BMS COMMISSIONING PLAN

Steps in planning a BMS T&C

Point to point
QA/QC Point to Graphic Function Test Software Function
(Contractor Internal)

Panel and wiring check Must do: All points including: Must be: At least:

Quantity and type Programing DI SOO verification (pau, Trendlog (Excel, Graphic)
Mechanical check Configuration DO chiller, fan, ahu..) Alarm (3 level with colors)
Electrical check Point to point check AI PID verification Schedule
Label check DO Intergration (If any) Reports
HIGH LEVEL INTERFACE Back up, restore

LEVEL 2 LEVEL 2 LEVEL 3 LEVEL 4 LEVEL 4