0.1 Claim Table
0.1 Claim Table
1.1
1.2
1.3
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
,2.10
2.11
2.12
2.13
2.14
2.15
SUB-TOTAL CONTRACT AMOUNT FOR 1-BLOCK (excluding preliminaries)
SUB-TOTAL CONTRACT AMOUNT FOR 2-BLOCK (excluding preliminaries)
TOTAL CONTRACT AMOUNT FOR 2-BLOCKS (including Preliminaries)
Less 10% retention
Total Claimable (RM)
TWO (2) BLOCKS SEMI- DETACHED WORKS QUARTERS AT ARAS MAWAO , MEMBAKUT (Syarikat Usaha Sama) - 1st Claim
SCHEDULE OF CONTRACT VALUE
1.0 Preliminaries
Site establishment which shall include mobilisation and demobilisation of equipments. Contractor's kongsi, etc.
Provision of all insurance required
Provision of safety equipments to comply DOSH & other authorities requirement
one to-date)
8,000.00
12,360.00
9,375.00
0
0
0
0
0
0
0
0
0
0
0
0
33,035.00
69,160.00
6,916.00