ENCO-JSA-01-Piping - Cold
ENCO-JSA-01-Piping - Cold
JSA No 22EGOM-ENCO-JSA-01
EPC-3 Offsite facilities project, Duqm Refinery JSA Creation Date 09.11.2021
Job Safety Analyses Revision No 01
Revision Date 03.07.2022
Scope- Fire water pipe lines Installation works Completed By Iftikhar Malik
Trailer by using Crane/Boom Truck Only pre-mob inspected trailers are allowed to enter the site. Site Engineer
(simple lift) Ensure the load secured properly by lashing prior to shifting. Supervisor
Follow specific instructions for handling of rotary & skid
equipment supplied by the manufacturer. Foreman
Regular inspect ion & maintenance of equipment to ensure its Banksman
safe working condition HSER
Defective Lifting appliances shall have a current valid Inspection ITP Test
equipment/Lifting tackle. certificate.
Riggers must be trained and certified by third party trainer
Use only TP certified & color-coded lifting tackles.
Ensure operator checks /inspection prior to use.
Follow specific instructions for handling of rotary & skid
equipment supplied by the manufacturer.
Ensure Approved MS, JSA, PTW and Lifting plan shall be available
on site with performing authority.
Lifting Supervisor shall be presence during this activity.
Ensure HSE coverage during lifting activity.
Spillage Regular inspection & maintenance of equipment to ensure its
safe working condition.
Misuse / Incorrect Ensure availability of competent personnel for lifting operations.
Operation Operator shall be trained & authorized – possessing relevant
operating permit.
Provision of an authorized Rigger.
Operator to follow the signals of Rigger.
Abrupt movements Load shall be moved I slewed slowly & cautiously.
Do not drop the load; bring down & place slowly at unloading
point.
Be watchful & cautious of the presence of objects, vehicle,
equipment, etc., in the surroundings while moving the load.
Operator to follow the signals of Rigger.
Loading balance due to Crane operations shall only be carried out on level & even
uneven ground / wrong ground, away from the edges of pits/slopes.
positioning Check & confirm the suitability of crane positioning that will
provide balanced & safe lift and position the vehicle being loaded
within safe reach & man oeuvre.
Ensure stability of the equipment by properly positioning the
outriggers.
Load shall be securely fastened to provide a balanced lift without
causing imbalance.
Improper extension of Above 20 ton shall submit the lifting plan to SAIPEM for approval
outrigger lead to crane Area shall be properly barricaded and signposted
toppling Keep access unobstructed for free movements
Failure of lifting tools and Supervisor shall ensure availability of competent
tackles banksman/rigger
Loading and Unloading Proper compaction should be ensured before placing the crane
Unsafe rigging practices Check for any underground utilities before placing the crane
resulting to occupational Visual inspection has to be conducted by crane operator and
injuries like hit, struck by, lifting supervisor prior to lifting operation
fall, caught in between, Operator having valid resident license & assessment third party
etc. certificate
Inadequate usage of Out rigger of the carne fully extends and out rigger pad in place.
temporary lifting hook and Crane manufacture instruction shall be followed
support Good communication with operator and rigger.
Fall of material Never lift a load that exceeds 75% of the load chart capacity of
the crane
Check the wind velocity and ground stability of the crane
Check for any underground utilities before placing the crane
Proper compaction should be ensured before placing the crane
Only authorized Third Party certified / trained riggers are allowed
to perform rigging activity
Area needs to be barricaded and proper signs need to be placed.
All lifting tackles must have a valid third-party certification and
inspected and color coded.
Visual inspection has to be conducted for all the lifting tools and
tackles by lifting supervisor prior to lifting operation.
Rigging equipment shall not be used on loads greater than its
capacity.
All lifting tackles shall be kept in proper storage before and after
use
Any tools found with damages have to be discarded from the
service immediately
Do not stand anyone on the truck during material unloading
Use two tag line for supporting of the load
Area should be barricaded and provide proper sign board
Do not stand anyone under the suspended load
Do not lift bulk of material at a time
Ensure loads are secured properly
Wear proper PPE
Lifting radius is cleared from any ground or overhead
ENCO-Job Safety Analysis Page 5 of 11
Company Encogroup
JSA No 22EGOM-ENCO-JSA-01
EPC-3 Offsite facilities project, Duqm Refinery JSA Creation Date 09.11.2021
Job Safety Analyses Revision No 01
Revision Date 03.07.2022
Scope- Fire water pipe lines Installation works Completed By Iftikhar Malik
08 Hand and Power tools Defective tools Ensure hand power tools inspected by competent person and Site Supervisor/Foreman
Noise color coded Store In-charge
Personal injury Defective material removes from the site. HSER
Replacing disc on grinder Always keep access ways free of loose materials, tools and
unit equipment.
