JLL Rajyash Plumbing (Ext. WRK)
JLL Rajyash Plumbing (Ext. WRK)
(EXTERNAL WORKS)
Project Rajyash Regius
PMC JLL
Ref.Drg.No.
Location:
PRE-EXECUTION CHECKS
1 Have all the sewer pipes, traps and other fittings free from cracks,
holes and burrs etc., and is checked before being put into use?
POST-EXECUTION CHECKS
1 Are the spacing of inspection chambers and manholes such that
cleaning of sewer lines can be done easily?
2 Are the inlets and outlets of chambers and manholes plugged during
progress of the work?
3 Has it been ensured that gully’s/channels of inspection
chambers/manholes have been given a smooth curve if sewer lines
are intersecting at right angles?
4 Have the joints of sewer pipes been plugged with cotton yarn (packing
rassi) before applying cement slurry over joints?
Approved With
Approved Not Approved
Comments
Contractor JLL Client
Name: Name: Name:
Sign: Sign: Sign:
Date: Date: Date: