The Bidder shall provide an ESHS Methodology providing information on how the Bidder shall meet
those -
ESHS Specifications.
The ESHS Methodology submitted shall be in the form of a preliminary draft of the Project Area
Environmental and Social Management Plan (PA-ESMP), the content of which is detailed in
Section 6 Employers requirement to ESHS Specifications.
and social impact assessment, the ESHS Methodology shall provide detailed information on the
management of the following items:
(a) NDB guidelines as per the document given in the link below:
ndb-environment-social-framework-20160330.pdf
(a) ESHS resources and facilities and ESHS monitoring organization;
(b) Project Areas description (base camps, quarries, borrow pits, storage areas);
(c) Health & Safety on Project Areas;
(d) Local recruitment and ESHS trainings of local staff (capacity building), ESHS trainings of
subcontractors and local partners (transfer of knowledge);
(e) Relations with stakeholders, information and consultation of local communities and
authorities;
(f) Traffic management;
(g) Hazardous products;
(h) Wastewater (effluents);
(i) Protection of water resources;
(j) Atmospheric emissions, noise and vibrations;
(k) Waste management;
(l) Biodiversity: protection of fauna and flora;
(m) Site rehabilitation and revegetation;
(n) Erosion and sedimentation;
(o) Control of infectious and communicable diseases (HIV/AIDS, Dengue, Malaria, COVID-19
etc.).