Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

STATEMENT OF EXCLUSIVITY AND AVAILABILITY

FRAMEWORK CONTRACT SERVICES FOR THE IMPLEMENTATION OF EXTERNAL AID (SIEA) 2018

Request for services: SIEA-2018-302 (Ref. Ares(2020)2228082)


Title: ASSISTANCE TECHNIQUE À LA DIRECTION DES INFRASTRUCTURES DE LA DATC-C/UEMOA
POUR LA RÉALISATION D’ÉTUDES TECHNIQUES: Évaluation du patrimoine du réseau routier
communautaire de l’UEMOA et Financement innovant pour la préservation et le développement dudit
patrimoine routier

I, the undersigned, hereby declare that I agree to participate exclusively with the framework contractor
SAFEGE (SUEZ Consulting) in the above-mentioned request for services under framework contract SIEA
2018. This includes that I will not be proposed as a replacement expert in this request. I declare that I am able
and willing to work for the period(s) set for the position for which my CV has been included if this offer is
successful, namely:

From To Availability
01/05/2021 31/12/2021 part time

I confirm that I do not have a confirmed engagement as key expert in another EU/EDF-funded project, or any
other professional activity, incompatible in terms of capacity and timing with the above engagements.

By making this declaration, I understand that I am not allowed to offer my services as an expert to any other
framework contractor participating in this request for services. I am fully aware that if I do so, I will be excluded
from this request for services, the will be rejected, and I may also be subject to exclusion from other tender
procedures and contracts funded by the EU/EDF.

Furthermore, should this offer be accepted, I am fully aware that if I am not available at the expected start date
of my services for reasons other than those beyond my control, I may be subject to exclusion from other tender
procedures and contracts funded by the EU and that the notification of award of specific contract to the
framework contractor may be rendered null and void.

I also declare that I am not in a situation of conflict of interest or unavailability and commit to inform the
framework contractor of any change in my situation.

I acknowledge that I have no contractual relations with the Contracting Authority and in case of dispute
concerning my contract with the Contractor I shall address myself to the latter and/or to the competent
jurisdictions.

For information, I have signed a Statement of Exclusivity and Availability for the following tender(s):

Tender reference Tender submission deadline Tendered engagement


tender/request for services date [full time] [part time]
tender/request for services date [full time] [part time]
etc.

Should I receive a confirmed engagement I declare that I will accept the first engagement offered to me
chronologically. Furthermore, I will notify the framework contractor immediately of my unavailability.

Name Cheikh DIEYE


Signature

Date 28/04/2021

You might also like