(INSTALLATION GUIDE)
Project Rajyash Regius
PMC JLL
Ref.Drg.No.
Location:
PRE-EXECUTION CHECKS
1 Has it been ensured that correct size fittings and tubes are present?
1 Is the outside surface of the tube cleaned, that will eventually go into
the socket of the fitting?
POST-EXECUTION CHECKS
1 Has the rough edges around the outside and inside of the tube been
removed with a file or sharp blade?
Approved With
Approved Not Approved
Comments
Contractor JLL Client
Name: Name: Name:
Sign: Sign: Sign:
Date: Date: Date: