INSPECTION REPORT
[FULL TIME – GENERAL / 1st SHIFT – SECOND YEAR]
2016-2017
INSPECTION REPORT
INSPECTION REPORT FOR POLYTECHNIC COLLEGES ESTABLISHED / AFFILIATED
FOR FIRST YEAR DURING 2015-2016 AND SEEKING GRANT OF AFFILIATION UNDER
FULL TIME – GENERAL / 1st SHIFT – SECOND YEAR FOR THE ACADEMIC YEAR 2016-
2017
Date of Inspection : -- --
Time of Inspection
Inspection Fee : Rs. 5000 for every Sanctioned Intake of 60. Sanctioned Intake has to be
calculated for First Year and Second Year. [Example : First Year Sanctioned intake: 300, Second
Year Sanctioned Intake: 420 then for Total Sanctioned Intake of 720, Rs. 60,000 to be paid as
Inspection Fee]
Demand Draft in favour of "Director of Technical Education, Chennai" payable at Chennai
should be enclosed.
02.
03.
04. for 2016-17
05.
TOTAL ANNUAL INTAKE
Village / Town :
Taluk :
District :
Pincode :
Assembly Constituency :
Parliament Constituency :
Mobile :
E-mail :
Village / Town :
Taluk :
District :
Pincode :
Assembly Constituency :
Parliament Constituency :
Mobile :
E-mail :
Society Registration Act No. / Trust Act No. / Company Act No. :
Registration No. :
Date of Registration :
Place of Registration :
(Please Click on any one of the classification) Other than Rural area
Ownership of Land : Government Trust Society
Govt. Leased Owned Company
Details of Land
(The Survey No. with sub-division and extent of lands for each survey number to be indicated)
Sl. Registration Registration Name of the Survey No. with Extent of Land
No Document No. Date village sub-division Lands Classification
. (in acres) [Indicate Dry
or Wet Land]
TOTAL ---
06 (c) DETAILS ABOUT THE BUILDING OF THE INSTITUTION AT THE PERMANENT SITE
TOTAL AREA :
07. PRINCIPAL
(*) As per AICTE regulations 2013, please refer to Gazette of India Notification dated 5th March 2010,
Pay Scales, Service Conditions and Qualifications for the teachers and other academic staff in
technical Institutions (Diploma) Regulations, 2010. Also refer AICTE Website: Bulletin – FAQ section.
For PRINCIPAL : Bachelor’s degree and Master’s degree of appropriate branch in Engineering /
Technology with First Class or equivalent either Bachelor’s or Master’s level and Ph. D in
Engineering / Technology
EXPERIENCE : Minimum of 10 years relevant experience in teaching / Research / Industry out of
which at least 3 years shall be at the level of head of department or equivalent.
AGE : Permissible Maximum age limit : 65 Years
GUIDELINES :
AGE : If the age of the Principal is £ 65 years, then Marks to be allotted is : 05, Otherwise 00.
QUALIFICATION : If the Qualification is Ph.D, then Marks to be allotted is 05
If the Qualification is M.E., then Marks to be allotted is 03, Otherwise 00.
EXPERIENCE : If the Experience is ³ 12 years, then Marks to be allotted is 05
If the Experience is between ³ 10 and < 11 years, then Marks to be allotted is 03, Otherwise 00.
