Whole Building

Life Cycle
Assessment Tools

This paper was developed by WAP Sustainability with the support of the American
Chemistry Council. It is not intended and should not be interpreted to endorse or dis-
favor any particular tool or tools but aims to provide users and product manufacturers
useful information regarding the tools as they pertain to specific project needs.

In building and construction, emissions throughout the whole sophistication, and accuracy. The
greenhouse gas (GHG) emissions lifecycle of a building. WBLCA Tools table provides information
(or “carbon impacts”) are often on some of these tools’ capabilities
differentiated into two categories: Whole building life cycle assessment and limitations that readers can
operational carbon (OC) (attributed (WBLCA) is one of the most evaluate as they determine which
to operational energy consumption comprehensive ways to communicate tools best address their own needs
during the building’s lifetime) and total carbon impacts of buildings and and circumstances. Due to space
embodied carbon (EC). Embodied building materials. WBLCA tools compile limitations, the table does not include
carbon of building materials includes data to estimate the environmental all available tools but provides
estimated GHG emissions associated impacts of a building throughout its information on those commonly used.
with material extraction, manufacturing useful life, including its Global Warming Users are encouraged to evaluate
and transportation, construction, Potential (GWP). The results of a additional informational sources
maintenance, replacement/repair, WBLCA inform strategies to reduce to support informed, independent
demolition/deconstruction, and carbon impacts of the building during decision-making. While the presented
disposal). Addressing both OC and EC its lifetime. information is believed to be accurate,
categories through a “total” or “whole no warranties are provided.
life” carbon approach enables a more Various tools are available for WBLCAs.
comprehensive strategy to reducing These tools range in maturity,

Data Quality
The data quality supporting each of For example, the main sources of are limited and mostly assess integrity
these tools is varied. It is affected by life cycle inventory (LCI) data are of the building model and not quality of
multiple factors, such as: two databases: GaBi and Ecoinvent. LCA data.
Both datasets offer different and
• quality and consistency of life competing levels of quality. LCI data In some cases, WBLCA models omit
cycle inventory (LCI) data; feeds WBLCA evaluations and tool entire categories of materials, such as
• EPD database inconsistencies; functionality. Industries also often fund mechanical, electrical, and plumbing
• EPD availability; LCI development to ensure WBLCA (MEP) equipment, due to lack of
• manual input and data tools are appropriately characterizing reliable LCI data. If it is modeled, the
transmission errors; the environmental impacts of their data is very generalized and
• tool multipliers; products. For now, software tools will contributes to issues with using
• the inclusion of products data use different data sources, variables generalized data. Manufacturers in
derived from various PCRs and and assumptions to support modeling EC-emerging industries are quickly
different versions of PCRs; based on their individual value collaborating on rules and best
• differences in background data proposition to their customers, which practices for adding their products to
processing; creates inconsistencies in results and WBLCA tools.
• etc. interpretation.
It is important for users to understand
Additionally, at this time there are few A study comparing Tally and Athena’s the limitations of data generation and
capabilities in these tools to assess assessment results on the same modeling in the context of making
and communicate the quality of data building assembly revealed up to a building and material decisions.
sources or provide any indication to 42% variance between their calculated There is ongoing work throughout
users of unreasonable assumptions global warming potential. In addition, the entire process from LCI data
or uncertainty in the data. This is material or assembly data is often very consistency to collaboration within
sometimes partially indicated in the broad and averaged in modeling tools industries and updates to WBLCA
tool documentation, but is generally that do not pull product specific LCA software improvements to ensure that
not emphasized within the tool or user or EPD data from a database. Even reliable data is being used to make
interface. This can lead to compounding with specific data, often the underlying good decisions. Further, the increasing
errors that are not transparent in assumptions and data transformations, number of product specific EPDs being
the results supplied to tool users and when factored into assembly or building developed by manufacturers will
factored into design and procurement models, are difficult to view and likely decrease overall dependency on
processes. understand. Quality check capabilities background LCI data in the future.
Carbon Impact Tool Descriptions

Athena Impact Estimator for Buildings


https://calculatelca.com/software/impact-estimator/

The Athena Impact Estimator for Users can also import their own bill of tool. Transportation, localization, and
Buildings (Athena IE) evaluates whole materials from any CAD program, as an service life values per material cannot
or partial buildings from an input alternative to manual input. be modified.
of building assemblies or a bill of
materials. Athena IE primarily functions Athena IE can be used in any design Athena IE does not include an
as a text-based LCA tool where stage. operational energy modeling capability,
users describe building assemblies but it does allow users to enter
through dialogue boxes that request Athena IE data is regionally customized separate energy modeling data to
simple information like bay sizes within North America and drawn compute total carbon impacts. It also
and loads. The software calculates a from the proprietary Athena Life does not have a way to QC the process
bill of materials and the associated Cycle Inventory (LCI) database, the or results.
environmental impacts. Thus, users US LCI database, and Ecoinvent.
select and add elements to represent Environmental Product Declarations The software was updated in 2020, and
the building as closely as possible. (EPDs) cannot be accessed from the a new version is expected in 2023.

Buildings and Habitats object Model (BHoM)


Life Cycle Assessment Toolkit
https://bhom.xyz/

Buro Happold’s BHoM is an open- As an example of the tool’s BHoM facilitates interoperability and
source model supported by architects, capability, users can pull building enhances data and models in other
engineers, and software developers that information modeling (BIM) data and WBLCA tools but is not a standalone
provides a single common language to objects from Revit into Grasshopper, tool that is capable of producing a
facilitate data transfer between design Dynamo or Excel, apply EPD data WBLCA on its own. The network of
and engineering software tools. Instead sets to those objects, and evaluate contributors aims to enhance workflows
of creating individual translators embodied carbon impacts before between WBLCA tools and improve
between every piece of software, pushing the data back to Revit or to their effectiveness in handling
the BHoM serves as the intermediate other visualization engines for increasing informational complexity
translator, or central model, between all additional analysis. The toolkit also and volume, which will be important for
compatible software. In this way, the supports direct import of material the increase in EPD development and
BHoM is used to relate data between quantities. BHoM connects material digitization of EPD data.
tools that are normally incompatible or quantities to LCA and EPD data from
would require a difficult data transfer or multiple open-source databases
significant manual data input. including EC3, Quartz, ICE, etc.

cove.tool
https://www.cove.tools/embodied-carbon-feature

cove.tool is a web- and plugin-based There are some ways to partially At the material assembly level, the
suite of tools that focuses on early- understand carbon impacts through Assembly Builder feature calculates
stage design phases that require rapid, cove.tool. It has a cost versus energy performance, cost and carbon values
iterative feedback. Its integrated tools optimization feature that runs whole for material assemblies based on the
support rapid 3D modeling and building simulations of multiple EC3 embodied carbon baseline for the
prototyping (drawing.tool), energy material selection options and identifies component product category. Embodied
and daylighting modeling (analysis. the optimal combination of material carbon intensity (kg CO2-eq per unit
tool), HVAC sizing and modeling variables based on cost and energy area) is pre-populated based on the
(loadmodeling.tool), and a lead parameters. Embodied carbon is an materials selected for the assembly
generator that connects manufacturers optional and manual input. Users click with no indication of how it was
and project teams throughout the through to the Embodied Carbon in calculated or the source data, though
modeling process (revgen.tool). It does Construction Calculator (EC3) and the default values and assumptions
not conduct whole building life cycle copy and paste the appropriate value, can be manually updated. An enhanced
assessment or quantify carbon impacts but the value is not factored into the Embodied Carbon Feature has been
of the building design. building model’s energy optimization announced but no release date has
determinations. been published.
Early Phase Integrated Carbon (EPIC) Assessment
https://epic.ehdd.com/
https://epic-documentation.gitbook.io/epic/

