Floorplan 2

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

SCHEDULE OF WALL FINISHES

MARK DESCRIPTION
6’ THK CHB WALL WITH PLAIN
WF-1 CEMENT PLASTER IN PAINT FINISH
BOTH SIDES
4’ THK CHB WALL WITH PLAIN
WF-2 CEMENT PLASTER IN PAINT FINISH
BOTH SIDES

SCHEDULE OF WALL FINISHES


MARK DESCRIPTION
FL-1 NON-SKID CEMENT FLOOR FINISH

FL-2 300mm x 300 mm UNGLAZED


CERAMIC FLOOR TILES

FL-3 NON- SKID CEMENT FLOOR FINISH


WITH 6mm GROOVE LINES

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION SHEET CONTENTS APPROVED BY: RECOMMENDED BY: SHEET NO.
PROVINCE OF OCCIDENTAL MINDORO
REGION IV-B MIMAROPA

CONSTRUCTION OF • FLOOR PLAN ENGR.RODOLF S. ASEJO


OFFICE OF THE PROVINCIAL AGRICULTURAL AND ABE-OIC DIVISION
MECHANICAL DRYING FACILITY
BIOSYSTEMS ENGINEERING
MAMBURAO, OCCIDENTAL MINDORO DATE:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION SHEET CONTENTS APPROVED BY: RECOMMENDED BY: SHEET NO.
PROVINCE OF OCCIDENTAL MINDORO
REGION IV-B MIMAROPA

CONSTRUCTION OF • PERSPECTIVE VIEW OF ENGR.RODOLF S. ASEJO


OFFICE OF THE PROVINCIAL AGRICULTURAL AND ABE-OIC DIVISION
MECHANICAL DRYING FACILITY WALL AND FOUNDATION
BIOSYSTEMS ENGINEERING
STRUCTURE
MAMBURAO, OCCIDENTAL MINDORO DATE:

You might also like