Technical Specification 1
The Peak Monobore “SIM Lock” system has been developed as a selective system for setting at any
chosen depth inside Monobore type completions, or within Well Bore Tubulars where existing
production Nipples are damaged.
The Running Tool & SIM Lock is run into the well on the end of a conventional Slickline Toolstring.
Once the setting depth has been reached the lock is selectively set by activating Serrated Tubing
Slips via a J-Slot mechanism and drag springs within the Running Tool.
This is achieved by the operator stopping the winch slightly deeper than the required Lock setting
depth, Then simply pulling back on the winch controls to pick up the Toolstring & stopping at the
selected setting depth. Once the operator sits back down again the J-Slot will activate the slips
preventing the Lock and Running Tool from traveling back down the hole. At this stage, if the
Operator wishes to alter the setting position, the tool depth can be adjusted by picking back up on
the winch controls. The J-Slot will rotate allowing the slip mechanism to retract. The depth the
locking system relies upon expanding slips activated by mechanically jarring down with Spang
Jars. If the SIM Lock is run in conjunction with a Sealing Element; the Element is also compressed
at this Jarring down stage to seal against both the Tubing Wall and the inner Element Mandrel.
Once the Operator is satisfied that there has been sufficient jarring down then a “Check Pull” is
applied. If the Check Pull is satisfactory then the Running Tool is released and retrieved by Jarring
upwards. A Tell Tale Shear Pin on the Running will confirm that the SIM Lock is correctly set.
As an option the SIM Lock can also be set in conjunction with most readily available Pyrotechnically
activated setting tools (Baker, Owen, Halliburton…) with the use of either Electric line or a Slickline
Initiator Firing System.
Applications
Installation of a retrievable Straddle System to isolate / shut off unwanted water producing zones.
Suspending Gauges anywhere within the Tubing as the Ported “Bomb Hanger” version.
Well bore isolation as a mechanical barrier along with an equalizing facility as the SIM Plug version.
Installation of an internal annulus section to extend a wells Gas lift Well fluid from below the upper production packers or to reach
receding Fluid levels.
Downhole choke or Pump Open assembly
Tubing stop
Features
Debris Catcher Sub option for Equalising Prong version
High temp setting element.
Sour service sealing & metal components
Large “Through Bore” when used in Straddle applications reducing down hole “Choke” effect.
High temperature rating.
Interchangeable components for adapting generic SIM Lock assembly to suit Multiple Applications.
Benefits
Choice of Varying Drag Spring configurations to suit operating in High angle wells.
Multiple setting options – mechanically or pyrotechnically.
Simplistic Lock design with all major working components paced within the Running Tool.
Multiple Equalising assembly options for SIM Plug version – Melon Type, Prong Type or Pump Open.
1
SIM Lock
Technical Specifications
Description: 2-7/8” SIM Lock
Assembly Number: A351-2200-001
Redress Kit :- PRK351-2200-001 (complete), PRK351-2200-002 (Bomb Hanger No Seals)
Service:- Sour
2
SIM Lock
Ensure 10mm gap is visible between Upper Inner Mandrel and Upper Element Retainer after make
up.
Ensure Key Support Sub correctly positioned and shear screws located in groove. Ensure Ratchet
Sleeve spins freely with the shear screws in place.
Ensure Belleville Spring Washer configuration for upper (32 springs total, set up in doubles) and
lower assemblies (56 springs total, set up in singles.
Ensure Single and Double Belleville Washer Stack lengths are correct when measured in relaxed
position.
Ensure both locking rings installed and correctly positioned. Before RIH check that lower locking
ring has not fallen into the lock out groove. This can be viewed through the hole in the Upper
Spring Cover Sleeve.
Ensure Spigot Shear Screw (SSS-02) installed. NOTE:- Do not remove this screw whilst the
Equalising Assembly or Bomb Hanger subs are made up.
Ensure all connections are tight and secured with correct Grub Screws.
3
Disassembly Steps — SIM Lock
Remove Seals
4
Disassembly Steps — SIM Lock
Step 02 Remove 4 x Grub Screw and unscrew Upper Sleeve. Take care not to lose
either of the 2 x Keys.
Clean Box Thread to
remove Shear Screw
fragments.
5
Disassembly Steps — SIM Lock
Step 03
Using Disassembly tool, remove Ratchet
Sleeve from Upper Sleeve.
6
Disassembly Steps — SIM Lock
7
Disassembly Steps — SIM Lock
Step 05 Unscrew Upper Inner Mandrel and remove Key Support Sleeve.
8
Disassembly Steps — SIM Lock
Step 06 Remove Upper Element Retainer, Snap Ring and Seal Ring.