The EPIC Assessment tool was The model scope includes building assumed to be natural gas, and its
created to overcome the scarcity of structure: cladding, glazing, and contribution to total energy use is
data in early design phases that could roofing (and replacement of cladding based on averages from the
inform embodied carbon reductions and and glazing); interior fit-out (and Commercial Buildings Energy
assess potential impacts of embodied replacement of interior fit-out); Consumption Survey (CBECS) and
carbon. EPIC’s model includes U.S. mechanical, electrical and plumbing Residential Energy and Consumption
regionally-specific data, forward-looking (MEP) systems; photovoltaic arrays; Survey (RECS) databases. The model
projections, and built-in assumptions and annual landscape maintenance. can account for biogenic/stored carbon
(base case energy use intensity (EUI), Material carbon intensity data is taken from timber-based structural materials
percentage of onsite fossil fuel from other tools and peer-reviewed and site landscaping. The tool has an
combustion, rough building publications, and are either national appendix that documents relevant
dimensions, and interior fit-out averages or product/assembly type assumptions and the calculation
percentage). It allows a user to edit averages. methodology. The beta version of the
specific project parameters and baseline tool was released in June 2022, and
assumptions to test the effects of For operational carbon, EPIC includes two minor updates to fix software bugs
carbon reduction strategies for their the emissions based on state-specific have been released since then.
specific project. grid averages. Onsite fossil fuel use is

Embodied Carbon in Construction Calculator (EC3)


https://www.buildingtransparency.org/

EC3 focuses on the cradle-to-gate product category. The tool does not meet their project goals. Rather than
emissions of construction materials and police data inputs. take a mathematical average and to
sets targets for procurement decisions. account for uncertainty in data, the
Users manually enter material quantity EC3 is most often used as an EPD CLF Baseline marker corresponds to
data to model their construction comparison tool. Select product the threshold where 20% of products
estimates or bill of materials. categories and associated product exceed the desired embodied carbon
A Revit plugin is under development. EPDs are currently available in the intensity. Error bars are provided to
EC3 contains a database of digitized EC3 database. Both product-specific show that there is some room for error
Environmental Product Declarations and industry-wide data are included. in data comparisons. The most recent
(EPDs), which can facilitate a visual Users often review product specific material baselines can be found in CLF’s
and technlogical comparison of key EPDs against the Carbon Leadership 2021 Material Baseline Report.
product attributes extracted from static Forum (CLF) Baseline to determine
documents for products in the same whether that specific product helps

One Click LCA and Carbon Designer 3D


https://www.oneclicklca.com/
https://www.oneclicklca.com/carbon-designer-3d/

One Click LCA is a fully automated web- 3D structure models that allow added to the database but are not
based, text-input software tool that designers to explain carbon intensity to automatically integrated into the
also has a Revit plug-in. It takes data other designers and project owners. software. A warning is displayed for
from sources such as Revit and other such EPDs. If the error is only minor,
BIM models, costing spreadsheets, or One Click LCA integrates data from EPD a user can manually confirm that they
energy models and combines the data platforms to develop its own want to use the EPD. The tool also
into a WBLCA. The software meets construction materials database. allows users to directly add additional
requirements for over 40 green building EPD data is presented as it pertains to or alternative materials and adjust
certification programs. Carbon Designer the project’s specific geography and numerical inputs to compare two or
3D is an add-on early phase tool that target certifications. All data in the more buildings scenarios. The LCA
estimates a building’s carbon footprint One Click LCA database undergoes a Checker function informs users if
based on size and type of building. The ten-point verification using a process materials are missing or if quantities
tool comes with ready-to-use localized that has been reviewed by the Building are reasonable based on project type
reference buildings and allows users Research Establishment (BRE). Some and size.
to create their own scenarios. Carbon EPDs may be deemed to have
hotspots are visualized in heatmaps of ineligible results. They can still be
tallyLCA (Tally) and tallyCAT (Tally Climate Action Tool)
https://choosetally.com/
https://www.buildingtransparency.org/tally/tallycat/

