Professional Documents
Culture Documents
PTW Register v.91
PTW Register v.91
PTW Register v.91
EPCI Akatara Gas Processing Facility and Sales Gas Pipeline Project
Pembuatan Man Hole, Valve Box, Valve HWP- 2024-HWP-GDC- Singgih Zulkarnain/Sy 07.00 - LAST
29-Feb-24 Thursday
Pit, dan Drainase
A300
GDC
6246
006246
Samsudin JGC Eben
N.
JEVON AGAM
afik/Rudi
TRA 1-Mar-24 7-Mar-24 1 DAY
18.00
7:00
DAY
Civil Work and Install Fence & Gate at HWP- 2024-HWP-GDC- Singgih Zulkarnain/Sy 07.00 - LAST
29-Feb-24 Thursday
AGPF Perimeter
A200
GDC
6249
006249
Arpandi MGP Totok
N.
JEVON AGAM
afik/Rudi
TRA 1-Mar-24 7-Mar-24 1 DAY
18.00
7:00
DAY
Install Support, Cable Tray, and Glanding Metering 2024-HWP- Singgih Zulkarnain/Sy 07.00 - LAST
29-Feb-24 Thursday
Thermination Equipment Station
HWP 6250
006250
Hedi GLB Ilyas
N.
JEVON AGAM
afik/Rudi
TRA 1-Mar-24 7-Mar-24 1 DAY
18.00
7:00
DAY
Troubleshoot & Fix Problem in UPS AGPF Comm- 2024-Comm-CWP- Widi Singgih Zulkarnain/Sy 07.00 - LAST
29-Feb-24 Thursday
and Energizing
A600
CWP
6251
006251
Syahida JGC Handoko F.
JEVON AGAM
afik/Rudi
TRA 1-Mar-24 7-Mar-24 1 DAY
18.00
7:00
DAY
Survey Topography & Stake out Well Well Pad A, 2024-HWP- Zulkarnain/Sy 07.00 - LAST
29-Feb-24 Thursday
Pad A, B, C, D Area B, C, D
HWP 6253
006253
Hasibuan PSP Ali P. Rangga JEVON AGAM
afik/Rudi
TRA 1-Mar-24 7-Mar-24 1 DAY
18.00
7:00
DAY
ROW Pipe
Spreading Aggregat, Compaction, and 2024-CWP- Zulkarnain/Sy 07.00 -
1-Mar-24 Friday
DCP Test on National Road
Line 5+535 - CWP 6255
006255
M. Rasyid PSP Ali P. Rangga JEVON AGAM
afik/Rudi
TRA 2-Mar-24 8-Mar-24 2 DAY
18.00
7:00 VALID
14+500
Energize, Testing ICSS, and Loop Test at Comm- 2024-Comm-CWP- Singgih Zulkarnain/Sy 07.00 -
2-Mar-24 Saturday
CCR & Substation
A600
CWP
6257
006257
Rahman JGC Anda
F.
JEVON AGAM
afik/Rudi
TRA 2-Mar-24 8-Mar-24 2 DAY
18.00
7:00 VALID
Lube Oil Flushing for Gas Engine Comm- 2024-Comm-CWP- Zulkarnain/Sy 07.00 -
2-Mar-24 Saturday
Compressor (GEC)
A400
CWP
6258
006258
Pani JGC Baihaqi Fadinsa FERDYAN AGAM
afik/Rudi
TRA 2-Mar-24 8-Mar-24 2 DAY
18.00
7:00 VALID
A100,
Loop Test Instrument Signal Field Device at A200, Comm- 2024-Comm-CWP- Aldi Singgih Zulkarnain/Sy 07.00 -
2-Mar-24 Saturday
Process Area A300, CWP
6260
006260
Benny JGC Dwika F.
FERDYAN AGAM
afik/Rudi
TRA 3-Mar-24 9-Mar-24 3 DAY
18.00
7:00 VALID
A400, A500
Energize & Testing Dehydration Package Comm- 2024-Comm-CWP- Aldi Singgih Zulkarnain/Sy 07.00 -
2-Mar-24 Saturday
Unit Control Panel at CCR
A600
CWP
6261
006261
Benny JGC Dwika F.
