CONSTRUCTION DRAWINGS

LIST DRAWING STRUCTURE


SIZE STATUS
NO. DRAWING NUMBER DRAWING TITLE DRAWING
DRAWING

1 RASB-21(14)DEWANP-6/STR/CN/CV/0.0 COVER DRAWING A3 CONSTRUCTION


2 RASB-21(14)DEWANP-6/STR/CN/LIST/0.1 LIST OF DRAWING A3 CONSTRUCTION

GENERAL NOTE
3 RASB-21(14)DEWANP-6/STR/CN/GN/1.0 GENERAL NOTES - (SHEET 1 OF 3) A3 CONSTRUCTION
4 RASB-21(14)DEWANP-6/STR/CN/GN/1.1 GENERAL NOTES - (SHEET 2 OF 3) A3 CONSTRUCTION
5 RASB-21(14)DEWANP-6/STR/CN/GN/1.2 GENERAL NOTES - (SHEET 3 OF 3) A3 CONSTRUCTION

GROUND FLOOR CADANGAN KERJA-KERJA MEMBINA SEBUAH


DEWAN TERBUKA SERTA KERJA-KERJA YANG
BERKAITAN DI SEKOLAH RENDAH AGAMA
6 RASB-21(14)DEWANP-6/STR/CN/GF/LAY/2.0 GROUND FLOOR PLAN, PAD FOOTING AND COLUMN SCHEDULE, TYPICAL DETAIL, BASE PLATE DETAIL. A3 CONSTRUCTION KANCHONG DARAT, BANTING SELANGOR DARUL
EHSAN.

UNTUK:
ROOF PLOOR PERBADANAN KEMAJUAN NEGERI SELANGOR

7 RASB-21(14)DEWANP-6/STR/CN/RF/LAY/3.0 ROOF FLOOR PLAN, DETAIL AND SECTION A3 CONSTRUCTION


8 RASB-21(14)DEWANP-6/STR/CN/RF/DET/3.1 T-1 & T-2, TYPICAL DETAIL AND TYPICAL SECTION A3 CONSTRUCTION
9 RASB-21(14)DEWANP-6/STR/CN/RF/DET/3.2 T-3, T-4, L.C1 & L.C2, TYPICAL DETAIL AND TYPICAL SECTION A3 CONSTRUCTION

PERBADANAN KEMAJUAN NGERI


SELANGOR
(PKNS)

PERUNDING C&S :

SYARIKAT ;

TAJUK PELAN:

LIST OF DRAWING

RASB-21(18)DEWANP-6/STR/CN/LIST/0.1
BIL. FAIL:
SKALA :
DIREKA BENTUK :
DIHITUNG/UKUR OLEH :
DILUKIS OLEH : TARIKH:
ISSUE DATE DISEMAK OLEH :

SEMUA UKURAN MESTI DISEMAK DI ATAS TAPAK. HANYA UKURAN YANG DICATITKAN
SAHAJA PERLU DIGUNAKAN. SEBARANG SELISIH HENDALAH DILAPORKAN DENGAN
SEGERA KEPADA JURUTERA.
CONSTRUCTION DRAWINGS

NOTES :- STEEL STRUCTURE WORK FOUNDATION WORKS


GENERAL

CADANGAN KERJA-KERJA MEMBINA SEBUAH


DEWAN TERBUKA SERTA KERJA-KERJA YANG
BERKAITAN DI SEKOLAH RENDAH AGAMA
KANCHONG DARAT, BANTING SELANGOR DARUL
EHSAN.

UNTUK:
PERBADANAN KEMAJUAN NEGERI SELANGOR

CONCRETE

PERBADANAN KEMAJUAN NGERI

STEEL REINFORCEMENT SELANGOR


(PKNS)

PERUNDING C&S :

SYARIKAT ;

TAJUK PELAN:

GENERAL NOTES
(SHEET 1 OF 3)

RASB-21(18)DEWANP-6/STR/CN/GN/1.0
BIL. FAIL:
SKALA :
DIREKA BENTUK :
DIHITUNG/UKUR OLEH :
ISSUE DATE DILUKIS OLEH : TARIKH:
DISEMAK OLEH :

SEMUA UKURAN MESTI DISEMAK DI ATAS TAPAK. HANYA UKURAN YANG DICATITKAN
SAHAJA PERLU DIGUNAKAN. SEBARANG SELISIH HENDALAH DILAPORKAN DENGAN
SEGERA KEPADA JURUTERA.
CONSTRUCTION DRAWINGS

230

230

230

115

CADANGAN KERJA-KERJA MEMBINA SEBUAH


DEWAN TERBUKA SERTA KERJA-KERJA YANG
BERKAITAN DI SEKOLAH RENDAH AGAMA
KANCHONG DARAT, BANTING SELANGOR DARUL
EHSAN.

