Pecc3 would like to clarify some related content.

1. The layout of the report content for inclusion in the National Power
Development Plan proposed by Pecc3 is consistent with what Pecc3 has done
before with other projects. For this project, pecc3 only focuses on analyzing
and calculating the grid system. Based on the information provided by HW,
pecc3 will edit it to suit the required content of the profile. Again, pecc3
emphasizes that this is a project included in the National Power Development
Plan, not a feasibility study document. The main content of the report is to
calculate the regional grid system with the participation of the waste
incinerator power plant. Other content is generally introduced for the purpose
of providing relevant information
2. The RACI table issued by pecc3 is for the purpose of defining internal
responsibilities in pecc3, when coordinating with stakeholders, we will
establish a new assignment of responsibilities before implementation.
3. Relating to land use needs: This document can be used to apply for
investment policies and issue investment certificates. Therefore, determining
the land use demand right now is necessary and beneficial for the Investor
during the project initialization process. The conversion of existing land use
to energy use is a component of the investment law. pecc3 recommends
including the dossier if we have the information by now.
Scope of work
Contents Responsibili Responsibility Comment of HW PECC3’s opinions
ty of of HW
PECC3
CHAPTER 1: OVERVIEW
If this must be local legal basis, PECC3 will provide a legal list
1.1 LEGAL BASIS A+C+R - suggest to let PECC3 provide related to the project and Alpha
this will support
1.2 WASTE ENERGY OVERVIEW Edited to suit the requirements
A+C R x
of the report
1.3 CURRENT SITUATION OF
Edited to suit the requirements
WASTE ENERGY GENERATION IN A+C R x
of the report
SOC TRANG PROVINCE
1.4 STUDIES ON POTENTIAL
Edited to suit the requirements
WASTE ENERGY IN SOC TRANG A+C R x
of the report
PROVINCE AND VIETNAM
CHAPTER 2: NECESSITY OF PROJECT
2.1 PROJECT LOCATION Edited to suit the requirements
A+C R x
of the report
2.2 DEMAND OF POWER SUPPLY
A+C+R -
IN AREA
2.3 CURRENT SITUATION OF
LOCAL POWER SOURCES AND A+C+R -
GRID To be generated by PECC3 Agree
2.4 PLAN OF DEVELOPING POWER
A+C+R -
GENERATION AND POWER GRID
2.5 THE NECESSITY OF PROJECT
A+C+R -
INVESTMENT
CHAPTER 3: NATURAL CONDITION IN PROJECT AREA
3.1 THE NATURAL AND SOCIO-
ECONOMIC FEATURES IN A+C R Pecc3 will check this info in
PROJECT AREA HW’s FS report. if info is
Please check if all required info
3.2 TOPOGRAPHIC CONDITIONS A+C R unavailable, we will follow our
has been incorporated already
3.3 GEOLOGICAL CONDITIONS A+C R experience
3.4 HYDRO-METEOROLOGICAL
A+C R
CONDITIONS
CHAPTER 4: EVALUATION ON BIOMASS ENERGY POTENTIAL
4.1 BIOMASS ENERGY POTENTIAL Because this is an additional
Why required in this report?
IN VIETNAM planning report so it will be
4.2 BIOMASS ENERGY POTENTIAL necessary to clarify the
IN SOC TRANG
A+C R x potential of biomass energy in
Vietnam. Besides, according to
PECC3’s experience in
4.3 BIOMASS ENERGY POTENTIAL additional planning report
IN PROJECT AREA
A+C R x structure, there must be a
chapter be called: “Evaluation
energy potential”.
CHAPTER 5: ANALYSIS ON TECHNOLOGICAL AND TECHNICAL SOLUTIONS
5.1 THE ASSESSMENT AND
SELECTION OF APPLIED A+C R x Agree
TECHNOLOGY
5.2 SELECTION OF INSTALLED
CAPACITY AND PLANT’S A+C R x Agree
ARRANGEMENT
5.3 PROPOSED GENERATOR TYPES A+C R x Agree
5.4 GRID CONNECTION PLAN A+C+R - To be generated by PECC3 Agree
Operation mode belongs to the
5.5 OPERATION MODE A+C+R - What are requirements? selected technology of the
plant. HW support.
Maintenance method belongs
5.6 MAINTENANCE METHOD A+C+R - What are requirements? to the selected technology of
the plant. HW support.
CHAPTER 6: INVESTMENT SCALE AND PROJECT LOCATION
6.1 INVESTMENT SCALE Plant + substation +
Transmission line pecc3 will be
A+C R x coordinated with HW to make
preliminary scale
6.2 WORK ITEMS A+C R x Agree
6.3 PROJECT LOCATION AND
DEMAND ON USING LAND
A+C R x Agree
6.4 PRELIMINARY GENERAL PLAN We believe this is not required Agree
ON COMPENSATION, SUPPORT A+C+R - because the project site does
AND RESETTLEMENT not required resettlement
CHAPTER 7: ENVIRONMENTAL IMPACT ASSESSMENT ON BIOMASS ENERGY
7.1 POSITIVE IMPACTS TO A+C R
ENVIRONMENT Pecc3 will check this info in
7.2 NEGATIVE IMPACTS TO A+C R HW’s FS report. if info is
Please check if all required info
ENVIRONMENT unavailable, we will follow our
has been incorporated already
7.3 IMPACT MITIGATION A+C R experience
SOLUTIONS
7.4 CONCULSION A+C R
CHAPTER 8: CONSTRUCTION ORGANIZATION
8.1 EQUIPMENT AND R Normally, foreign-
MATERIAL SUPPLY invested projects should
orient and transparent
information about
A+C What are requirements?
equipment manufacturers
when they are brought into
Vietnam for use
(recommend)
8.2 SITE CLEARANCE (IF
A+C+R - What are requirements? For substation and TL
ANY)
8.3 MANNER OF EXECUTION A+C R x Agree
8.4 PROJECT SCHEDULE A+C R x Agree
CHAPTER 9: TOTAL INVESTMENT AND CAPITAL
9.1 COST ESTIMATION A+C R x Agree
9.2 CAPITAL INVESTMENT A+C R x Agree
CHAPTER 10: INVESTMENT EFFECTIVENESS
10.1 GENERAL A+C+R
- What are requirements?
METHODOLOGY
10.2 PRELIMINARY DATA A+C+R
- What are requirements?
AND ASSUMPTIONS Related to environmental
10.3 CALCULATION RESULTS A+C+R - What are requirements? benefits and indicators for
10.4 OTHER BENEFIT A+C+R - What are requirements? renewable energy projects
10.5 PRELIMINARY A+C+R (HW support if any)
ASSESSMENT ON POTENTIAL - What are requirements?
CDM
10.6 CONCLUSION A+C+R - What are requirements?
CHAPTER 11: OPERATION ORGANIZATION AND POLICY MECHANISM
11.1. OPERATION
A+C R x Agree
ORGANIZATION
11.2. POLICY MECHANISM A+C R x Agree
CHAPTER 12: CONCLUSION AND RECOMMENDATION
12.1. CONCLUSION A+C+R - x Agree
12.2. RECOMMENDATION A+C+R - x Agree
ANNEX AND DRAWINGS
1. TECHNICAL CACULATION
A+C R x Pecc3 (*)
(ANNEX)
2. PROJECT POSITION A+C R x Agree
3. GENERAL LAYOUT A+C R x Agree
4. SINGLE-LINE DIAGRAM OF
A+C+R - x Agree
EXISTING GRID
5. SINGLE-LINE DIAGRAM OF
GCP FOR THE PROJECT AND A+C+R - x Agree
ORTHER DRAWINGS
(*) HW considers this item.
Technical calculation (annex) includes:
- Local and Province Level Single Line Diagram illustrating electrical parameters (voltage and power
flow) under various contingencies.
- Review and opinion on the situation of the power system Detailed reporting about system stability,
transmission overloading, and electrical losses. Calculate steady state power flow study models including
contingency files (PSS/e software).
- Load flow analysis under various interconnection scenarios, power demand and supply growth scenarios,
and contingencies (Normal and N-1).
- Recommendations to optimize system stability and losses and minimize grid curtailment risk.
- Etc.