FERDYAN AGAM
afik/Rudi
TRA 3-Mar-24 9-Mar-24 3 DAY
18.00
7:00 VALID
PTW DATABASE REGISTER
EPCI Akatara Gas Processing Facility and Sales Gas Pipeline Project
Loop Test Instrument Signal Field Device at Comm- 2024-Comm-CWP- Aldi Singgih Zulkarnain/Sy 07.00 -
2-Mar-24 Saturday
Utility Area
A600
CWP
6262
006262
Benny JGC Dwika F.
FERDYAN AGAM
afik/Rudi
TRA 3-Mar-24 9-Mar-24 3 DAY
18.00
7:00 VALID
Energize Testing Gas Engine Generator Comm- 2024-Comm-CWP- Aldi Singgih Zulkarnain/Sy 07.00 -
2-Mar-24 Saturday
Unit Control Panel & Local Control Panel
A600
CWP
6263
006263
Benny JGC Dwika F.
FERDYAN AGAM
afik/Rudi
TRA 3-Mar-24 9-Mar-24 3 DAY
18.00
7:00 VALID
Brushing and Field Touch up Painting for 2024-HWP- Nurul Singgih Zulkarnain/Sy 07.00 -
4-Mar-24 Monday
Support & Spool Pipe at GEC Area
A400 HWP 6264
006264 Aiman SK Sumanto
N.
JEVON FX JITO
afik/Rudi
TRA 5-Mar-24 11-Mar-24 5 DAY
18.00
7:00 VALID
Brushing and Field Touch up Painting for Comm- 2024-Comm-HWP- Risman Zulkarnain/Sy 07.00 -
4-Mar-24 Monday
Support & Spool Pipe at Fire Water Area
A600
HWP
6266
006266 Helmi SK Sumanto Fadinsa JEVON FX JITO
afik/Rudi
TRA 5-Mar-24 11-Mar-24 5 DAY
18.00
7:00 VALID
Brushing and Field Touch up Painting for 2024-HWP- Tomo Singgih Zulkarnain/Sy 07.00 -
4-Mar-24 Monday
Support & Spool Pipe at A620 & A640
A600 HWP 6268
006268 Wijaya SK Sumanto
N.
JEVON FX JITO
afik/Rudi
TRA 5-Mar-24 11-Mar-24 5 DAY
18.00
7:00 VALID
Civil Work at CCR & Substation Area 2024-HWP- Singgih Zulkarnain/Sy 07.00 -
4-Mar-24 Monday
(Control Box and Finishing Bundwall)
A600 HWP 6284
006284
Yoni MGP Mustain
N.
JEVON FX JITO
afik/Rudi
TRA 5-Mar-24 11-Mar-24 5 DAY
18.00
7:00 VALID
Connecting Drain Pipe to Control Box at COMM- 2024-COMM-CWP- Ngurah Zulkarnain/Sy 07.00 -
4-Mar-24 Monday
Substation Area
A600
CWP
6291
006291
Jalalludin MMT Simeon
Bram
FERDYAN FX JITO
afik/Rudi
TRA 5-Mar-24 11-Mar-24 5 DAY
18.00
7:00 VALID
Install Equipment Telecom System (Killing Metering COMM- 2024-COMM-CWP- Dody Ngurah Zulkarnain/Sy 07.00 -
4-Mar-24 Monday
Punch List) Station CWP
6292
006292 Suandi GLB Ato S.
Bram
FERDYAN FX JITO
afik/Rudi
TRA 5-Mar-24 11-Mar-24 5 DAY
18.00
7:00 VALID
Install Tray and Support Tray at GEC 2024-HWP- Singgih Zulkarnain/Sy 07.00 -
4-Mar-24 Monday
Area
A400 HWP 6293
006293
Muksin GLB Ilyas
N.
JEVON FX JITO
afik/Rudi
TRA 5-Mar-24 11-Mar-24 5 DAY
18.00
7:00 VALID
PTW DATABASE REGISTER
EPCI Akatara Gas Processing Facility and Sales Gas Pipeline Project
Hydrotest for Pipe Spool at Tank & Utility A300 & 2024-CWP- Singgih Zulkarnain/Sy 07.00 -
4-Mar-24 Monday
Area A600
CWP 6302
006302
Sugiri ISTI Miswandi
N.
JEVON FX JITO
afik/Rudi
TRA 5-Mar-24 11-Mar-24 5 DAY
18.00
7:00 VALID
A100,
2024-CWP- Singgih Zulkarnain/Sy 07.00 -
4-Mar-24 Monday Hydrotest for Pipe Spool at Process Area A200, CWP 6303
006303
Sayuti ISTI Miswandi
N.
