Detail of Open Cable Loops Laying on Surface at Airside ( from Month- July 2023 to till date)

Length of Loop
SI No Date Circuit Name From fitting No. To fitting No. Remark
(in metres)

1 60 24/1 25/1
Runway Edge
11 January 2024 Loop need to be buried
circuit 1
2 30 25/1 26/1

3 30 120/1 121/1 Loop need to be buried


4 Runway Edge 30 121/1 122/1 Loop need to be buried
20 December 2023
5 circuit 1 60 41/1 42/1 Excavation of Open cable loop is done
6 90 84/1 85/1 Excavation of Open cable loop is done
7 30 40/3 41/3 Loop need to be buried
30 October 2023 RCL circuit 3
8 30 56/3 57/3 Loop need to be buried
9 22 October 2024 RCL circuit 3 320 chamber 1/3 Loop need to be buried
10 12 October 2023 RCL circuit 3 20 20/3 21/3 Loop need to be buried
11 RCL circuit 2 212 81/2 82/2
25 September 2023 Loop need to be buried ( Near D/E taxi crossing)
12 RCL circuit 4 190 80/4 81/4
Threshold inset 1st
13 85 135/2 Loop need to be buried
Runway Edge fitting chamber
12 September 2023
14 circuit 2 85 136/2 144/2 Loop need to be buried
15 85 64/2 67/2 Loop need to be buried
16 RCL circuit 4 30 80/4 81/4 Loop need to be buried
11 September 2023 Runway Edge
17 30 41/2 42/2 Loop need to be buried
circuit 2
18 D/E taxi edge 60 52/2 53/2
19 August 2023 Loop need to be buried
19 circuit 2 60 53/2 54/2
Runway Edge
20 13 August 2023 90 41/2 42/2 Excavation of Open cable loop is done
circuit 2
Runway Edge
21 11 August 2023 90 67/2 68/2 Excavation of Open cable loop is done
circuit 2
Runway Edge
22 10 August 2023 90 24/2 25/2 Loop need to be buried
circuit 2
23 Runway Edge 90 5/2 6/2 Loop need to be buried
22 July 2023
24 circuit 2 90 6/2 7/2 Loop need to be buried
Runway Edge
25 14 July 2023 90 1/2 2/2 Loop need to be buried
circuit 2
Runway Edge
26 07 July 2023 90 23/1 24/1 Loop need to be buried
circuit 1