a. Name :
b. Qualification :
d. Date of Joining :
f. Age 05
g. Qualification 05
h. Experience 05
TOTAL MARKS : 15
08. FACULTY AND STAFF REQUIREMENTS [FIRST AND SECOND YEAR ONLY]
1. FIRST YEAR
English
Mathematics
Physics
Chemistry
Engineering
2. SECOND YEAR
CIVIL
MECHANICAL
EEE
ECE
COMPUTER
IT
AUTOMOBILE
MARINE
MECHATRONICS
TOTAL :
b. Librarian 02
Physical Education
c. Director 02
Technical Supporting
d. Staff [Non-Teaching] 02
e. Administrative Staff 02
f. Basic Servants 02
09. LIBRARY
Required as Secured Marks
S. Max éMax.Marks x Available ù
Description per AICTE Available Shortage
No Marks ê ú
Norms ë Re quired û
B1 : 50
Number of Titles
a. 03
B2 : 25 / COURSE
250 /
B4 : DIVISION
b. Number of Volumes 05 125 /
B5 : DIVISION
REQUIREMENTS - LIBRARY
B = Number of Divisions [1 Division = 60]. If the Institutions has got approval from AICTE for the conduct of
5 Courses with a sanctioned intake of 60 in each Course, then the No. of Divisions (B) = 5. For Number of
Volumes and journals, this number (say, 5) has to be multiplied.
Number of Titles B1 : First Year : Only 50 number of Titles of Books for whole First year
B2 : Second Year : 25 per Course
Number of Volumes B4 : First Year : 250 x No. of Divisions (B)
B5 : Second Year : 125 x No. of Divisions (B)
Marks should be awarded proportionate to Volume of Books available in
the library
Number of Journals B7 : 3Journal for each Division for each I & II year
10. EQUIPMENT
GUIDELINES FOR MARKS TO BE ALLOTTED FOR EQUIPMENT :
If there is no shortage in the required number and in the area, then the
01
mark to be allotted for each Serial Number in the category is
If there is any shortage, either in the required number and / or in the area,
00
then the mark to be allotted for each Serial Number in the category is
Number Details Area Details
Maximum Marks
applicable item)
Marks Secured
(1 for each
Built-up Area
Built-up Area
AICTE NORMS
Available
Available
Required
Shortage
Required
Shortage
S.
Number
Number
Category INA [AREA /
No
ROOM]
11. INA
12. INA
13. INA
14. INA
15. INA
20. INA
INA if additional
30. Laboratory 8
workshop is
INA
31. Laboratory 9 available, Lab
32. Laboratory 10
INA area may be
reduced
INA
33. Laboratory 11 accordingly
INA
34. Laboratory 12
Laboratory 13 INA
35. [66 sq.m/Lab]
36. Laboratory 14 INA [200 sq.m/
Addl.workshop]
37. Laboratory 15 INA
38. Laboratory 16 INA
39. Laboratory 17 INA
40. Laboratory 18 INA
Area details
41. Laboratory 19 INA
furnished in
42. Laboratory 20 INA
Application
43. INA
uploaded (
44. INA
PART 1,2&
45. INA
Deficiency
46. INA
Report) in
47. INA
AICTE web
48. INA
portal for Lab
49. INA
& workshop
Additional INA
50.
Workshop may be
Additional INA verified
51.
Workshop
Additional INA
52.
Workshop
INA
53.
INA
54.
Computer INA 01 No.
55. 1
Centre [100 sq.m]
INA 01 No.
56. Drawing Hall 1
[132 sq.m]
1 for each
ADA course
63. HOD Cabin 1
[10 sq.m / HOD
Cabin]
5 Sq.m for each
Faculty Room – ADA First Year Faculty
64. 1 =( 0.25 * I Yr
I Year
Intake)
5 Sq.m for each
Second Year
Faculty Room – II ADA
65. 1 Faculty
Year =( 0.25 * II Yr
Intake)
AMA 01 No.
66. Central Stores 1
[30 sq.m]
AMA 01 No.
67. Maintenance 1
[10 sq.m]
AMA 01 No.
68. Security 1
[10 sq.m]
AMA 01 No.
69. House Keeping 1
[10 sq.m]
AMA 01 No.
70. Pantry for staff 1
[10 sq.m]
AMA 01 No.
71. Exam Office 1
[30 sq.m]
Placement AMA 01 No.
72. 1
Office [30 sq.m]
AMA 01 No.
73. Gents Toilet 1
[75 sq.m]
AMA 01 No.
74. Ladies Toilet 1 [75 sq.m]
Boys Common AMA 01 No.
75. 1
Room [75 sq.m]
Girls Common AMA 01 No.
76. 1
Room [75 sq.m]
AMA 01 No.
77. Cafeteria 1
[150 sq.m]
Stationary Store AMA 01 No.
78. 1
& Reprography [10 sq.m]
First Aid cum 01 No.
79. AMA 1
Sick Room [10 sq.m]
TOTAL MARKS :
If the Essential requirements are available, then the mark to be allotted for
01
each Serial Number in the category is
If the Essential requirements are not available, then the mark to be allotted
00
for each Serial Number in the category is
S. Availability If YES, then Maximum Marks
Description
No [YES / NO] Number Available Marks Secured
1. Language Laboratory 1
2. Water supply 1
3. Electric supply 1
4. Generator facility 1
5. Sewage Disposal 1
6. Telephone and Fax 1
7. First Aid facility 1
8. Vehicle parking 1
9. Institution Web-site 1
Barrier Free built Environment for
Differently-Abled and elderly persons
10.
including availability of specially designed
1
toilets for ladies and gents separately.
Safety provisions including fire and other
11.
calamities
1
ESSENTIAL IN LIBRARY
16. Digital Library facility 1
17. Reprographic Facility 1
18. Document scanning facility 1
19. Document printing facility 1
20. Internet facility in Library 1
21. Multimedia Facilities 1
22. Central Xerox Facility 1
TOTAL MARKS : 25
Since, the following requirements are mentioned as desired in AICTE norms, marks need
not be allotted.
Details to be
Availability provided.
S.No Description REQUIREMENT
[YES / NO] [Number,
if so required]
Public announcement system at strategic locations for
1. general announcements / paging and announcements DESIRED
in emergency
Enterprise Resource Planning (ERP) Software for
2. DESIRED
Student-Institution-Parent interaction
3. Transport DESIRED
DESIRED
10. Principal’s Quarters
[150 sq.m]
DESIRED
11. Guest House
[30 sq.m]
DESIRED
12. Sports Club / Gymnasium
[100 sq.m]
DESIRED
13. Auditorium / Amphi Theatre
[250 sq.m]
DESIRED
14. Boys Hostel
Adequate
DESIRED
15. Girls hostel
Adequate
If the Marks secured in Column (5) is less than the Minimum Marks to be secured in column
(4), then indicate YES in the Deficiency column (6). Otherwise, indicate NO.
If any Course is not Offered, merge the Column (5) and (6) and indicate as NOT OFFERED.
Equipment for First Year & Common Laboratories are COMPULSORY.
S. Maximum Minimum Marks Marks Deficiency
Parameter
No. Marks to be secured Secured [YES / NO]
(1) (2) (3) (4) (5) (6)
EQUIPMENT : ( Marks to be filled only
I.
for Available Courses)
1. FIRST YEAR & COMMON LAB 35 30
2. CIVIL ENGINEERING 35 30
3. MECHANICAL ENGINEERING 35 30
4. ELECTRICAL & ELECTRONICS 35 30
5. ELECTRONICS & COMMUNICATION 35 30
6. COMPUTER ENGINEERING 35 30
7. INFORMATION TECHNOLOGY 35 30
8. AUTOMOBILE ENGINEERING 35 30
9. MARINE ENGINEERING 35 30
10. MECHATRONICS 35 30
2. Administrative Area :
3. Amenities Area :
5. Essential Requirements :
7. EQUIPMENT :-
(j) Mechatronics
(k)
Date of Inspection : -- --
Time of Inspection
Signature
Name & Designation of Convenor :
Certified that
1 The originals of all relevant Documents, Registers and Records as mentioned above have
. been verified by us and found to be correct.
2 The details regarding the six parameter viz., Principal, Faculty & Staff requirements,
. Library, Equipment’s, Academic Infrastructure and General Essential Facilities have been
personally verified by us and found to be correct.
