RMM calibration

Name of work Resurfacing of Runway and allied works services at A/F station Tezpur

Contract Agreement No. CE (AF)SZ/TEZ/18 OF 2022-2023

Client MES GE I (P) (AF) AF STATION TEZPUR

Contractor KCC Buildcon Pvt.Ltd.

Make : RMM no. :

Due date of calibration : Date of calibration :


2 4 6 8 10 12 14 16 18 20
A Wt of water added (%)
2.0 3.9 5.7 7.5 9.2 10.8 12.3 13.8 15.3 16.8
B RMM Reading
2.04 4.06 6.04 8.11 10.13 12.11 14.03 16.01 18.06 20.19
C Corrected moisture content
C6 C7 C8 C9 C10 C11 C12 C13 C14 C15
D Container No.
19.09 17.78 18.80 17.80 18.31 17.15 17.23 17.44 18.08 17.69
E Wt.of container
71.55 70.59 71.259 70.58 70.69 71.56 72.01 72.11 72.52 70.92
F Wt.of wet soil+Container
70.49 68.52 68.25 66.61 65.88 65.68 65.26 64.55 64.19 61.96
G Wt.of dry soil+Container
1.06 2.07 3.01 3.97 4.81 5.88 6.75 7.56 8.33 8.96
H Wt.of water
51.40 50.74 49.45 48.81 47.57 48.53 48.03 47.11 46.11 44.27
I Wt.of dry soil
2.06 4.08 6.08 8.13 10.11 12.12 14.05 16.05 18.07 20.24
J Moisture content

24.00

22.00

20.00 10; 20.19

18.00 9; 18.06

16.00 8; 16.01
Oven dry moisture content %

14.00 7; 14.03

12.00 6; 12.11

10.00 5; 10.13

8.00 4; 8.11

6.00 3; 6.04

4.00 2; 4.06

2.00 1; 2.04

0.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00

RMM (corrected moisture content )%


Lab Engineer Contractor Rep JE (Civil) Engr-in-Charge