PILE DRIVING INSPECTION RECORD

Tag Description: Tag No.:

P. O. No.: Inspection Classification Area/Unit:

Subcontractor: Subcontractor Owner Turnover System:

Work Package: Company Other Sub – System:

Driving Formula Date WeightOf

Hammer Drop Type Of Hammer Foundation

Number
Depth in Blows Depth in Blows Per Depth in Blows Per
Feet Per Foot Feet Foot Feet Foot
Pile Data

1 27 53 Pile Number
2 28 54 Dia: Tip

3 29 55 Head

4 30 56 Length of

5 31 57
6 32 58
7 33 59
8 34 60
9 35 61
10 36 62
11 37 63
12 38 64
13 39 65
14 40 66 Cut Off

15 41 67 Bottom of Pile

16 42 68 Overburden

17 43 69 Design Length

18 44 70
19 45 71 Kind of Pile

20 46 72 Starting Time

21 47 73 Stopping Time

22 48 74
23 49 75
24 50 76
25 51 77
26 52 78

Company
Name

Signature

Date Date Date Date