Professional Documents
Culture Documents
ASS2
ASS2
2020476434
7A2
5.0 Tasks to be carried out
The PFD diagram of a plant of the production of ethylene from ethanol is shown in Appendix
1. The temperature of the streams (oC) are shown in the box. The stream condition is listed
in Table 1.
1. Identify the streams those require heating and cooling and calculate the heat content
(10 marks)
Sample Calculation:
𝑄 = 𝑚𝐶𝑝∆𝑇
𝑘𝐽
𝑄1 = (100 𝑚𝑜𝑙) (7.6 ) (45℃ − 78℃)
𝑚𝑜𝑙℃
𝑄1 = −25080 × 103 𝐽
2. Design the heat integration for the heat exchanger network using the MUMNE
algorithm:
• Choose a minimum approach temperature of 10 oC and construct a
Temperature Interval Diagram.
(10 marks)
Sample Calculation:
𝑄 = 𝑚𝐶𝑝∆𝑇
𝑘𝐽
𝑄𝐴 = (1060 )(545℃ − 510℃)
℃
𝑄𝐴 = 37100 × 103 𝐽
(10 marks)
37100
67100
20180
41480
70100
28500
14797.2
Pinch Pinch
0
a b
6594
• Determine the minimum number of heat exchanger above and below the pinch.
(10 marks)
• Determine the heat exchanger network above and below the pinch.
(15 marks)
Sample Calculation:
𝑘𝐽
𝑄2 = (399.66 ) (145℃ − 117.76℃)
℃
𝑄2 = 10885.10 × 103 𝐽
Sample Calculation:
𝑘𝐽
𝑄8 = (640 ) (35.63℃ − 0℃)
℃
𝑄8 = 22803.2 × 103 𝐽
• Construct the MUMNE network diagram.
(10 marks)
3. Design the revision PFD based on the new heat exchanger network.
(15 marks)
4. Calculate the cost of heat exchanger network without and with heat integration. Use bare
module cost to determine the cost of equipment (HE). Use the following assumptions:
Assumption:
• Only the effect of Q will be considered in this case.
• The other variables effect will be considered as the same for all HE: ✓ Shell and tube heat
exchanger with u-tube head type
✓ U = 10 kJ/hr m2 K
✓ ΔTLMTD = ΔT.
✓ f = 1. (10 marks)
𝑄
𝐴=
𝑘𝐴∆𝑇
Stream Area
K1 K2 K3 (HE) delta T Q (x 10^3 J) (m2) log10 Cp Cp
4.1884 -0.2503 0.1974 1 62.76 25080 39.96176 4.293892 19673.96
2 17 10885.1 64.03 4.380383 24009.47
3 83.33 88320 105.9882 4.491147 30984.71
4 173 131480 76 4.415927 26057.15
5 178.01 135298.4 76.00607 4.415944 26058.17
6 15 5994 39.96 4.293884 19673.63
7 33.53 22803.2 68.00835 4.392635 24696.48
𝑙𝑜𝑔10𝐹𝑝= 𝐶1+𝐶2𝑙𝑜𝑔10𝑃+ 𝐶3(𝑙𝑜𝑔10𝑃)2𝑙𝑜𝑔10 𝐹𝑝 = 𝐶1 + 𝐶2 𝑙𝑜𝑔10 𝑃 + 𝐶3 (𝑙𝑜𝑔10 𝑃)2
From plotted
graph, Fm = 1.7
C1 C2 C3 P log10 Fp Fp
0.03881 -0.11272 0.08183 8 0.003752 1.008677
From plotted
graph, Fm = 1.7
HE Cp B1 B2 FM Fp CBM
1 30986.59569 1.63 1.66 1.7 1.008676527 138711.0357
2 19673.62762 1.63 1.66 1.7 1.008676527 88068.7021
3 24695.04211 1.63 1.66 1.7 1.008676527 110546.9895
4 26057.15019 1.63 1.66 1.7 1.008676527 116644.4461
5 26057.15019 1.63 1.66 1.7 1.008676527 116644.4461
6 26057.15019 1.63 1.66 1.7 1.008676527 116644.4461
7 24004.26587 1.63 1.66 1.7 1.008676527 107454.7399
Total Cost 794714.8057 at 2001
(10 marks)