l, performing authority, have read and understood the above conditions and precautions, i accept responsibillity for crraying out work
as specified. I will notify the area authority on completion or interruption of this work
Cancellation
l, performing authority, declare that work for which this permite was issued has been properly performed, and that the equipment, plan and
electrical apparature by the work have been left in safe, celar condition
the work is complete the work is incomplete
x
Print : Nama Peserta.......... signed : .......... time : Jam completed atau maksimum 11
l, area authority, have inspected the equipment/work area anf declare test that work for which this permite wa issued has been properly
performed, that all tools and apparatus hav been removed, and that equipment apparatus effected by work have been left in save clean condition
sw 1 OK To be Installed
LT 1 OK To be Installed
- Uncertified Plug Not Ok jika gland
LT 2 OK - Uncertied Gland ( pilihan ini setiap bay berbeda bisa jadi ditemukan di JB1,2,3, LT2? ) Uncertified/ OK jika
Jika ad maka Gland not OK Silahkan Lihat Listnya di table kunci di bawah. Gland certified
test equipment
make model serial No. calibrated
insullation resistance
circuit continuiy
conductor size
discription Ω
test voltage 1000 VDC
L N PE L-N L-PE N-PE
live CPC
lighting circuit
0.3 Ohm 0.3 Ohm 0.4 ohm >2.2G ohm >2.2G ohm >2.2G ohm
2.5mm 2.5mm
Table Kunci
Correctly Identified UN- Certified Gland EQ ID
BAY/ KAMAR 1 JB 1
BAY/ KAMAR 2 LT 2
BAY/ KAMAR 3 JB 3
BAY/ KAMAR 4 JB 2
BAY/ KAMAR 5 JB 1
BAY/ KAMAR 6 JB 1
BAY/ KAMAR 7 LT 2
BAY/ KAMAR 8 JB 3
BAY/ KAMAR 9 JB 2
BAY/ KAMAR 10 JB 1