Professional Documents
Culture Documents
Group 8 PRESENTATION-3-10
Group 8 PRESENTATION-3-10
Group 8 PRESENTATION-3-10
Jawaharlal Nehru Stadium road, towards Swargate corner elevation – 240 m stretch
Majorly active road due to the commercial 4. 803 – Commercial building - Active
buildings such as hotels, lodge, and offices. frontage.
Non- perishable food stalls on ground floor.
1. 801 – Ganesh Kala Krida Rangmanch-
Passive frontage 5. 804 – Jankalyan Blood Centre – Passive
Temporary food stalls on the footpath frontage
which are not being used.
6. 805 – Natraj Hotel / Travels – Active
2. Central road- Closed due to metro frontage
construction. Bus and Rikshaw stop.
817 816 815 814 813 812 811 821 822 823 824 825
Lokmanya Bal Gangadhar Tilak Road, towards Swargate chowk elevation – 235 m stretch
It had majorly active road and has both commercial and residential building usages.
1. 825 – Bharat petroleum Petrol pump – Active frontage
2. 824 – Gokhale hospital – Passive frontage
3. 823 – Empty Plot– Passive frontage
4. 822 – A.J. crystal – Passive frontage
5. 821 – MCCIA– Active frontage
6. 811 – Mahratta Chamber of commerce and industries – Passive frontage
7. 812 – Dharmavat House – Passive frontage
8. 813 – Sadanand house – Passive frontage
9. 814 – Central Chambers– Active frontage
10. 815 – Sushma Apartment– frontage
11. 816 – MSEB Office – Active frontage
12. 817 – Tandul capital– Passive frontage
13. 818 – Ideal lodge – Active frontage
Elevation
1 2
Area No. 8
Local Food stalls which are Local Food stalls Rajdeep Lodge
no more in use
Activity Mapping
Area No. 8
WEAKNESSES:
1.Locked Open Space: The locked open space represents a missed
opportunity for a community gathering area or a park. Lack of
accessibility may hinder community engagement.
2.Construction Disruptions: Ongoing metro construction cause
temporary inconveniences and affect the aesthetic appeal of the area,
and affects the road usage which causes congestion.
3.Limited Green Spaces: The area lack sufficient green spaces,
affecting the overall aesthetics and quality of life.
OPPORTUNITIES:
SWOT
ANALYSIS
1.Open Space: Transforming the locked open space into a public park
or plaza can enhance community engagement and provide a
recreational area.
2.Urban Design Guidelines: Implementing urban design guidelines
Area No. 8 can ensure a harmonious and visually appealing aesthetic for new
developments.
Vruddhi Bhosle
3.Art and Culture Promotion: Leveraging the statue and the
Akansha Sinha multipurpose auditorium for cultural events can enhance the area's
Isha Gore identity and attract more visitors.
4.Pedestrian-Friendly Initiatives: Introducing pedestrian-friendly
features, such as widened sidewalks and pedestrian zones, can
improve the overall walkability of the area.
THREATS:
1.Construction Disruptions: Ongoing metro construction cause
temporary inconveniences and affects the road usage which causes
congestion of vehicles, and the poor condition of footpath leads the
pedestrian to use the road for walking and can cause accidents.
https://drive.google.com/drive/folders/1wSii_KL9vz1qXuizgeuxs3YM2nFNwcvy?usp=sharing