S. appropriate Box Inspection Criteria Remarks # Appears Normal Need Repair
1 Weighing of cylinder at the time of receiving
2 Checking of cylinder details and Brand name 3 Physical health of cylinder 4 Condition of valve 5 Checking of pressure guage 5 Videos and Pictures attached at the time of delivery
S. No. Following activities to be done Status Remarks
1 Checking of cylinder tare weight before refiling (Mentioned) Done 2 Repairing of valve Done 3 Replacement of all O-rings Done 4 Pressurization of cylinder with nitrogen Done 5 Valve leakage test Done 6 Filling of clean agent fire suppression Done 7 Conduction of soap testing (Pre-Crawling) Done 8 Crawling of filled cylinder Done 9 Conduction of soap testing (Post-Crawling) Done 10 Observation of Cylinder (specify time duration) Done 11 Weighing of cylinder before delivery Done