8
Disassembly Steps — SIM Lock
9
Disassembly Steps — SIM Lock
Inspect Belleville Washers for damage. Stack free length of 32 Springs stacked in doubles (as
shown). Must not be less than 60mm.
10
Disassembly Steps — SIM Lock
Step 09 Remove any Equalising Assembly or other option from SIM Lock lower end.
11
Disassembly Steps — SIM Lock
Inspect Belleville Washer stack for damage. Free length of Spring stack (56 washers stacked
as singles). Must not be less than 130mm.
12
Disassembly Steps — SIM Lock
13
Disassembly Steps — SIM Lock
NOTE:- Take care removing Slips and Upper Slip Support from Slip Cage.
DO NOT FORCE!
14
Disassembly Steps — SIM Lock
3. Clean and inspect all parts. Ensure threads are clean and undamaged.
15
Assembly Steps — SIM Lock
O Ring (132-090V)
(Item 24) and Back up
Rings (132-090V-B)
(Item 25)
16
Assembly Steps — SIM Lock
NOTE- Shear Screws (Item 34) when installed, must locate in upper grove as
shown.
17
Assembly Steps — SIM Lock
Step 03
Shear Screw
(Item 34)
Shear Screws must locate in upper groove to secure Element Retainer Ring. Once Shear
Screws are installed, there should be a 10mm gap as shown.
18
Assembly Steps — SIM Lock
Snap Ring
(Item 21)
19
Assembly Steps — SIM Lock
Step 05 Install Internal Seals 124-090V (Item 26) and Back Up Rings 124-090V-B
(Item 27).
Install External Seals 129-090V (Item 22) and Back Up Rings 129-090V-B
(Item 23).
20
Assembly Steps — SIM Lock
Step 06 Carefully install Seal Ring by “screwing” Seal Ring over Lower Thread.
Followed by sliding Seal Ring over Middle Mandrel.
Snap Ring
(Item 21) Seal Ring - seals already fitted
(Item 10)
21
Assembly Steps — SIM Lock
Step 07 Install Element onto Mandrel. Push Element Seal Ring and Snap Ring into
Element Retainer. Finally screw Element into Element Retainer.
Element
Snap Ring
(Item 21)
22
Assembly Steps — SIM Lock
Step 08 Install Support Sleeve as shown with angled face toward Seal.
Belleville Washers
(Item 18)
Install Belleville Washers in double sets as shown.
Stack Length = 65mm Maximum, 60mm Minimum.
23
Assembly Steps — SIM Lock
Step 09
24
Assembly Steps — SIM Lock
Snap Ring
(Item 21)
NOTE Ensure Snap Ring is positioned within Belleville Spring Housing prior to assembling Slip
Cage Assembly.
25
Assembly Steps — SIM Lock
Slip Cage
(Item 14)
26
Assembly Steps — SIM Lock
Step 12 Place all 3 of Garter Springs on 1 of Slip, then pass the other Slips through the
Garter Spring one at a time.
Slips
(Item 23)
Garter Springs
(GSP-14)
27
Assembly Steps — SIM Lock
28
Assembly Steps — SIM Lock
Step 14 Slide Slip Assembly over Mandrel and make up to Spring Cover Sleeve.
29
Assembly Steps — SIM Lock
30
Assembly Steps — SIM Lock
31
Assembly Steps — SIM Lock
Ratchet Sleeve
(Item 09)
32
Assembly Steps — SIM Lock
Step 18
33
Assembly Steps — SIM Lock
Step 19
34
Assembly Steps — SIM Lock
NOTE:- Ensure screw head does not prevent ratchet sleeve from rotating.
35
Assembly Steps — SIM Lock
Grip here
36
Assembly Steps — SIM Lock
Step 22
Ensure ‘hidden’ Grub Screw
(GSU-02) is inserted.
(Item 30)
37
Assembly Steps — SIM Lock
Step 23 Install Spring Cover Sleeve and 56 x Belleville Washers stacked as shown in
singles.
38
Assembly Steps — SIM Lock
Step 24
Melon Equalising
Assembly
P-Style Equalising
Assembly
Bomb Hanger
39
Assembly Steps — SIM Lock
NOTE:- Try to align split in the Internal Ratchet Ring with one of the 2 x
Release Keys. A light tap with a copper mallet on the Upper Sleeve open end
may be required in order to assist with starting the threaded connection.
40
Assembly Steps — SIM Lock
Step 26
41
Assembly Steps — SIM Lock
Step 27
Install Fishing Neck
(Item 01) and lock with
Grub Screw GSU-02
(Item 30).
42
Assembly Steps — SIM Lock
Step 28
43