Maintain good housekeeping and proper material management.
Extension cords shall be equipped with GFCI.
Use correct PPE such as flame-resistant gloves and apron, full
face shield, safety glass, safety shoes and other required PPE.
Double insulated tools will be used
Ensure power cables inspected and color coded
Elevate cables properly and must not pose obstruction on any
work location
Ensure grinders are inspected and color coded.
Handle and guard in place
Use only the correct type of cutting and grinding discs. Ensure
RPM on disc is not less than RPM on grinders
Only trained and experienced personnel will use power tools
When changing of cutting and grinding disc ensure grinders is
unplugged or disconnected to the power source
Angle grinding machine having dead man switch
Must have a standby fire extinguisher
09 Pre assembly of pipe lines at the Improper handling of Proper manual handling technique Site Engineer
ground level materials Do not block with access and egress Supervisor/Foreman
In proper access and Cable management should be done at all time of work location HSE Advisor
egress Ensure all the electrical equipment inspection done by
Improper stacking competent person
Electric shock Combustible material shall be remove from the work location
Burns Inspect and color code all the Lifting tools and tackles
Slip and trip Ensure adequate pipe support stand available ground level pipe
Inadequate tack welding keeping purpose
Wear adequate PPE at all times.
Ensure the pipe fit-up tack welding done by competent person
and welding should be strong to prevent fall of pipe.
Do not use any improvised tools
10 Man Lift operation Defective equipment Equipment’s should be inspected by SAIPEM Safety department Site Engineer/Supervisor
Toppling of MEWP prior to start the activity. TPI Certification is required Foreman
Over Load Prestart use inspection of checklist to be followed by operator HSER
Fall from height Operator training assessment should be done by third party
Damage to property Workers hoisted on man lift wear full body harness with double
ENCO-Job Safety Analysis Page 7 of 11
Company Encogroup
JSA No 22EGOM-ENCO-JSA-01
EPC-3 Offsite facilities project, Duqm Refinery JSA Creation Date 09.11.2021
Job Safety Analyses Revision No 01
Revision Date 03.07.2022
Scope- Fire water pipe lines Installation works Completed By Iftikhar Malik
Improper access and Ensure the bolt tightening machines are inspected by competent Foreman
egress person HSER
Wear ear protection ear plug /earmuff
All the bolts should be collected in the box
Proper access to be made
Secure all hand tools with rope ties
Only trained people allowed to bolt torquing activity.
13 Threading on pipes by using ratchets Finger/body injury Only approved chemical substance to be used. Site Engineer
or by Machine threading Electric shock Only trained manpower doing activity Site Supervisor
Chemical contact Matric and standard tools to be used. Foreman
Slip trip fall Hand power tools must be inspected and colour coded. HSEA
MSDS must be attached
Keep good housekeeping of the area.
Don’t place finger and body part between moving parts.
14 Working in hot environment Exposure to heat Adequate and clean water supplies are readily available in close Site Engineer/Site
Heat stress proximity to the work area. Supervisor
Frequent breaks in shaded area to allow workers to adequately Foreman
recover from work periods in direct sunlight shall be provided to HSEA
all workers
Constant monitoring and behavioral observation of the workers
is required by field safety supervisor, Forman and supervisors to
observe specifically for signs and symptoms of heat stress
Shaded area large enough that all workers can take periodic
breaks in an area that is shielded from direct sunlight
No lonely work is permitted
Ensure follow SAIPEM heat stress procedure and Flag system
Heat index should be communicated as follows
Above 39 Degree Heat –Index, a yellow flag will be shown in high
location (All work can be carried out)
Above 45 Degree Heat –Index, a red flag will be shown on high
location (No heavy work like manual excavation, manual
handling, shuttering to be carried out)
15 Weather condition Inclement weather Lifting shall not be allowed if the wind speed is more than 9.7 Site Engineer/Supervisor
(High Wind and dust ) Meters per second. Foreman
Lifting shall be allowed from 9.8 till 12.5 meters per seconds if Lifting Supervisor
the operator is comfortable for safe lift and a separated WIND HSER
ASSESSMENT CHECKLIST shall be filled.
Before initialization of the work, lifting supervisor has to check
the work location and soil condition in adverse weather
condition.
ENCO-Job Safety Analysis Page 9 of 11
Company Encogroup
JSA No 22EGOM-ENCO-JSA-01
EPC-3 Offsite facilities project, Duqm Refinery JSA Creation Date 09.11.2021
Job Safety Analyses Revision No 01
Revision Date 03.07.2022
Scope- Fire water pipe lines Installation works Completed By Iftikhar Malik