Annex 5 Bibliography

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Annex 5: Bibliography

AECOM TC, Faber Maunsell ltd., Frontier Economics, RGL Forensics. (2009).WP 10: Efficiency: Unit costs of
major projects - Final Report.
AECOM TC, KPMG Ltd.(2016). Ex post evaluation of Cohesion Policy programmes 2007-2013, focusing on the
European Regional Development Fund (ERDF) and the Cohesion Fund (CF) - Final Report.
AECOM TC, KPMG Ltd.(2016). WP 5 - Ex post evaluation of Cohesion Policy programmes 2007-2013, focusing
on the European Regional Development Fund (ERDF) and the Cohesion Fund (CF) - Major projects case
studies.
Andresen T., Paaske B. J. (2002). Safety in Railway Tunnels and Selection of Tunnel Concept.
Andresen T., Paaske B. J., (2002). Safety in Railway Tunnels and Selection of Tunnel Concept.
Atkins plc, Frontier Economics, University of Leeds. (2011). WP B: Cost-benefit analysis of selected transport
projects - Final Report.
Banedenmark. (2017). The Danish Signalling Programme - where are we now?
Barton N. (1994). A Q-System Case Record Cavern Design Faulted Rock. Tunnelling Difficult Conditions.
Barton N. (1999). TBM performance estimation in rock using Q(TBM). Tunnels and Tunnelling International.
31. 30-34.
Barton N. (2012). Reducing risk in long deep tunnels by using TBM and drill-and-Blast methods in the same
project-the hybrid solution.
Baumgartner J.P., Ecole Polytechnique federale de Lausanne. (2001). Prices and Costs in the Railway Sector.
Best R, Meikle J (2015) Measuring Construction: Prices, Output and Productivity
Bickel. (1995). Tunnel engineering handbook, 2nd edition.
Bieniawski von Preinl Z.T., Celada Tamames B., Galera Fernández M.J. & Hernández Álvarez M. (2006). Rock
Mass Excavability (RME) indicator: New way to selecting the optimum tunnel construction method. Tunnelling
and Underground Space Technology - TUNN UNDERGR SPACE TECHNOL. 21. 237-237.
Bieniawski Z.T. (1989). Engineering rock mass classifications.
Bocabarteille A., (2012). Geotechnical Site Characterisation of the Perthus Tunnel.
Calçada R, Delgado R, Campos A e Matos. (2004). Bridges for High-speed Railways.
Campos J., de Rus G., Barrón I., (2006). Some stylized facts about high speed rail around the world: an
empirical approach.
Detlef J. (2007). The Brenner Challenge - TBMs versus Drill & Blast in High Cover Conditions. Robbins Europe
GmbH.
Directive 2004/50/EC of the European Parliament and of the Council of 29 April 2004
Directive 2014/24/EU of the European Parliament and of the Council of 26 February 2014 on public
procurement and repealing Directive 2004/18/EC Text with EEA relevance
EC - Directorate-General for Mobility and Transport. (2017). The European Rail Traffic Management System
(Ertms) Deployment Action Plan.
EC memo. (2005). The ERTMS in 10 questions.
Ehrbar H. (2008). Gothard base Tunnel, Switzerland. Experiences with different Tunnelling Methods. 2
Congresso Brasileiro de tuneis e Estructuras Subterraneas.
Ellis K. and Singh R. (2010). The economic impact of competition - Overseas Development Institute, Project
Briefing No 42.
European Commission 2011 WHITE PAPER Roadmap to a Single European Transport Area – Towards a
competitive and resource efficient transport system COM(2011)0144 final
European Commission 2011 WHITE PAPER Roadmap to a Single European Transport Area – Towards a
competitive and resource efficient transport system COM(2011)0144 final
European Commission 2011 WHITE PAPER Roadmap to a Single European Transport Area – Towards a
competitive and resource efficient transport system COM(2011)0144 final
European Commission 2016 Communication to the European Parliament, the Council, the European Economic
and Social Committee and the Committee of the Regions, A European Strategy for Low-Emission Mobility
COM(2016) 501 final
European Commission 2016 Communication to the European Parliament, the Council, the European Economic
and Social Committee and the Committee of the Regions, A European Strategy for Low-Emission Mobility
COM(2016) 501 final
European Commission 2016 DG IPOL, Policy Department B: Structural and Cohesion Policies 2016 Research
for TRAN committee: Connectivity and Accessibility of Transport Infrastructure in Central and Eastern
European EU Member States
European Commission 2016 Ex post evaluation of the ERDF and Cohesion Fund 2007-13, EC, 2016
European Commission 2016 Single market integration and competitiveness report 2016, EC, 2016.
European Commission 2016 Staff Working Document, The implementation of the 2011 White Paper on
