Item

1.1
1.2
1.3

2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
,2.10
2.11
2.12
2.13
2.14
2.15
SUB-TOTAL CONTRACT AMOUNT FOR 1-BLOCK (excluding preliminaries)
SUB-TOTAL CONTRACT AMOUNT FOR 2-BLOCK (excluding preliminaries)
TOTAL CONTRACT AMOUNT FOR 2-BLOCKS (including Preliminaries)
Less 10% retention
Total Claimable (RM)
TWO (2) BLOCKS SEMI- DETACHED WORKS QUARTERS AT ARAS MAWAO , MEMBAKUT (Syarikat Usaha Sama) - 1st Claim
SCHEDULE OF CONTRACT VALUE
1.0 Preliminaries
Site establishment which shall include mobilisation and demobilisation of equipments. Contractor's kongsi, etc.
Provision of all insurance required
Provision of safety equipments to comply DOSH & other authorities requirement

2.0 Building works


Ecavation work for footings, ground beams, slabs and side drain, etc.
Reinforced concreting (Grade 25) works for footings, stumps,ground beams, columns and roof beams as per detail drawing
Reinforced concreting (Grade 25) work for slabs and aprons as per detail drawings.
Construction of external and internal wallings inclusive of finishes as per detail drawings.
Construction of steel trusses, purlins and colour bonded roofing system as per detail drawings.
Construction of external and internal ceilings as per detail drawings.
Supply and installation of doors and windows including frames as per detail drawings.
Supply and installation of complete water supply system c/w supports and all necessary fittings. As per detail drawings and
Supply and installation of complete sanitary system c/w RC base slab, manholes and all necessary piping
Reinforced concreting (Grade 20) work for building perimeter drains as per detail drawings.
Construction of RC side drains of size 300 mm wide x 300 mm deep x 75 mm thickness reinforced with one layer BRC 65, to
Supply and installation of complete sewerage system c/w manholes andall necessary fitting as per detail
Supply and installation of internal electrical wiring c/w all necessary fitting, earthing, ELCB, main switch board, etc, as per d
Construction of RC cooking bench
Painting finishes
SUB-TOTAL CONTRACT AMOUNT FOR 1-BLOCK (excluding preliminaries)
SUB-TOTAL CONTRACT AMOUNT FOR 2-BLOCK (excluding preliminaries)
TOTAL CONTRACT AMOUNT FOR 2-BLOCKS (including Preliminaries)
Less 10% retention
Total Claimable (RM)
FIRST CLAIM
UNIT OF MEASURE AMOUNT (1 BLOCK) BLOCK A BLOCK B
Lump Sum 5,000.00 % AMOUNT(RM) %
Lump Sum 1,100.00 50% 1,250.00 50%
Lump Sum 3,000.00 100% 550 100%
100% 1,500.00 100%

Building Works(work Done to-date)


Lump Sum 10,000.00 80% 8,000.00 75%
Lump Sum 15,450.00 100% 15,450.00 80%
Lump Sum 12,500.00 75% 9,375.00 75%
Lump Sum 15,000.00 0 0 0
Lump Sum 25,000.00 0 0 0
Lump Sum 5,000.00 0 0 0
Lump Sum 11,500.00 0 0 0
Lump Sum 8,000.00 0 0 0
Lump Sum 8,000.00 0 0 0
Lump Sum 13,000.00 0 0 0
Lump Sum 10,000.00 0 0 0
Lump Sum 8,000.00 0 0 0
Lump Sum 5,000.00 0 0 0
Lump Sum 2,000.00 0 0 0
Lump Sum 2,000.00 0 0 0
150,450.00 23.31% 36,125.00 21.31%
300,900.00
310,000.00
AMOUNT
1,250.00
550
1,500.00

one to-date)
8,000.00
12,360.00
9,375.00
0
0
0
0
0
0
0
0
0
0
0
0
33,035.00

69,160.00
6,916.00