JEVON FX JITO
afik/Rudi
TRA 5-Mar-24 11-Mar-24 5 DAY
18.00
7:00 VALID
A400, A500
Brushing and Field Touch up Painting for 2024-HWP- Singgih Zulkarnain/Sy 07.00 -
4-Mar-24 Monday
Pipe Spool & Support
A100 HWP 6306
006306
Syahrul ISTI Miswandi
N.
JEVON FX JITO
afik/Rudi
TRA 5-Mar-24 11-Mar-24 5 DAY
18.00
7:00 VALID
Brushing and Field Touch up Painting for 2024-HWP- Singgih Zulkarnain/Sy 07.00 -
4-Mar-24 Monday
Pipe Spool & Support
A200 HWP 6307
006307
Syahrul ISTI Miswandi
N.
JEVON FX JITO
afik/Rudi
TRA 5-Mar-24 11-Mar-24 5 DAY
18.00
7:00 VALID
Brushing and Field Touch up Painting for 2024-HWP- Singgih Zulkarnain/Sy 07.00 -
4-Mar-24 Monday
Pipe Spool & Support
A300 HWP 6308
006308
Syahrul ISTI Miswandi
N.
JEVON FX JITO
afik/Rudi
TRA 5-Mar-24 11-Mar-24 5 DAY
18.00
7:00 VALID
Brushing and Field Touch up Painting for 2024-HWP- Singgih Zulkarnain/Sy 07.00 -
4-Mar-24 Monday
Pipe Spool & Support
A400 HWP 6309
006309
Syahrul ISTI Miswandi
N.
JEVON FX JITO
afik/Rudi
TRA 5-Mar-24 11-Mar-24 5 DAY
18.00
7:00 VALID
PTW DATABASE REGISTER
EPCI Akatara Gas Processing Facility and Sales Gas Pipeline Project
Brushing and Field Touch up Painting for 2024-HWP- Singgih Zulkarnain/Sy 07.00 -
4-Mar-24 Monday
Pipe Spool & Support
A600 HWP 6310
006310
Syahrul ISTI Miswandi
N.
JEVON FX JITO
afik/Rudi
TRA 5-Mar-24 11-Mar-24 5 DAY
18.00
7:00 VALID
Brushing and Field Touch up Painting for 2024-HWP- Singgih Zulkarnain/Sy 07.00 -
4-Mar-24 Monday
Pipe Spool & Support
A700 HWP 6311
006311
Syahrul ISTI Miswandi
N.
JEVON FX JITO
afik/Rudi
TRA 5-Mar-24 11-Mar-24 5 DAY
18.00
7:00 VALID
Threaded (NPT), Cutting, Grinding, 2024-HWP- Gede Bagus Singgih Zulkarnain/Sy 07.00 -
5-Mar-24 Tuesday
Welding, and Cutting Torch Spool Pipe
A200 HWP 6316
006316 P. SK Alfi Fauzi
N.
JEVON FX JITO
afik/Rudi
TRA 6-Mar-24 12-Mar-24 6 DAY
18.00
7:00 VALID
Pneumatic Test for Test Package Line RF, 2024-CWP- Sohib Singgih Zulkarnain/Sy 07.00 -
5-Mar-24 Tuesday
AI, PG
A400 CWP 6325
006325
Supriyanto SK Ansori N.
JEVON FX JITO
afik/Rudi
TRA 6-Mar-24 12-Mar-24 6 DAY
18.00
7:00 VALID
PTW DATABASE REGISTER
EPCI Akatara Gas Processing Facility and Sales Gas Pipeline Project
Pembuatan Valve Box, Pondasi Tangga, HWP- 2024-HWP-GDC- Singgih Zulkarnain/Sy 07.00 -
5-Mar-24 Tuesday
dan Finishing Pekerjaan Sipil
A200
GDC
6342
006342
Totok JGC Eben
N.
JEVON FX JITO
afik/Rudi
TRA 6-Mar-24 12-Mar-24 6 DAY
18.00
7:00 VALID
Install Cable Tray Electrical & Instrument 2024-HWP- Singgih Zulkarnain/Sy 07.00 -
5-Mar-24 Tuesday
and Thermination to Equipment
A400 HWP 6345
006345
Suwardi GLB Ilyas
N.
