20.72 20.80 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5910 5941 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/265, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 266 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 23/02/2024 Date of Issue of result: 28/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/20


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/266 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002510
Sample ID:
UNI/SND/SDG/HGJ/018 Authorized representative of Project / Siding

Sample analysis Start 24/02/2024 Sample Analysis End date 27/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.75 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 29.86 30.00 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5057 5086 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/266, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 267 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 23/02/2024 Date of Issue of result: 28/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/20


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/267 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002510
Sample ID:
UNI/SND/SDG/HGJ/018 Authorized representative of Project / Siding

Sample analysis Start 24/02/2024 Sample Analysis End date 27/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.28 3.80 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 33.70 33.90 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4764 4788 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/267, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 268 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 24/02/2024 Date of Issue of result: 29/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/21


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/268 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002515
Sample ID:
UNI/SND/SDG/DER/023 Authorized representative of Project / Siding

Sample analysis Start 25/02/2024 Sample Analysis End date 28/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.98 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 19.88 20.00 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5963 6012 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/268, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 269 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 24/02/2024 Date of Issue of result: 29/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/21


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/269 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 24°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002515
Sample ID:
UNI/SND/SDG/DER/023 Authorized representative of Project / Siding

Sample analysis Start 25/02/2024 Sample Analysis End date 28/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.52 4.00 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.38 30.50 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5041 5069 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/269, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 270 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 24/02/2024 Date of Issue of result: 29/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/21


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/270 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 25°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002515
Sample ID:
UNI/SND/SDG/DER/023 Authorized representative of Project / Siding

Sample analysis Start 25/02/2024 Sample Analysis End date 28/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.65 4.10 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 34.08 34.30 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4674 4701 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/270, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 271 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 24/02/2024 Date of Issue of result: 29/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/21


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/271 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 25°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002516
Sample ID:
UNI/SND/SDG/DER/024 Authorized representative of Project / Siding

Sample analysis Start 25/02/2024 Sample Analysis End date 28/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.61 4.30 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 20.89 21.00 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5922 5941 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/271, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 272 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 24/02/2024 Date of Issue of result: 29/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/21


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/272 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 25°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002516
Sample ID:
UNI/SND/SDG/DER/024 Authorized representative of Project / Siding

Sample analysis Start 25/02/2024 Sample Analysis End date 28/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.82 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 33.55 33.80 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4699 4730 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/272, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 273 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 24/02/2024 Date of Issue of result: 29/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/21


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/273 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 25°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002517
Sample ID:
UNI/SND/SDG/HGJ/025 Authorized representative of Project / Siding

Sample analysis Start 25/02/2024 Sample Analysis End date 28/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.89 4.40 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 19.67 19.80 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5996 6027 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/273, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 274 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 24/02/2024 Date of Issue of result: 29/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/21


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/274 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 25°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002517
Sample ID:
UNI/SND/SDG/HGJ/025 Authorized representative of Project / Siding

Sample analysis Start 25/02/2024 Sample Analysis End date 28/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.57 4.30 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 30.88 31.00 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4987 5001 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/274, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 275 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 24/02/2024 Date of Issue of result: 29/02/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/21


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/275 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 25°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002517
Sample ID:
UNI/SND/SDG/HGJ/025 Authorized representative of Project / Siding

Sample analysis Start 25/02/2024 Sample Analysis End date 28/02/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.75 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 33.58 33.80 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4707 4734 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/275, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 276 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 26/02/2024 Date of Issue of result: 02/03/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/13


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/276 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 25°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 000248
Sample ID:
QCI/COAL/CCL/NUGP/16 Authorized representative of Project / Siding

Sample analysis Start 27/02/2024 Sample Analysis End date 01/03/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 5.35 4.30 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 27.39 27.70 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5202 5260 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/276, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 277 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 27/02/2024 Date of Issue of result: 03/03/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/22


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/277 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 25°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Road mode,Urimari project by Shankar Gupta
Sample Details Sample ID:
QCI/COAL/CCL/URMI/756
Authorized representative of Project / Siding
Sample analysis Start 28/02/2024 Sample Analysis End date 02/03/2024
Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.48 3.70 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 26.62 26.80 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5401 5445 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/277, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 278 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 27/02/2024 Date of Issue of result: 03/03/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/SND/SIDING/2024/22