UNTUK:
PERBADANAN KEMAJUAN NEGERI SELANGOR

PERBADANAN KEMAJUAN NGERI


SELANGOR
(PKNS)

PERUNDING C&S :

SYARIKAT ;

TAJUK PELAN:

GENERAL NOTES
(SHEET 2 OF 3)
RASB-21(18)DEWANP-6/STR/CN/GN/1.1
BIL. FAIL:
SKALA :
ISSUE DATE DIREKA BENTUK :
DIHITUNG/UKUR OLEH :
DILUKIS OLEH : TARIKH:
DISEMAK OLEH :

SEMUA UKURAN MESTI DISEMAK DI ATAS TAPAK. HANYA UKURAN YANG DICATITKAN
SAHAJA PERLU DIGUNAKAN. SEBARANG SELISIH HENDALAH DILAPORKAN DENGAN
SEGERA KEPADA JURUTERA.
CONSTRUCTION DRAWINGS
0.33L

50 50 50 50 50

h
50 50 50 50 50

h
50
<200mm

CADANGAN KERJA-KERJA MEMBINA SEBUAH


DEWAN TERBUKA SERTA KERJA-KERJA YANG
BERKAITAN DI SEKOLAH RENDAH AGAMA
KANCHONG DARAT, BANTING SELANGOR DARUL
EHSAN.

UNTUK:
0.5t + 12Ø
PERBADANAN KEMAJUAN NEGERI SELANGOR

115 or 150

>=200mm

75 or 100 L
>=300

PERBADANAN KEMAJUAN NGERI


SELANGOR
300 min

300 min

300 min
(PKNS)

800 800
25

PERUNDING C&S :
50

SYARIKAT ;

TAJUK PELAN:

GENERAL NOTES
(SHEET 3 OF 3)
RASB-21(18)DEWANP-6/STR/CN/GN/1.2
BIL. FAIL:

ISSUE DATE SKALA :


DIREKA BENTUK :
DIHITUNG/UKUR OLEH :
DILUKIS OLEH : TARIKH:
DISEMAK OLEH :

SEMUA UKURAN MESTI DISEMAK DI ATAS TAPAK. HANYA UKURAN YANG DICATITKAN
SAHAJA PERLU DIGUNAKAN. SEBARANG SELISIH HENDALAH DILAPORKAN DENGAN
SEGERA KEPADA JURUTERA.
CONSTRUCTION DRAWINGS

BILIK DARJAH

27° 43' 50"


21.380 LIMIT OF WORK

GARAJ

TAPAK CADANGAN
857 mp

³
JALAN PARIT 6

CADANGAN KERJA-KERJA MEMBINA SEBUAH


HENTIAN BAS

DEWAN TERBUKA SERTA KERJA-KERJA YANG


BERKAITAN DI SEKOLAH RENDAH AGAMA
KANCHONG DARAT, BANTING SELANGOR DARUL
EHSAN.

UNTUK:
PERBADANAN KEMAJUAN NEGERI SELANGOR

GL
297° 28' 00" 40.446

117° 49' 30" 40.181


APRON
PERBADANAN KEMAJUAN NGERI
LIMIT OF WORK

GL SELANGOR
(PKNS)

50
LIMIT OF WORK

AREA EXISTING SLAB


TO BE DEMOLISHED
AND TO CONSTRUCT
NEW SLAB 200mm THK.
BILIK DARJAH PERUNDING C&S :

SYARIKAT ;
APRON

TAJUK PELAN:
GROUND FLOOR PLAN
21.130 PAD FOOTING SCHEDULE, COLUMN SCHEDULE
207° 00' 40" LIMIT OF WORK TYPICAL DETAIL, BASE PLAT DETAIL

RASB-21(18)DEWANP-6/STR/CN/GF/LAY/2.0
BIL. FAIL:

PONDOK BILIK DARJAH


SKALA :
DIREKA BENTUK :
ISSUE DATE DIHITUNG/UKUR OLEH :
DILUKIS OLEH : TARIKH:
DISEMAK OLEH :

SEMUA UKURAN MESTI DISEMAK DI ATAS TAPAK. HANYA UKURAN YANG DICATITKAN
SAHAJA PERLU DIGUNAKAN. SEBARANG SELISIH HENDALAH DILAPORKAN DENGAN
SEGERA KEPADA JURUTERA.
CONSTRUCTION DRAWINGS
TAPAK CADANGAN
857 mp
HENTIAN BAS

297° 28' 00" 40.446

117° 49' 30" 40.181


CADANGAN KERJA-KERJA MEMBINA SEBUAH
DEWAN TERBUKA SERTA KERJA-KERJA YANG
BERKAITAN DI SEKOLAH RENDAH AGAMA
KANCHONG DARAT, BANTING SELANGOR DARUL
EHSAN.

