Professional Documents
Culture Documents
Emergency Pump Handling
Emergency Pump Handling
P UMP R ETRACTION
S YSTEM
INTANK
RETRACTABLE
SUBMERGED MOTOR PUMP
T YPICAL P ROCEDURE
F OR P UMP R ETRACTION
HOLD PUMP IN
PLACE USING
OVERHEAD HOIST OR CLAMP REMOVE
CRANE SUPPLIED BY PROVIDED WITH ELECTRICAL
OTHERS LIFTING ROD SYSTEM
LIFTING
ROD
LIQUID
DISCHARGE
GN2
PURGE
1Pump in operational 2 Stop the pump, 3 Close suction 4 Discharge LNG 5 Release column
condition isolate electrical valve assembly’s from column by pressure and
connections bottom sealing plate pressurising with GN2. equalise to
by raising lifting rod Column is empty atmosphere before
at headplate using when GN2 column loosening head
hoist or crane pressure fluctuates plate. Then remove
indicating gas is electrical system.
escaping into tank.
LIFTING SPECIAL TOOL
HEAD CABLE SUPPORT SUPPORT SUPPORT
PLATE PIN PLATE WITH CABLE
PIN
LIFTING
CABLE
SUPPORT
CABLE
PIN
LIFTING
CABLE PLATE
HOLDER
CABLE CLAMP
BLOCKS WITH
SPREADER
BARS LOCATED
APPROX
3 METER
INTERVALS
6 Lift complete 7 Set support plate 8 Disconnect head 9 Secure lifting 10 Hoist pump by
assembly using over- and insert support plate from support cable to hoist / lifting cable. Then
head crane or hoist. pin. Loosen lifting cable and store on crane drum. remove support
Maintain positive GN2 cable from deck, protect gasket plate and pin.
flow into column while headplate mounted seal surface.
open to atmosphere. cable holder.
Ensure all tools and
personal effects are
secure to avoid falling
into column and
personnel work under
monitored conditions
upwind of column.
THE INSTALLATION PROCEDURE IS THE REVERSE OF THE RETRACTION PROCEDURE.
•The column is to be pressurised with GN2 •Slowly bleed off column pressure allowing
in order to remove any liquid which may the liquid to enter the column from the
have accumulated since removal of unit. tank at a rate equivilant to 25mm /min
Then equalise column pressure to per cooldown details in IOM.
atmosphere before attempting to open •Complete all electrical hook ups and
and remove headplate or electrical system. checks. Ensure column pressure is
•Where possible leave pump installed equalised with tank pressure in order to
overnight suspended above suction valve avoid possible dry running of the pump
in order to cool down slowly in gas especially at low tank liquid levels.
otherwise, purge column to tank pressure.
•Lower pump until valve is fully open as per
dimensions included on data plate
(completed during pump initial installation).
SPECIAL TOOL
CABLE REEL USED
TO STORE POWER
AND SUPPORT
CABLE WHILE
PUMP IS OUTSIDE
THE COLUMN
GN2
ASIAN OFFICE
EBARA INTERNATIONAL CORPORATION
CRYODYNAMICS DIVISION
NISSAY AROMA SQUARE, 5-37-1 KAMATA
OHTA-KU, TOKYO 144-8721, JAPAN
TEL: +81 (3)5714 6638
FAX: +81 (3)5714 6892