Tally is a Revit plugin that allows users total carbon. Tally utilizes a custom- Revit environment. This addresses a
to determine relationships between designed database that combines lack of interoperability between LCA
BIM elements and information on material attributes, assembly details, tools and BIM-based analysis
construction materials from the Tally and architectural specifications with methods of building design.
database. Tally quantifies a building’s environmental impact data with
or material’s embodied environmental little indication of source data and Collaborators including Building
impacts to land, air, and water systems. pre-populated assumptions and Transparency, Perkins & Will and
Essentially, Tally adds another layer of calculations. The data is specific to the C-Change Labs plan to make tallyCAT
detail to BIM by recognizing materials United States. Tally does not have an a whole-life carbon tool and plan to
that are not modeled explicitly, such ability to assess the quality of results. release an updated version in 2023.
as the steel in concrete assemblies. Both tallyLCA and tallyCAT are on track
Tally was initially developed to translate Building Transparency’s new tool, the to become free and open-access tools.
mass-based life cycle impacts into the Tally Climate Action Tool (tallyCAT),
design process and embed embodied provides real-time synchronization of
carbon information into a building EPD data between EC3 and Revit.
model to understand how material This allows designers to identify
type and weight impact a building’s carbon reduction opportunities in the
One
cove.
WBLCA Tools Athena
IE
BHoM
tool
EC3 EPIC Click Tally
LCA
Design Stage Applicability
SD = Schematic Design SD, DD, Pre-design,
DD = Design Development SD, DD DD SD, DD Procure- Pre-design Early SD, SD, DD
ment and DD

Cost Custom Custom Set license


Free Free Free Free
pricing pricing fee

General Attributes
Ability to QC data and results easily
Ability to sync LCA with geometry updates
Utilizes or links to open-source data
Wide variety of building material types*
Transparency of underlying carbon intensity
assumptions (access to kgCO2e/kg value)

Data Quality and Specificity


Data quality
Populated with assumptions for US context (or US
data is a subset of globally comprehensive database)
Are data updated regularly?

Life Cycle Stages


A1-A3
A4-A5
B1-B4
B6-B7
C1-C3
Module D (Reuse, Recycling, Energy Recovery)
Can include biogenic carbon accounting

Customization of Data
Ability to input energy of construction
Ability to edit transportation distances
Ability to edit operational energy and water usage
Ability to input specific LCA or data without
developer assistance

Output and Results


Ability to QC output**
Export to multiple tools (e.g. Excel, Revit, Rhino…)
Can break out lifecycle impact by material category
(e.g. structure, wall assembly, flooring)
Can break out lifecycle impact by material type
(e.g. steel rebar, PVC flooring)
Can break out lifecycle impact by life cycle stage

* This criterion assesses how many different product categories’ data are integrated into the tool. Product categories available within a tool vary significantly. For example,
EC3 has worked with industry associations to integrate select product category types, focusing on common interpretation of data rather than quantity of data. Other tools like
OneClick LCA connect to as many EPD databases as possible but do less critical work to resolve discrepancies in data quality prior to integration.

** The ability to quality check the output of the tool typically assesses the integrity and completeness of modelling the building and its required components. For example, it
may check structural systems and assemblies for expected components. It will usually not evaluate assumptions, data sources or data quality of the input LCI, LCA or EPD data.

Key

Yes Partial. Some tool aspects Varies. Tool addresses the criterion Unknown. Not enough information
address the criterion. but requires the user to know how to to conclude how the criterion was ad-
manipulate the data or model to fulfill that dressed, or desired outcomes are more
No function. user- and less software-dependent.