JEVON FX JITO
afik/Rudi
TRA 6-Mar-24 12-Mar-24 6 DAY
18.00
7:00 VALID
Install Cable Tray Electrical & Instrument 2024-HWP- Singgih Zulkarnain/Sy 07.00 -
5-Mar-24 Tuesday
and Thermination to Equipment
A500 HWP 6346
006346
Asep T. GLB Ilyas
N.
JEVON FX JITO
afik/Rudi
TRA 6-Mar-24 12-Mar-24 6 DAY
18.00
7:00 VALID
Zulkarnain/Sy 07.00 -
5-Mar-24 Tuesday 6348 2024--006348 GLB JEVON FX JITO
afik/Rudi
TRA 6-Mar-24 12-Mar-24 6 DAY
18.00
7:00 VALID
Glanding and Thermination Panel at COMM- 2024-COMM-CWP- Widi Ngurah Zulkarnain/Sy 07.00 -
5-Mar-24 Tuesday
Substation
A600
CWP
6349
006349
Rahmad S. GLB Handoko Bram
JEVON FX JITO
afik/Rudi
TRA 6-Mar-24 12-Mar-24 6 DAY
18.00
7:00 VALID
Install Cold Insulation for Piping Line PG, 2024-CWP- Singgih Zulkarnain/Sy 07.00 -
5-Mar-24 Tuesday
HM, RF, PL
A100 CWP 6351
006351
Badri SAT Sumanto
N.
JEVON FX JITO
afik/Rudi
TRA 6-Mar-24 12-Mar-24 6 DAY
18.00
7:00 VALID
Install Cold Insulation for Piping Line PG, 2024-CWP- Singgih Zulkarnain/Sy 07.00 -
5-Mar-24 Tuesday
HM, RF, PL
A400 CWP 6354
006354
Badri SAT Sumanto
N.
JEVON FX JITO
afik/Rudi
TRA 6-Mar-24 12-Mar-24 6 DAY
18.00
7:00 VALID
Install Hot Insulation for Piping Line PG, 2024-CWP- Singgih Zulkarnain/Sy 07.00 -
5-Mar-24 Tuesday
HM, RF, PL
A500 CWP 6355
006355
Badri SAT Sumanto
N.
JEVON FX JITO
afik/Rudi
TRA 6-Mar-24 12-Mar-24 6 DAY
18.00
7:00 VALID
A100,
Loading-unloading and Transfer Spool 2024-CWP-LC- Singgih Zulkarnain/Sy 07.00 -
5-Mar-24 Tuesday
Pipe, Support, and Valve by Crane
A200, CWP-LC 6364
006364
Nurdin ISTI Miswandi
N.
JEVON FX JITO
afik/Rudi
TRA 6-Mar-24 12-Mar-24 6 DAY
18.00
7:00 VALID
A400, A500
Erection and Laying Pipe Spool, Support, 2024-CWP-LC- Singgih Zulkarnain/Sy 07.00 -
5-Mar-24 Tuesday
Valve to Pipe Rack
A100 CWP-LC 6365
006365
Halim ISTI Miswandi
N.
JEVON FX JITO
afik/Rudi
TRA 6-Mar-24 12-Mar-24 6 DAY
18.00
7:00 VALID
Erection and Laying Pipe Spool, Support, 2024-CWP-LC- Singgih Zulkarnain/Sy 07.00 -
5-Mar-24 Tuesday
Valve to Pipe Rack
A400 CWP-LC 6366
006366
Umar ISTI Miswandi
N.
JEVON FX JITO
afik/Rudi
TRA 6-Mar-24 12-Mar-24 6 DAY
18.00
7:00 VALID
A100,
Loading-unloading and Transfer Spool 2024-CWP- Singgih Zulkarnain/Sy 07.00 -
5-Mar-24 Tuesday
Pipe, Support, and Valve by TMC
A200, CWP 6367
006367
Sayuti ISTI Miswandi
N.
JEVON FX JITO
afik/Rudi
TRA 6-Mar-24 12-Mar-24 6 DAY
18.00
7:00 VALID
A400, A500
Loading-unloading Material Pipe & A500 & 2024-CWP-LC- Singgih Zulkarnain/Sy 07.00 -
5-Mar-24 Tuesday
Shoring A700
CWP-LC 6369
006369
Benny PSP Ayoni
N.