UNTUK:
PERBADANAN KEMAJUAN NEGERI SELANGOR
LIMIT OF WORK

LIMIT OF WORK
PERBADANAN KEMAJUAN NGERI
SELANGOR
(PKNS)

BILIK DARJAH

PERUNDING C&S :

SYARIKAT ;

21.130 TAJUK PELAN:

207° 00' 40" LIMIT OF WORK ROOF PLAN


DETAIL & SECTION

RASB-21(18)DEWANP-6/STR/CN/RF/LAY/3.0
BIL. FAIL:

PONDOK BILIK DARJAH


SKALA :
DIREKA BENTUK :
DIHITUNG/UKUR OLEH :
DILUKIS OLEH : TARIKH:
ISSUE DATE DISEMAK OLEH :

SEMUA UKURAN MESTI DISEMAK DI ATAS TAPAK. HANYA UKURAN YANG DICATITKAN
SAHAJA PERLU DIGUNAKAN. SEBARANG SELISIH HENDALAH DILAPORKAN DENGAN
SEGERA KEPADA JURUTERA.
CONSTRUCTION DRAWINGS

ROOF LEV.

438.4597
CEILING LEV.

VOID

³
CADANGAN KERJA-KERJA MEMBINA SEBUAH
DEWAN TERBUKA SERTA KERJA-KERJA YANG
BERKAITAN DI SEKOLAH RENDAH AGAMA
GRD. FLOOR LEV. KANCHONG DARAT, BANTING SELANGOR DARUL
EHSAN.
200

UNTUK:
PERBADANAN KEMAJUAN NEGERI SELANGOR

TABLE C : RAINWATER TANK NO 1, & 2 AT MAIN BUILDING

ROOF LEV.
PERBADANAN KEMAJUAN NGERI
SELANGOR
(PKNS)

CEILING LEV.

MIN. WATER LEVEL

PERUNDING C&S :

SYARIKAT ;
VOID

TAJUK PELAN:
T - 1 & T-2
TYPICAL DETAILS
TYPICAL SECTIONS
GRD. FLOOR LEV. RAIN WATER HARVESTING SYSTEM DETAIL
200

RASB-21(18)DEWANP-6/STR/CN/RF/DET/3.1
MIN. WATER LEVEL
BIL. FAIL:
SKALA :
DIREKA BENTUK :

ISSUE DATE DIHITUNG/UKUR OLEH :


DILUKIS OLEH : TARIKH: 2021
DISEMAK OLEH :

SEMUA UKURAN MESTI DISEMAK DI ATAS TAPAK. HANYA UKURAN YANG DICATITKAN
SAHAJA PERLU DIGUNAKAN. SEBARANG SELISIH HENDALAH DILAPORKAN DENGAN
SEGERA KEPADA JURUTERA.
CONSTRUCTION DRAWINGS
ROOF LEV.

CEILING LEV.

VOID

VOID

GRD. FLOOR LEV.

200
CADANGAN KERJA-KERJA MEMBINA SEBUAH
DEWAN TERBUKA SERTA KERJA-KERJA YANG
BERKAITAN DI SEKOLAH RENDAH AGAMA
KANCHONG DARAT, BANTING SELANGOR DARUL
EHSAN.

UNTUK:
PERBADANAN KEMAJUAN NEGERI SELANGOR

PERBADANAN KEMAJUAN NGERI


SELANGOR
(PKNS)

PERUNDING C&S :

SYARIKAT ;

TAJUK PELAN:
T-3, T-4, L.C 1 & L.C 2
TYPICAL DETAILS
TYPICAL SECTIONS
RASB-21(18)DEWANP-6/STR/CN/RF/DET/3.2
BIL. FAIL:
SKALA :
DIREKA BENTUK :
ISSUE DATE DIHITUNG/UKUR OLEH :
DILUKIS OLEH : TARIKH:
DISEMAK OLEH :

SEMUA UKURAN MESTI DISEMAK DI ATAS TAPAK. HANYA UKURAN YANG DICATITKAN
SAHAJA PERLU DIGUNAKAN. SEBARANG SELISIH HENDALAH DILAPORKAN DENGAN
SEGERA KEPADA JURUTERA.

You might also like