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/278 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 25°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Saunda B Siding
Rake sample,Source-Saunda by Shankar Gupta
Sample Details railway siding, F.note no. 002529
Sample ID:
QCI/COAL/CCL/SDAB/612 Authorized representative of Project / Siding

Sample analysis Start 28/02/2024 Sample Analysis End date 02/03/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.45 3.90 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 36.42 36.60 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 4483 4509 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/278, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 279 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 29/02/2024 Date of Issue of result: 05/03/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/14


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/279 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 25°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Road mode,Birsa project Ramjee Ram
Sample Details Sample ID:
MSK/CO/WES/23/7A4TIL
Authorized representative of Project / Siding
Sample analysis Start 01/03/2024 Sample Analysis End date 04/03/2024
Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.61 4.10 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 29.85 30.00 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5078 5105 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : LEELA KUMARI Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/279, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 280 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 29/02/2024 Date of Issue of result: 05/03/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. : CCL/BP/NUGP/SIDING/2024/14


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/280 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 25°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Road mode,Birsa project Ramjee Ram
Sample Details Sample ID:
MSK/CO/WES/23/56NW19
Authorized representative of Project / Siding
Sample analysis Start 01/03/2024 Sample Analysis End date 04/03/2024
Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 4.85 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 29.17 29.40 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5107 5142 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/280, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00
CENTRAL LABORATORY, BHURKUNDA
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
Barkasayal Area - 829135,
Website HTTP: //centralcoalfields.in

TEST REPORT :
Test Report No. : 281 Testing Site : Permanent (at laboratory) Report Type: Original
Date of receipt of 02/03/2024 Date of Issue of result: 07/03/2024
sample
Customer Details AQMO, Barkasayal Area

Customer Request/letter ref. No. :


DETAILS OF SAMPLE :
Lab ID CLB/2023-24/281 Material : Coal Sample Approx. 300g coal
Material Condition Sealed plastic bag with signed ID Laboratory Temperature at 25°C
tag attached. time of analysis
Sample particulars : Sample Collected & deposited by : T.I Birsa Project by
Rake sample,Source-NUGP Ramjee Ram
Sample Details railway siding, F.note no. 002561
Sample ID:
QCI/COAL/CCL/NUGP/17 Authorized representative of Project / Siding

Sample analysis Start 03/03/2024 Sample Analysis End date 06/03/2024


Date
: TEST RESULTS:
Discipline/ Group :- Chemical/ Solid Fuels Material: - Chemical
S. Test Parameter Unit of Analysis Analysis Deviati Statement of
No. Measurement Result Result Test Method on from Conformity
(ADB) (EQB at Reference test
40oC & method,
60%RH) if any
1 Moisture % by mass 5.21 4.20 IS: 1350 (Part-1) --
Content : 1984
2 Ash Content % by mass 28.75 29.10 IS: 1350 (Part-1) --
: 1984 Not
3 Volatile Matter % by mass IS: 1350 (Part-1) -- Applicable
: 1984
4 Total Moisture % by mass - - IS: 1350 (Part-1) --
: 1984
5 Gross Calorific Kcal/kg 5094 5149 IS: 1350 (Part-2) --
Value (GCV) : 2022
Declarations:-
a. Samples will be destroyed after 30 (thirty) days from the date of issue of original test report
b. Test samples, ground to pass through 212-micron sieve are prepared by laboratory.
c. Test results relate to sample received at Area Quality Laboratory, Kuju Area only, or sampled for testing as per
applicable parameters.
d. Sampling at source/mine was not done by laboratory.
e. Test Report(s) shall not be reproduced except in full without approval of the laboratory, can provide assurance that
parts of a report are not taken out of context.

Reviewed By: Authorized Signatory:-


Name : T.K.KINDOO Name : SEEMA KUMARI
Designation :CHEMIST Designation :- SR. CHEMIST

*** END OF TEST REPORT ***


Doc. No. CLB/TR/2023-24/281, Issue 01, Issue Dt. , Amend No. 00, Amend. Date : 00

You might also like