JEVON FX JITO
afik/Rudi
TRA 6-Mar-24 12-Mar-24 6 DAY
18.00
7:00 VALID
Install and Welding Pipe Spool at Well 2024-HWP- Singgih Zulkarnain/Sy 07.00 -
5-Mar-24 Tuesday
Pad B
Well Pad B HWP 6373
006373
Risdianto PSP Soni P.
N.
JEVON FX JITO
afik/Rudi
TRA 6-Mar-24 12-Mar-24 6 DAY
18.00
7:00 VALID
PTW DATABASE REGISTER
EPCI Akatara Gas Processing Facility and Sales Gas Pipeline Project
Pulling and Dressing Electrical & Instrument A100, 2024-CWP- Singgih Zulkarnain/Sy 07.00 -
6-Mar-24 Wednesday
Cable A400, A500
CWP 6378
006378
Sugiyanto GLB Ato S.
N.
JEVON FX JITO
afik/Rudi
TRA 7-Mar-24 13-Mar-24 7 DAY
18.00
7:00 VALID
ROW Pipe
Loading-unloading Material Pipe & Line KP 2024-CWP-LC- Zulkarnain/Sy 07.00 -
6-Mar-24 Wednesday
Shoring 6+000 -
CWP-LC 6380
006380
Mulyadi PSP Soni P. Rangga SUTOMO FX JITO
afik/Rudi
TRA 7-Mar-24 13-Mar-24 7 DAY
18.00
7:00 VALID
17+000
ROW Pipe
Line KP 2024-HWP- Zulkarnain/Sy 07.00 -
6-Mar-24 Wednesday Land Clearing Pipe Line 13+600 -
HWP 6381
006381
Mulyadi PSP Ali P. Rangga SUTOMO FX JITO
afik/Rudi
TRA 7-Mar-24 13-Mar-24 7 DAY
18.00
7:00 VALID
11+800
ROW Pipe
Fit-up, Welding, Field Joint Coating, and Line KP 2024-HWP-CSE- Zulkarnain/Sy 07.00 -
6-Mar-24 Wednesday
Holiday Test Sales Gas Pipe 8" 13+600 -
HWP-CSE 6382
006382
Mulyadi PSP Ali P. Rangga SUTOMO FX JITO
afik/Rudi
TRA 7-Mar-24 13-Mar-24 7 DAY
18.00
7:00 VALID
11+800
ROW Pipe
CWP-
Line KP 2024-CWP-GDC- Zulkarnain/Sy 07.00 -
6-Mar-24 Wednesday Trenching, Lowering, Backfill Pipe Line 8" 13+600 -
GDC-LC- 6383
LC-CSE-006383
Mulyadi PSP Ali P. Rangga SUTOMO FX JITO
afik/Rudi
TRA 7-Mar-24 13-Mar-24 7 DAY
18.00
7:00 VALID
CSE
11+800
Radiography Test for Pipe Line & Flow ROW Pipe 2024-CWP- Zulkarnain/Sy 07.00 -
6-Mar-24 Wednesday
Line Line
CWP 6388
006388
Zacky UTI Soni P. Rangga SUTOMO FX JITO
afik/Rudi
TRA 7-Mar-24 13-Mar-24 7 DAY
18.00
7:00 VALID
Cutting, Grinding, Fit-up, and Welding 2024-HWP- Adi Singgih Zulkarnain/Sy 19.00 -
6-Mar-24 Wednesday
Pipe, Support, and Valve
A300 HWP 6397
006397 Kurniawan ISTI Miswandi
N.
JEVON FX JITO
afik/Rudi
TRA 7-Mar-24 13-Mar-24 7 NIGHT
06.00
7:00 VALID
Cutting, Grinding, Fit-up, and Welding 2024-HWP- Adi Singgih Zulkarnain/Sy 19.00 -
6-Mar-24 Wednesday
Pipe, Support, and Valve
A400 HWP 6398
006398 Kurniawan ISTI Miswandi
N.
JEVON FX JITO
afik/Rudi
TRA 7-Mar-24 13-Mar-24 7 NIGHT
06.00
7:00 VALID
Cutting, Grinding, Fit-up, and Welding 2024-HWP- Adi Singgih Zulkarnain/Sy 19.00 -
6-Mar-24 Wednesday
Pipe, Support, and Valve
A700 HWP 6401
006401 Kurniawan ISTI Miswandi
N.
JEVON FX JITO
afik/Rudi
TRA 7-Mar-24 13-Mar-24 7 NIGHT
06.00
7:00 VALID