3 Certified that the Deficiencies reported by the Inspection Committee during the previous
. year have been verified by us.
I. FIRST YEAR & GENERAL / COMMON LABORATORIES [COMMON FOR ALL BRANCHES]
No. of Equipment
indicated in Section
Maximum Marks
NOT in working
Marks Secured
(Refer Guidelines
condition
RATIO =
10 above)
S.
List of Equipments
No
TOTAL MARKS -- -- -- -- 40
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
6. POTENTIOMETER SETUP - 4 5
TOTAL MARKS -- -- -- 50
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
Maximum
Available
Required
Marks
S.
Computer Facilities éMax.Marks x Available ù AICTE NORMS
No ê ú
ë Re quired û
1.
Computers [S] -
10
Total Sanctioned intake ÷6
[One Computer for every 6
students]
Multimedia
Computers – Library / 1% of Total Students Intake
2.
Internet Surfing in
02
[Max. 10]
Reading room
Computers -
3. For Faculty Members 02
Exclusive - along with LAN and
Computers - Internet over and above the
requirement meant for students
4. For Administrative 02
Office
Legal Application
Software including
9.
MS Office / Open
05 20
Office
10. UPS – 10 KVA 02 01
TOTAL MARKS : 40
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
I. CIVIL ENGINEERING
II (a). CIVIL - THIRD SEMESTER – MATERIAL TESTING LAB PRACTICE I
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
S.
List of Equipments No. of
No
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
III (a). MECHANICAL - THIRD SEMESTER - MECHANICAL TESTING & QUALITY CONTROL
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
TOTAL MARKS: -- -- -- -- 55
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
TOTAL MARKS: -- -- -- -- 20
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
III (e). MECH. - IV SEM. – METROLOGY & MEASUREMENT AND MACHINE TOOL TESTING
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
5. Slip Gauge 2 02
6. Inside Micrometer 0.01mm 3 03
accuracy
7. Bevel protractor 2 02
8. Gear Tooth Vernier caliper 2 02
9. Thread Micrometer 0.01mm 2 02
accuracy
10. Pitch gauge mm & inch set 2 each 04
11. Digital Micrometer 0.001mm 2 02
accuracy
12. Vernier Depth gauge 2 02
13. Sample Specimen as -- -- -- --
required
14. Magnetic stand with dial 6 06
indicator
15. Straight edge 2 04
16. Squares 2 04
17. Split level 6 06
18. Test Mandrels for each Adeq. -- -- -- --
machines
TOTAL MARKS: -- -- -- -- 55
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
TOTAL MARKS: -- -- -- -- 53
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipment
No
Maximum Marks
Equipment NOT
Section 10 above)
Marks Secured
(Refer Guidelines
in working
indicated in
condition
Available
Required
Quantity
Quantity
RATIO =
No. of
S.
List of Equipment
No
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
TOTAL MARKS: -- -- -- -- 80
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
4. LINUX Server OS 1 no 10
5. Linux Client OS 36 Nos 18
TOTAL MARKS: -- -- -- -- 167
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
VI (g). COMPUTER ENGG. – FOURTH SEMESTER – COMMUNICATION AND LIFE SKILL LAB
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
Section 10 above)
Marks Secured
(Refer Guidelines
Equipment
indicated in
Maximum
condition
Available
Required
Quantity
Quantity
RATIO =
Marks
No. of
S.
List of Equipments
No
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
VIII (a). AUTOMOBILE - THIRD SEMESTER – MECHANICAL TESTING & QUALITY CONTROL
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
S. No. of
List of Equipments
No
TOTAL MARKS: -- -- -- -- 20
VIII (d). AUTOMOBILE - FOURTH SEMESTER – HEAT POWER ENGINEERING PRACTICAL indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
Maximum Marks
Equipment NOT
Section 10 above)
Marks Secured
(Refer Guidelines
in working
indicated in
condition
Available
Required
Quantity
Quantity
RATIO =
No. of
S.
List of Equipments
No
TOTAL MARKS: -- -- -- -- 20
Section 10 above)
Marks Secured
(Refer Guidelines
in working
indicated in
condition
Available
Required
Quantity
Quantity
RATIO =
No. of
S.
List of Equipments
No
1. DC ammeter 0-5A 1 no 01
2. DC ammeter 0-25A 1 no 01
3. DC voltmeter 0-30V 1 no 01
4. DC voltmeter 0-300V 1 no 01
5. Rheostat 10.8 ,8.5A 1 no 01
6. AC ammeter 0-5A 1 no 01
7. AC ammeter 0-10A 2 nos 02
8. AC voltmeter 0-50V 3 nos 03
9. AC wattmeter 5A-10A 3 nos 03
(0-750W, 0-600V)
10. Loading rheostat 5A,230V 1 no 01
11. Tachometer-Analog 0-1000 1 no 01
rpm
12. Variac (Auto Transformer) 2 nos 02
20A, 250V
13. 3 point starter 20A, 220V 1 no 01
14. Dol starter 16A, 415V 1 no 01
15. Star /Delta starter 20A,600V 1 no 01
16. Over load relay 1 to 2.5A 1 no 01
17. Air break contactors 20A, 220V 4 nos 04
18. Push button 2A ,220V 2 nos 02
19. Limit switch 20A,220V 1 no 01
20. MCB 20A single pole 1 no 01
21. MCB 20A double pole 1 no 01
22. ELCB 2pole 20A,100mA 1 no 01
23. ELCB 4POLE 20A,100mA 1 no 01
ELECTRONICS LAB
1. Transformer 230/ 9-0-9V, 1A 4 nos 04
2. Resistor 1 K/ ½ W 3 nos 03
3. Capacitor 1000 F/25V 4 nos 04
4. IC 7805 1 no 01
5. Logic Gates IC 7400, 7408, each 1 01
7432, 7404, 7402, 7486 no
6. Stepper Motor Drive kit 1 no 01
7. Servo Motor Drive Kit 1 no 01
8. SMPS Trainer Kit 1 no 01
9. UPS Trainer Kit 1 no 01
10. Inverter Kit 1 no 01
11. Digital Multimeter 1 no 01
12. LED 7Segment Laser Diode 1 each 01
TOTAL MARKS: -- -- -- -- 53
X. MECHATRONICS
X (a). MECHATRONICS - THIRD SEMESTER – ELECTRONIC DEVICES AND CIRCUITS
PRACTICAL
Quantity Available
Quantity Required
No. of Equipment
indicated in Section
Maximum Marks
NOT in working
Marks Secured
(Refer Guidelines
condition
RATIO =
10 above)
S.
List of Equipments
No
No. of Equipment
indicated in Section
Maximum Marks
NOT in working
Marks Secured
(Refer Guidelines
condition
RATIO =
10 above)
S.
List of Equipments
No
No. of Equipment
indicated in Section
Maximum Marks
NOT in working
Marks Secured
(Refer Guidelines
condition
RATIO =
10 above)
S.
List of Equipments
No
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
Quantity Available
Quantity Required
No. of Equipment
indicated in Section
Maximum Marks
NOT in working
Marks Secured
(Refer Guidelines
condition
RATIO =
10 above)
S.
List of Equipments
No
indicated in Section
Maximum Marks
Equipment NOT
Marks Secured
(Refer Guidelines
in working
condition
Available
Required
Quantity
Quantity
RATIO =
10 above)
No. of
S.
List of Equipments
No
Section 10 above)
Marks Secured
(Refer Guidelines
in working
indicated in
Maximum
condition
Available
Required
Quantity
Quantity
RATIO =
S.
Marks
No. of
List of Equipments
No
1 Civil 60 60
2 Mechanical 60 180
3 EEE 60 60
4 ECE 60 60
5 Automobile 60 60
TOTAL INTAKE 300 420
No. of Divisions 5 7
No. of Courses 5 5