Transport “Roadmap to a Single European Transport Area – towards a competitive and resource-efficient
transport system" five years after its publication: achievements and challenges SWD(2016) 226 final
European Commission 2016 Staff Working Document, The implementation of the 2011 White Paper on
Transport “Roadmap to a Single European Transport Area – towards a competitive and resource-efficient
transport system" five years after its publication: achievements and challenges SWD(2016) 226 final
Faramehr S. (2014). Aerodynamic of the Trains in Tunnels - University of Birmingham.
Fundación BBVA. (2009). Economic Analysis of High Speed Rail in Europe.
Furness et al. (2017). ERTMS Level 3: the Game-Changer.
Gattuso D., Restuccia A., (2014). A tool for railway transport cost evaluation.
González Franco I., (2015). Effect of the design speed on the construction cost of the infrastructure.
Hemphill G. B. (2013). Practical Tunnel Construction.
Hoek E. (1994). Strength of rock and rock masses. ISRM News J2:4-16;
Holen, H. (1998). TBM vs Drill & Blast Tunnelling
Italferr S.p.A. (2008). Analyse des investissements ferroviaires algériens, benchmarking et évaluation de la
capacité de production des entreprises nationales - Rapport final.
Jodl, H.G. & Resch, D. (2011). NATM and TBM - comparison with regard to construction operation.
Jovanovski, M., Pancovska V.Z. & Peshevski, I.(2011). ERMR System - an useful tool in defining of technology
for excavation. Organization, Technology and management on construction Int. Journal, 3/2, 302-307.
Kenneth D. Walsh, M.ASCE; Anil Sawhney, A.M.ASCE; and Audrick Brown IV, S.M.ASCE 2005 International
Comparison of Cost for the Construction Sector: Purchasing Power Parity, Journal of Construction Engineering
and Management, vol 131 issue 2, Feb.
Kleine E. G. (2017). ERTMS Deployment/Migration Strategies of ERTMS Users Group members.
Kolymbas, Dimitrios (2005). Tunelling and tunnel mechanics: a rational approach to tunnelling.
Lahiri S. and Ono Y. (2004). Trade and Industrial Policy under International Oligopoly.
Lunardi P. (2008). Design and Construction of Tunnels.
Macias J., Bruland A. (2014). D&B versus TBM: Review of the parameters for a Right Choice of the Excavation
Method.
Ministerio de Fomento. (2010). Boletín Oficial del Estado.
N. Efron, M. Read. (2012). Analysing International Tunnel Costs - An Interactive Qualifying Project.
Nord, G. (2006). TBM versus Drill & Blast, the choice of tunnelling method. International Conference and
Exhibition on Tunnelling and Trenchless Technology.
Palumbo M. (2014). ERTMS/ETCS signalling system - An overview on the Standard Europe an Interoperable
signalling and train control system.
PwC 2016 HS2 Phase Two capital costs against other international high speed rail projects.
PwC. (2015). Study to develop tailor-made solutions for use of innovative financing to support deployment of
ERTMS, in particular along nine core network corridors.
PwC. (2016). High speed rail international benchmarking study.
Pyrgidis C. and Christogiannis E. 2012 The problems of the presence of passenger and freight trains on the
same track, Transport Research Arena. Procedia - Social and Behavioral Sciences 48 ( 2012 ) 1143 – 1154
Rock Mass Zone (RMZ), ISRM - Int. J. Rock Mech. Min. Sc. And geomech. Abst., 15, 319-368.
Romanian government. (2010). Decision No. 1394 of 28 December 2010
Shafahi Y., Shahbazi M.J. (2010). Optimum railway alignment.
Steer Davies Gleave (2015) Study on the Cost and Contribution of the Rail Sector European Commission
Directorate General for Mobility and Transport
Stewart, P. et al., (2006). Bench-mark Drill & Blast and Mechanical Excavation Advance Rates for Underground
Hard-Rock Mine Development.
Subhash C. Sagar, Yogesh Verma, IRICEN University. (2007). Case Studies - High Speed Rail System (> 250
KMPH).
Trabo I., et al. Technical University of Denmark. (2013). Cost benchmarking of railway projects in Europe - can
it help to reduce costs?
Transport Research Laboratory. (2010). Final report: ERTMS Level 3 Risks and benefits to UK Railways.
Tsamboulas D., (2014), Estimating and Benchmarking Transport Infrastructure Costs.
UIC. (2008). ETCS Implementation Handbook.
UIC. (2009). GSM-R Procurement & Implementation Guide.
United Nations - Inland Transport Committee. (2003). Recommendations of the Multidisciplinary Group of
Experts on Safety in Tunnels (Rail)
VINCI Concessions sas. (2009). HS2 - SEA Comparison.

You might also like