CHECKLIST FOR PLUMBING (INTERNAL

WATER PIPING)
Project Rajyash Regius

Client Rajyash Procon LLP

PMC JLL

Contractor Ramya Projects


Date of Inspection:
RFI No:

Ref.Drg.No.

Location:

S.NO. Description YES NO Remarks

PRE-EXECUTION CHECKS

1 Has the line on walls done by chalk in proper alignment, plumb and as
per the heights mentioned in plumbing drawings?

2 Has chasing been done keeping the following points in mind?

2.1 Depth should not be more than pipe size

2.2 Width sufficient to accommodate the pipe line

2.3 Alignment and straightness should be considered

2.4 Height for all fittings should be as per given drawing

3 Has the check for class / specifications of materials done?

4 Has it been ensured that the groove chasing does not exceed 30 mm
after rough plaster for cold water supply line and cold feed line and 50
mm for hot water supply lines?

5 Are the required tools available?

6 Are there any specific requirements of the client?

CHECKS DURING EXECUTION

1 Has the pipe-skeleton been prepared and the joints checked for
proper tightness?

2 Is the skeleton, including fittings covered with good quality Hessian


cloth and tied properly for cold water pipe work?

3 Is the skeleton fixed in wall using 40 mm plumbing nails at a


distance of 230 mm on alternate side?

4 Are proper sized wooden plugs inserted in the pipe end and then has
the threading carried out?
POST-EXECUTION CHECKS

1 Are the internal pipe works in toilets and kitchen concealed and
carried out as per working drawings?
2 Are the sharp edges of gripping vice and other handling tools
muffed with a suitable packing to prevent damage of pipe surface?
3 Are the joints made with hand tightening of the fitting over pipe and
covered with proper layer of Teflon tape?
4 Has special care been taken while connecting UPVC pipe with G.I.
Fittings?
5 Has water tightness of line been checked using pressure testing
equipment?
6 Has bitumen paint been applied over the G.I pipe work?

7 Has it been ensured that the bore pieces projecting out should be of
minimum 200 mm from plastered surface?
8 Has a gap of 10 mm been kept between all pipes and fittings to
accommodate thermal expansion and contraction of pipes for longer
life of the system?
9 Are all the horizontal lines within bathrooms cement encased and
tested before compacting of sunken floor to avoid any accidental
damages?
10 Has curing been done over the plaster for at least 7 days?

Corrective action, if any:

Approved With
Approved Not Approved
Comments
Approved With
Approved Not Approved
Comments
Contractor JLL Client
Name: Name: Name:
Sign: Sign: Sign:
Date: Date: Date: